Sustainability Appraisal (SA) for the Cornwall Climate Emergency DPD

Sustainability Appraisal (SA) for the Cornwall Climate Emergency DPD

Sustainability Appraisal (SA) for the Cornwall Climate Emergency DPD SA Report to accompany Pre-Submission consultation on the DPD February 2021 Quality information Prepared by Checked by Verified by Approved by Ryan Putt Nick Chisholm-Batten Alastair Peattie Alastair Peattie Environmental Associate Director Associate Director Associate Director Consultant Rosie Cox Environmental Planner Revision History Revision Revision date Details Authorized Name Position V5.0 15th February Consultation 15th February Nick Chisholm- Associate 2021 version 2021 Batten Director Prepared for: Cornwall Council Prepared by: AECOM Limited Plumer House Third Floor, East Wing Tailyour Road Crownhill Plymouth PL6 5DH United Kingdom T: +44 (1752) 676700 aecom.com © 2021 AECOM Limited. All Rights Reserved. This document has been prepared by AECOM Limited (“AECOM”) for sole use of our client (the “Client”) in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AECOM and the Client. Any information provided by third parties and referred to herein has not been checked or verified by AECOM, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AECOM. Table of Contents Introduction 1. Introduction .............................................................................................. Introduction Sustainability Appraisal (SA) for the SA Report to accompany Cornwall Climate Emergency DPD Pre-Submission consultation 1. Introduction Background 1.1 AECOM has been commissioned to undertake an independent Sustainability Appraisal (incorporating Strategic Environmental Assessment) in support of the emerging Cornwall Climate Emergency Development Plan Document. 1.2 In January 2019 Cornwall Council declared a climate emergency, with a view to recognising the need for urgent action to address the climate crisis. In response to this, Cornwall Council approved in July 2019 the first version of a Climate Change Action Plan for Cornwall.1 1.3 Included in the Action Plan was a commitment to prepare a Development Plan Document (DPD) to cover the issue of climate change. DPDs, which form part of the Cornwall Local Plan, set out Cornwall Council’s planning policies and proposals. They are subject to community involvement, consultation and independent examination. The Climate Emergency DPD is a statutory planning document that will become part of the Cornwall Local Plan upon adoption. It will be used for decision making on development proposals and therefore must be developed in accordance with the appropriate regulations. 1.4 The Climate Emergency DPD will complement the other DPDs which make up the Local Plan. The overarching document for the Local Plan is the Strategic Policies 2010 – 2030.2 This was adopted in November 2016 and sets out the strategic planning policies for Cornwall. The Strategic Policies document is accompanied by the Site Allocations DPD3, which identifies where new housing and employment uses will be delivered for ten towns/conurbations and two eco-communities in Cornwall, as well as the Minerals Safeguarding DPD4, which identifies areas of mineral resource and infrastructure that are safeguarded for future use. The development plan for Cornwall also includes ‘made’ Neighbourhood Plans, which are used in decision making in the areas that they cover. 1.5 Key information relating to the Climate Emergency DPD is presented in Table 1.1. 1 Cornwall Council (July 2019) Carbon Neutral Cornwall: Climate emergency https://www.cornwall.gov.uk/environment-and-planning/climate-emergency/ 2 Cornwall Council (November 2016) Cornwall Local Plan: Strategic Policies 2010 – 2030 https://www.cornwall.gov.uk/media/22936789/adopted-local-plan-strategic-policies-2016.pdf 3 Cornwall Council (November 2019) Cornwall Site Allocations Development Plan Document https://www.cornwall.gov.uk/media/38344158/allocations-dpd-full-doc-web.pdf 4 Cornwall Council (December 2018) Minerals Safeguarding Development Plan Document https://www.cornwall.gov.uk/media/36180980/minerals-safeguarding-dpd-adoption-december-2018e.pdf AECOM 1 Sustainability Appraisal (SA) for the SA Report to accompany Cornwall Climate Emergency DPD Pre-Submission consultation Table 1.1: Key facts relating to the Climate Emergency DPD Name of Responsible Authority Cornwall Council Title of Plan Cornwall Climate Emergency Development Plan Document (DPD) Subject Development plan document Purpose A DPD is a statutory planning document and the Climate Emergency DPD will become part of the Cornwall Local Plan upon adoption. It will be used to inform decision making on development proposals. Timescale To 2030 Area covered by the plan The DPD covers the area administrated by Cornwall Council (Figure 1.1). Summary