Pillar No Latitude Longitude BP 01 10°44

Pillar No Latitude Longitude BP 01 10°44

APPENDIX VIII (See paragraph 6) FORM 1 M APPLICATION FOR MINING OF MINERALS UNDER CATEGORY ‘B2’ FOR LESS THAN AND EQUAL TO FIVE HECTARE. (II) Basic Information Sl.No Areas Distance in Kilometer/Details (i) Name of the Mining permit Site "Granite Building Stone Quarry" of Mr Abdu Rahman Location/Site (GPS Co-Ordinate) Sy No: 1006 in Painkulam Village, Thalappilly Taluk, Thrissur District, Kerala State. Pillar No Latitude Longitude BP 01 10°44'22.26"N 76°17'23.83"E BP 02 10°44'22.81"N 76°17'27.13"E (ii) BP 03 10°44'21.17"N 76°17'27.65"E BP 04 10°44'18.23"N 76°17'28.55"E BP 05 10°44'17.97"N 76°17'27.03"E BP 06 10°44'17.78"N 76°17'25.37"E BP 07 10°44'20.04"N 76°17'25.51"E BP 08 10°44'20.29"N 76°17'23.87"E Size of the Mining Lease (iii) 1.4054 Ha (Hectare) Capacity of Mining Lease (TPA) It is proposed to produce maximum of 40000 tonnes per (iv) annum of granite building stone. (v) Period of Mining Lease 10 Years (vi) Expected cost of the project 40 Lakhs Mr. Abdu Rahman Nachu Veettil, (vii) Contact Information Kanjhiramukku P.O Malappuram district Kerala No. : 9645915522 Environment Sensitivity Sl.No Areas Distance in Kilometer/Details Distance of Project site from rail or road Vallathol nagar railway line, 1.5 Kms 1 bridge over the concerned River, Rivulet, Nallah etc. 2 Distance from infrastructural facilities Vallathol nagar railway line, 1.5 Kms from the mine. Railway line National Highway NH-47,22 kM State Highway SH-23-2km Panjal-Painkulam road, 1 Kms Major District Road Any Other Road Kolambilpadinjakarapadi road, 1Km Electrical transmission line pole or tower Single line, 0.05kms Canal or check dam or reservoirs or lake Vazhani dam, 11Kms or ponds In-take for drinking water/pump house Shornur, 3 Kms Intake for Irrigation canal pumps Bharathapuzha, 3 Kms Areas protected under international conventions, national or local legislation 3 None within 0.5 Kms of the project site For their ecological, landscape, cultural or other related value. Areas which are important or sensitive for ecological reasons – Wetlands, 4 watercourses or other water bodies, coastal Coastal area:40km, zone, biospheres, mountains, water body-bharathapuzha- 3km, forests forest-Akamala forest-5km, Chulannur peafowl sanctuary-20km Peechi-Vazhani wild life sanctuary-31 km Areas used by protected, important or sensitive species of flora or fauna for 5 No such Protected important species within the breeding, nesting, foraging, resting, over 0.5Km radius from the project site. wintering, migration Inland, coastal, marine or underground 6 Coastal Area-40Km, Water Bodies-Bharathapuzha- waters 3Km, State, National boundaries State boundary-65km 7 Routes or facilities used by the public for National Highway: NH-47,22 kM. State high way: access to recreation or other tourist, pilgrim SH-23-2km. Panchayath Road: 8 areas Kolambilpadinjakarapadi road, 1Km 9 Defense installations None within 0. 5 Km of the project site Densely populated or built-up area , The nearest human settlements are more than 10 distance from nearest human habitation 64.4m away from project site. Areas occupied by sensitive man-made Hospital :Govt Homeopathy land uses (Hospitals, schools, places of hospital,Cheruthuruthy, 1 Kms. School :Govt L.P worship, community facilities) school,Cheruthuruthy 2 Kms. Church 11 :Cheruthuruthy 2km. Temple : Cheruthuruthy Temple, 2Kms. Mosque/Masjid :Kolambumukku mosque,0.3 Kms. Areas containing important, high quality or Forest- Akamala 5km scarce resources (ground water resources, Chulannur peafowl sanctuary-20km 12 surface resources, forestry, Peechi-Vazhani wild life sanctuary-31km agriculture, fisheries, tourism, minerals) Areas already subjected to pollution or environmental damage, (those where 13 Not applicable, since this is Fresh proposal existing legal environmental standards are exceeded) 14 Areas susceptible to natural hazard which No, Permit area is not susceptible to natural Could cause the project to present Hazard, as there is no history of such incidents environmental problems(earthquake, subsidence, landslides, erosion, flooding, or extreme or adverse climate conditions) Is proposed mining site located over or near No fissure/fracture for ground water recharge 15 Whether the proposed involves approval or clearance under the following Regulations or Acts Namely:- 16 (a) The Forest (Conservation) Act, No 1980; (b) The wildlife (Protection) Act, No 1972; No (c) The Coastal Regulation Zone Notification,2011 Not Applicable If yes, details of the same and their status To be given. 17 Forest land involved (hectares) No forest land involved Whether there is any litigation pending 18 against the project and/or land in which the project is propose to be set up? No (a) Name of the Court (b) Cash No. (c) Orders or directions of the court, if any and its relevance with the proposed project. “I hereby given undertaking that the data and information given in the application & enclosures & true to the best of my knowledge & belief & I am aware that if any part of the data & information submitted is found to be false or misleading at any stage, the project will be rejected & clearance give, if any to the project will be revoked at our risk & cost”. Nazar ahamed DMG/KERALA/RQP/7/2016 Date: 11.09.2018 Place: Thrissur (Signature of Proponent Along with name and Address) Mr.Abdu Rahman Nachu Veetil, Kanjhiramukku P.O Malappuram district Kerala .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    3 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us