Brown County Parks Reforestation Camp Campground Construction Brown County Parks Village of Suamico Brown County, Wisconsin February 2021 Prepared by: BAUDHUIN SURVEYING & ENGINEERING 312 North 5th Avenue P.O. Box 105 Sturgeon Bay, WI 54235 Phone (920) 743-8211 TABLE OF CONTENTS BIDDING REQUIREMENTS Bid Form and Proposal SPECIFICATIONS Division 02- 02 41 13 Demolition Existing Conditions Division 03- Concrete 03 10 00 Concrete Formwork 03 20 00 Concrete Reinforcement 03 30 00 Cast In-Place Concrete Division 22- Plumbing 22 05 14 Plumbing Specialties Division 26- Electrical 26 05 00 Common Work Results for Electrical 26 05 04 Cleaning, Inspection and Testing of Electrical Equipment 26 05 19 Low-Voltage Electrical Power and Cables 26 05 26 Grounding and Bonding for Electrical Systems 26 24 16 Panelboards 26 24 18 Electrical Pedestals for Campsites Division 31- Earthwork 31 10 00 Site Clearing 31 20 00 Earthmoving 31 22 16.15 Roadway Subgrade Preparation 31 23 16.13 Trenching 31 23 16.16 Structural Excavation for Minor Structures 31 23 19 Dewatering 31 25 00 Erosion Control Division 32- Exterior Improvements 32 11 23.33 Dense Graded Base 32 91 13 Soil Preparation 32 91 13.50 Stormwater Detention 32 92 19 Seeding Division 33- Utilities 33 11 00 Water Utility Distribution Piping 33 30 00 Sanitary Sewerage Utilities SPECIAL PROVISIONS Bathhouse Details Septic Tank Details Grinder Pump Specifications 40347005.doc BID FORM AND PROPOSAL Quantity Item # Description Phase 1 Phase 2 Phase 3 Total Units Unit Price Phase 1 Price Phase 2 Price Phase 3 Price Total Price 1 Erosion control: Silt Fence 4000 550 900 5450 LF 2 Erosion control: Stone Tracking Pad 2 0 0 2 EA 3 Erosion Control: Erosion Control Mat 7100 6035 4530 17665 SF 4 Erosion Control: Seed & Mulch 1 1 1 3 LS 5 Clearing & Grubbing 1 1 1 3 LS 6 * Remove/repaint parking stripes 1 0 0 1 LS 7 * Sawcut Asphalt 80 0 0 80 LF 8 * Remove existing Bridge @ Haller Creek 1 0 0 1 LS Bridge @ Haller Creek; Contech Aluminum 9 * Arch 1 0 0 1 LS 10 Gravel Entrance Drive; 20' Width 2840 0 0 2840 LF Gravel Pull-Off Drive @ Check-In Kiosk; 10' 11 * Width 170 0 0 170 LF 12 Gravel Campground Drive; 20' Width 1865 0 0 1865 LF 13 * Gravel Campground Drive; 18' Width 255 605 720 1580 LF 14 Gravel Drive @ Dump Station; 12' Width 160 0 0 160 LF 15 Gravel Drive & Pad @ Dumpster 560 0 0 560 SF 16 * Gravel Parking Lot 7745 0 0 7745 SF Additional Breaker-Run if subgrade is 17 deficient 300 100 100 500 CY Additional Quarry Wash (if directed by 18 owner) ALTERNATE BID #1 100 100 100 300 CY 19 Dumpster Enclosure Fence 52 0 0 52 LF 20 * CMP Culvert, 15" 45 0 0 45 LF 21 Campsite; Back-In 9 12 8 29 EA 22 Campsite; Pull-Through 0 4 4 8 EA 23 Campsite; Equine 10 0 0 10 EA 24 Campsite; Tent-Only 11 0 0 11 EA 25 4" x 6" pressure treated campsite markers 30 16 12 58 EA 4" x 4" pressure treated directional sign 26 * posts 20 5 5 30 EA 27 Bath House (3 shower) 1 0 0 1 LS 28 * Bath House (2 shower) 1 0 0 1 LS 29 * Bath House - Sidewalk; 5' Width 798 0 0 798 SF 30 6" PVC sanitary sewer 146 0 0 146 LF 31 4" PVC sanitary sewer 108 1010 0 1118 LF 32 2" PVC forcemain 839 0 0 839 LF 1 BID FORM AND PROPOSAL Quantity Item # Description Phase 1 Phase 2 Phase 3 Total Units Unit Price Phase 1 Price Phase 2 Price Phase 3 Price Total Price 33 Duplex grinder pump station and controls 1 0 0 1 EA 34 Concrete Septic Tank 1 0 0 1 EA 35 Sanitary Clean-Out 2 13 0 15 EA 36 Sanitary Riser at Camp Sites 0 15 0 15 EA Dump Station with Manhole and Water 37 Tower 1 0 0 1 LS 38 * 1" PVC water service line 176 0 674 850 LF 39 * 2" PVC water service line 836 1101 317 2254 LF 40 4" PVC water service 554 0 0 554 LF 41 1" ball valve 1 0 1 2 EA 42 2" ball valve 2 3 1 6 EA 43 4" ball valve 2 0 0 2 EA 44 Yard hydrant 7 0 0 7 EA 45 Water Risers 8 15 11 34 EA 46 * Wet Detention Pond A 0 1 0 1 LS 47 * Wet Detention Pond B 0 0 1 1 LS 48 * Wet Detention Pond C 1 0 0 1 LS 49 * Wet Detention Pond D 1 0 0 1 LS 50 Site Grading 1 1 1 3 LS ALTERNATE BID#2 51 Electrical hook-up at campsite 8 15 11 34 EA ALTERNATE BID #2 52 * Site Electrical 1 1 1 3 LS Total Bid Amount Phase 1 Phase 2 Phase 3 Total *Item # CONSTRUCTION NOTES 6 Location: at existing south parking lot; contractor to verify with owner on 7 Location: at existing south parking lot 8 Followed immediately by replacement construction 9 Final Design Plans Forthcoming, Contech quote of $36k for materials (delivered) 11 Length at centerline 13 Phase 1: assumes site 15 as 18' wide turnaround 16 At bathhouses