of content The Climate Emergency DPD will set out the Council’s planning approach to standards and expectations to deal with the mitigation of (and adaptation to) the impacts of climate change in Cornwall. It will contain a series of policies to inform planning decisions, accompanied by a Policies Map. The DPD focuses on seven key themes: Natural Climate Solutions; Rural Development and Diversification; Town Centres, Design and Density; Sustainable Transport; Renewable Energy and Sustainable Construction; and Coastal Change and Flooding. Plan contact point Jaquie Stenson: Project Manager, Cornwall Council Tel: 01872 327954 Email: [email protected] Guiding principles, objectives and vision for the DPD 1.6 The development of the Climate Emergency DPD has been framed by a series of guiding principles and objectives, as informed by Cornwall’s Climate Change Action Plan. These are as follows: Guiding principles for the DPD • Create policy that helps to develop the right things in the right location, supporting sustainable practice, environmental growth and carbon reduction. • Develop approaches that recognise the current situation in terms of finances, technology and skills (including viability), but be forward looking and as adaptable as we can be, to get to where we need to be faster, particularly in terms of investments and practice. • Be clear what we can and can’t do – and what we need from Government and our partners both inside and outside of the Council to achieve the right change. • Use the process of developing this plan to understand where we need to be now and what needs to inform the development of the next local plan. AECOM 2 Sustainability Appraisal (SA) for the SA Report to accompany Cornwall Climate Emergency DPD Pre-Submission consultation • Balancing interventions. Our plans must reflect all three types of intervention noted above and ensure we carefully evaluate the balance of what they deliver and their impact against the relative return on investment in both the short and long term. • We must consider carefully the balance between investing in incremental changes to the way we live now through mitigation measures and those needed to help Cornwall to address climate change. Some changes may be seen initially as radical and could feel a little uncomfortable but will rapidly come to feel normal. Objectives of the DPD • Decarbonising our lifestyles – reducing carbon in our energy use, building methods, travel and leisure; • Creating resilient communities and nature; • Creating environmental growth and the development and reinforcement of natural systems to protect and enhance our environment; • Rebalancing of the need to travel and how we move around and work; • Ensuring the health and wellbeing of our residents; • Embedding practice and standards around making buildings and places more efficient and reducing use of materials and waste rather than using ‘green gimmicks’; and • Developing a whole system approach. Vision for the DPD 1.7 These principles and objectives frame an overall vision for the Climate Emergency DPD. The Vision Statement for the DPD is as follows: Our vision for the Development Plan document is to find ways to respond to the climate emergency by making expanding the Local Plan approach and supporting the action needed to help Cornwall become carbon neutral by 2030. To help achieve this, developments will need to show that they create energy efficient, sustainable buildings and places where communities can lead resilient and lower impact lives. We will support clean, green energy and will actively work to reduce the energy used, reducing the need to travel and making both rural and urban areas more sustainable. We will expect development, landscapes, buildings and communities to be more biodiverse. They should be safer and more resilient to the challenges of climate change, particularly flooding and coastal erosion. To achieve the vision of being carbon neutral by 2030 everyone in Cornwall will need to use less. The way we manage our land will need to change so it absorbs more greenhouse gas. In the long-term, we must build homes that are more thermally efficient, avoid building in flood plains and design roads and transport infrastructure that is climate resilient. Not all decisions will be popular and there will be costs to achieving change. This is a climate emergency; we need to act now. We are consulting with interested parties throughout the process of developing this DPD. We know of the real benefit these new policies offer by improving health (better air quality, warmer homes, more opportunity to walk and cycle and supporting healthier diets) and creating a more resilient economy with better

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    170 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us