PRC: Jilin Component, Songhua River Basin Water Pollution Control And

PRC: Jilin Component, Songhua River Basin Water Pollution Control And

Environmental Monitoring Report Project Number: 40665 September 2012 PRC: Songhua River Basin Water Pollution Control and Management Project, Jilin Component (ADB Loan No: 2487-PRC) Prepared by Jilin PMO with the Assistance of Easen International Co., Ltd. for the Jilin Provincial Government and the Asian Development Bank. This report has been submitted to ADB by the Project Management Office of Jilin Province and is made publicly available in accordance with ADB’s public communications policy (2005). It does not necessarily reflectThe views the viewsexpressed of ADB. herein Your are attention those ofis thedirected consul totant the and―Terms do not of Use‖necessarily section representof this website. those of ADB’s members, Board of Directors, Management, or staff, and may be preliminary in nature. TABLE OF CONTENT I. INTRODUCTION 2 A. Report Purpose and Rationale 2 B. Project Objective and Components 2 C. Project Implementation Progress 2 II. INSTITUTIONAL SETUP AND RESPONSIBILITIES FOR EMP IMPLEMENTATION AND SUPERVISION 5 A. Institutional responsibilities for environmental management 6 B. Incorporation of Environmental Requirements into Project Contractual Arrangements 6 III. COMPLIANCE WITH ENVIRONMENT RELATED PROJECT COVENANTS 7 Status of Compliance 7 IV. ENVIRONMENTAL MITIGATIONS AND COMPENSATION MEASURES IMPLEMENTED IN THE REPORTING PERIOD 9 V. SUMMARY OF ENVIRONMENTAL MONITORING 12 A. Monitoring plan and responsibilities 12 B. Environmental Audit upon Project Completion 13 C. Environmental quality targets, sampling and analytical methods 15 D. Monitoring Results 21 E. Assessment 30 VI. PUBLIC CONSULTATION 31 VII. INSTITUTIONAL STRENGTHENING AND TRAINING 33 VIII. KEY ENVIRONMENTAL ISSUES 36 IX. CONCLUSION 36 A. Overall Progress of Implementation of Environmental Management Measures 36 B. Actions Recommended 36 1 I. INTRODUCTION A. Report Purpose and Rationale 1. As defined in the summary environmental impact assessment (SEIA) for Songhua River Basin Water Pollution Control and Management Project (the Project) under ADB Loan, independent environmental reports (EMRs) are to be prepared in order to evaluate and assess overall project activities to ensure the effective implementation of the environmental management plan (EMP). 2. The purpose of the EMR is to document a screening of the environmental activities and consequences of this project for the period of January to December 2011. As the second annual EMR, it will not only cover the construction, commissioning and operation phases, but also demonstrate compliance with the EMP for the design, bidding, and construction preparation stages. In line with targets aimed at reducing the negative environmental impacts of the Project and in accordance with all the relevant specifications and standards of China, as well as the policies of the Asian Development Bank (ADB), this report will emphasize: (i) progress made in implementing the EMPs, (ii) implementation of mitigation measures, (iii) environmental compliance, (iv) institutional strengthening and training, (v) public consultation, and (vi) problems that have occurred and corrective actions taken. B. Project Objective and Components 3. The Project (Jilin Component) will enhance the urban environment and improve public health and the quality of life for urban residents in the project cities and counties in Jilin Province. This will be achieved by increasing wastewater treatment coverage, and enhancing solid waste management (SWM). The outcome of the Project will be reduced pollution and improved wastewater management, and SWM in the Songhua River Basin (SRB). 4. The Jilin component has three subcomponents: (i) wastewater treatment, (ii) solid waste management (SWM), and (iii) river improvement. The first subcomponent includes the construction of 9 WWTPs with a total capacity of 178,000 m3/day and 368 km of sewer pipelines. The second subcomponent includes the construction of 10 sanitary landfill facilities with a total capacity of 2,400 tons per day with service life ranging from 13 to 22 years. The third subcomponent includes river improvement at the source of the Songhua River including (i) 2 WWTPs with total capacity of 3,100 m3/day, (ii) 3 solid waste transfer stations with a total capacity of 40 tons per day, and (iii) 3.8 km of sewer pipelines. C. Project Implementation Progress 5. The Project implementation period is from January 2009 to December 2013 and is proceeding as scheduled. The Project period has elapsed 60%, 36 months out of 60 months. The Project implementation has progressed on weighted average about 75% as of December 2011. The project implementation progress is briefly described in Table 1.1 (as of December 2011). 