and rustic tent-only campsites 20 Include Apron End Walls 26 owner to verify exact placement and quantity 28 Bathhouse to also house water supply pumps and utilities 29 420 SF for 3 shower bathhouse; 378 SF for 2 shower bathhouse 38 Stub line to Phases 2 and 3, 2' ea 39 Stub line to Phases 2 and 3, 2' ea 46 Include all pond components, per detail 47 Include all pond components, per detail 48 Include all pond components, per detail 49 Include all pond components, per detail 52 Per electrical design, sheet E1-E2. Stub to kiosk location. ALTERNATE BID #2 2 SECTION 02 41 13 DEMOLITION P A R T 1 - G E N E R A L SCOPE The work under this section shall consist of providing all work, materials, labor, equipment, and supervision necessary to provide for the demolition of site work and such features as required in these specifications and on the drawings. Included are the following topics: PART 1 - GENERAL Scope Related Work Safety Permits PART 2 - MATERIALS Equipment PART 3 - EXECUTION Protection of Existing Work and Facilities Demolition Demolition below Grade Demolition Backfill Transportation and Disposal of Demolition Waste RELATED WORK Applicable provisions of the General Conditions and Division 1 shall govern work under this section. Section 31 25 00 – Erosion Control SAFETY Maintain a clean and orderly site. Remove debris at end of each workday. Burning of debris is not permitted. If hazardous materials are not anticipated, but encountered, terminate operations and contact the Engineer immediately. Follow all applicable local, state and federal regulations pertaining to hazardous materials. PERMITS Unless otherwise noted, Contractor shall be responsible for obtaining and paying for all permits necessary to complete demolition work. P A R T 2 - M A T E R I A L S EQUIPMENT Use Contractor's normal equipment for demolition purposes and which meets all safety requirements imposed on such equipment. P A R T 3 - E X E C U T I 0 N PROTECTION OF EXISTING WORK AND FACILITIES Take all measures necessary to safeguard all existing work and facilities which are outside the limits of the work. 7 40347005.doc Furnish and install fencing or other barriers as shown on the plans or as otherwise necessary to protect existing features. Verify the locations of, and protect, any buildings, structures, utilities, paved surfaces, signs, streetlights, utilities, landscaping and all other such facilities that are intended to remain or be salvaged. Make such explorations and probes as necessary to ascertain any required protection measures that shall be used before proceeding with demolition. Provide and maintain adequate catch platforms, warning lights, barricades, guards, weather protection, dust protection, fences, planking, bracing, shoring, piling, signs, and other items required for proper protection. Provide protection for workmen, public, adjacent construction and occupants of existing building(s). Repair or replace any damaged facilities that are not scheduled for demolition. Explosives shall not be used for demolition. Keep streets, walks and all other adjacent paved areas clean and swept clear of dirt, mud and debris deposited as a result of this operation. Protect surrounding area from dust. DEMOLITION Demolish and remove all structures scheduled for demolition as shown on the plans. Carry out vehicle loading as necessary within the project boundaries or as defined or indicated on the drawings, but not in locations that block vehicular traffic on the streets or pedestrian traffic on adjacent public walks. Dismantle each structure in an orderly manner to provide complete stability of the structure at all times. Provide bracing and shoring where necessary to avoid premature collapse of structure. Conduct demolition operations and the removal of rubbish and debris in such a way that a minimum of nuisance dust is caused. Constantly sprinkle rubbish and debris with water if necessary to keep nuisance dust to a minimum. Masonry and concrete shall be demolished in small sections. Where limits of demolition are exposed in the finished work, cutting shall be made with saws, providing an absolutely straight line, plumb, true and square. DEMOLITION BELOW GRADE Demolish below grade features in accordance with the plans. DEMOLITION BACKFILL Backfill and compact below grade areas and voids resulting from demolition of structures and other abandonment and demolition.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages106 Page
-
File Size-