Muhammad Waseem, PMP Phd

Muhammad Waseem, PMP Phd

House No 556, Street No 78-C Tel: (+92) 51-2284225 Sector G-8/1, Islamabad Cell: (+92) 321-5182073 44000, Pakistan E-mail : [email protected] Muhammad Waseem, PMP PhD. Scholar Profile . 8 years full time Lectureship experience at FUUAST and 8 to 10 years part time and visiting lectureship at university level (AIOU) . Designed the course of Project Management as specialization for MBA at FUUAST, Islamabad . Center Superintendent for external Exams from Semester 2015 . About 11 years' experience in IT, Telecom and construction industry projects. Overall experience including full time lectureship is about 17 years . Member of PMI - PMP certified . Very good organizational and planning skills . Flexibility and ability to adapt . Familiar with MS Project and SAP . Sincere and honest with a high level of personal and professional integrity . Energized by new challenges, genuine team player and committed to organizational success Experience Federal Urdu University of Arts, Science & Technology (FUUAST) March 2009 – Till Date Lecturer – (Project Management, Management Information System (MIS), Human Resource Management, Information System Analysis (ISA)) . Joined department of Business Administration of FUUAST as a visiting lecturer on 31-March-2009 i.e. Spring 2009 to Autumn 2010 . On 04-Oct-2010 (Autumn 2010) this visiting lectureship converted into contract and this contractual relationship as a lecturer is continued till date . From 17-March-2014, I am in Commerce department . Performed the duties of Incharge Admission Committee for last three semesters for the department of business administration (morning session) . Performed the duties of project coordinator for last two years . Worked as a principal contributor in compiling, editing, modification & updating of course outline document for Board of Studies (BOS) . Worked as a principal contributor in preparation and editing the university prospectus Riphah International University September 2013 . In September-2013 for one semester taught a course at MS level in the program of MS (PM specialization) & MS- Project Management (MSPM) Ericsson Pakistan (Nov 2004 – Dec 2008) Assistant Project Manager – (Construction and Installation of Cell Sites) . To be accountable for the Key Account Manager’s project implementations in terms of delivery according to time schedule, customer satisfaction. To be accountable that all contractual deliverables are fulfilled in accordance to the assignment specification and customer project contract. To provide effective progress monitoring and control in an integrative method, especially during the establishment, realization and hand-over phases to maintain control of both physical progress and cash-flow for the project (SPI, CPI and EVM). To provide regular and accurate project performance and status reporting to internal customers (Project Sponsor and Head of Project Office) and the external customer (Client/Owner). To ensure that the project is executed according to company’s values, applicable directives, guidelines and policies established within Ericsson’s head office as well as Ericsson Pakistan (ECP) and government regulations / laws. Consistently work towards the Company’s Quality Management Standards and Policies. Oversaw the execution of projects . Resolved/escalated problems in a timely manner . Prepared detailed, concise reports on routine basis to accurately reflect project activities/progress . Worked, controlled, planned & monitored the project activities/materials through Project Builder on SAP (MUS). During stay in NDI department I participated in preparation of statement of compliance of RFP’s and managed the Human Resources of the project for SA/CW department. Conducted and participated in the site survey and executed the plan as per the project guidelines in Warid Ph-I & II. Experienced in using Ericsson Internal tools like MORE & SAP and a competent user of these. Shad Enterprises (Jan 1997 – Nov 2004) Manager IT (PM) – (Construction and Maintenance of IT Infrastructure, Monitoring and Execution of Construction Projects) . Accessing the computing & information system requirements of the organization . Assists the CEO in formulating computing policy & project handling . Carried out the required studies . Coordinated administrative and technical aspects . Monitoring the work and managing the network . Ensured compliance with construction, safety and environmental standards and norms . Planning for development and validated plans & estimates . Ensured technical support Professional Member of the Project Management Institute Association . PMP Certification – 2007 Education Ph.D. Scholar Management Science 2018 Bahria University, Islamabad Status In Progress (Started in Semester Spring 2018 i.e. 06-Feb- 2018) Master of Science (MS) Business Administration 2013 Federal Urdu University of Arts, Science & Technology, Islamabad Master of Business Administration (MBA) 1999 University of Arid Agriculture, Rawalpindi Diploma in Computer Applications 1994 Petroman Training Institute (Allama Iqbal Open University) . Certificate of proficiency in English (IELTS) from British Training & Council Islamabad, Pakistan with Band 6.5 Courses . Certification - MCSA & MCSE (Windows 2000) . Certification - MCSA & MCSE (Windows Server 2003) . Certification - MCDBA (SQL Server 2000) . Certification - CCNA . Certification - CompTIA A+ . “Human Skills for Project Managers” conducted by Semcon Project Management, Sweden organized by Ericsson Pakistan. “Project Control with Microsoft Project” conducted by Semcon Project Management, Sweden organized by Ericsson Pakistan. “Project Control with Earned Value” by Semcon Project Management, Sweden organized by Ericsson Pakistan. “PROPS-C for Project Manager” by Semcon Project Management, Sweden organized by Ericsson Pakistan. “PMP Certification Preparation Program Module-I conducted by Semcon Project Management, Sweden organized by Ericsson Pakistan. Diploma in “Service Delivery Maturity Model (SDMM)” from Ericsson’s global E-learning portal. Diploma in “Six Sigma – The Powerful Change Engine” from Ericsson’s global E-learning portal. Diploma in “SAP HRMS ESS & MSS Basic Training” from Ericsson’s global E-learning portal. Diploma in “Individual Performance Management” from Ericsson’s global E-learning portal. SAP Environment Computer Skills ⇒ Worked on Module P12 and used following applications: ⇒ ME23N (Display PO) ⇒ MIGO (Good Movement, GR) ⇒ CJ20N (Project Builder, worked on Material Planning and Control) ⇒ ZZPOMON (PO Monitoring) ⇒ ZMRBR (Blocked Invoice Report) ⇒ CAT2 (Time Sheet) . MS Project . Windows environment “Do media develop eating disorders: A Study with Reference Publication to Young Females of Pakistan” European Journal of Scientific Research Volume 57, Issue 1, (2011) 1. In 5th CBRC Conference presented a paper titled Conference Paper “Practices of Knowledge Management ensures Project Success in Projectized Organization under Project Management” held on November 10, 2016 organized by Capital University of Science & Technology (CUST), Islamabad 2. Presented a paper titled “PMI Project Management Standard – A Source for Achieving Business Excellence, conference held on April 19, 2017 organized by SZABIST, Islamabad .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    4 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us