6. The status of environmental acceptance and audit report preparation for each completed component by a qualified institute in accordance with the Management Guideline on Project Completion Environmental Audit (2001) is summarized in Table 1.2 (as of December 2011). 2 Table 1.1 Project Implementation Progress (as of December 2011) No. Project Status Implementation Description I. Wastewater Treatment Project 1 Dehui City WWTP Commissioning Main earthworks of the fine and coarse screen almost got done and the installation is underway. Gongzhuling City The following work had been completed: boiler 2 Construction Fanjiatun WWTP house, integrated office building, sedimentation tank and disinfected room. 48km pipelines had been completed. 40% of total work has been completed. Out of 48 km sewer pipelines, 32 km had been Gongzhuling City finished. The wastewater pump station had been 3 Sewage Network Construction completed and equipment installation was Upgrade completed. 69% of total work has been completed. 4 Fusong County WWTP Commissioning 5 Fuyu County WWTP Commissioning The civil works were done, equipment installation is ongoing. Out of 89.56km of sewer pipelines, 32 km 6 Jingyu County WWTP Construction had been completed. 60% of total work has been completed. 7 Liuhe County WWTP Commissioning Tonghua County 8 Construction 99% of total works of the WWTP was completed. WWTP 9 Yushu City WWTP Commissioning II. Solid Waste Management Waste dam and its division were completed. Earth work and underground drainage system had completed 95%. 3/4 of impermeable system, leachate and biogas drainage system in dams had 10 Da’an City SWM Construction completed. The following basic work had been completed: office building, boiler house, entrance guard room, metering plant, water pump station and balancing tank. 85% of total work has been completed. The following work had been completed: plant road, landfill separation, office building, Waschhalle, water tank balancing tank, concentrated liquor treatment 11 Fusong County SWM Construction room, metering room, integrate pump station and boiler house. Equipment installation was finished. 98% of total work has been completed. 12 Huadian City SWM Construction 45% of total work has been completed 3 No. Project Status Implementation Description The civil work had been done, equipment installation 13 Huinan County SWM Construction work were done. The plant is in commissioning. 98% of total work has been completed. The following basic work had been completed: office building, boiler house, metering plant, equipment 14 Jiaohe City SWM Construction installation for leachate treatment room, and garage. 80% of total work has been completed. The following basic work had been completed: earth work of waste dam and underground drainage 15 Jingyu County SWM Construction system, main structure work of office building and car washing room. 60% of total work has been completed. The overall work had been completed on August 2011. Environmental acceptance was conducted by 16 Liuhe County SWM Commissioning Jilin Province Environmental Protection Bureau on 27 October 2011 Plant road work and management office had been 17 Meihekou City SWM Construction completed. 70% of total work has been completed. The works in landfill area, management area, landscaping and landscaping and plant road 18 Tongyu County SWM Construction workload had all been completed. 92% of total work has been completed. 19 Yushu City SWM Construction 90% of total work has been completed. III. River Improvement Donggang solid waste transfer station had been Changbaishan completed. Out of 3.83 km sewer pipelines in Baixi Mountain Committee 20 Construction Town, 0.96 km had been finished. 900 m asphalt Songhua River concrete road had been completed. 18% of total Rehabilitation work has been completed. 4 Table 1.2 Status of Environmental Acceptance and Audit Report (as of December 2011) The Qualified Institute who The time to get through No. Project prepared the Environmental environmental acceptance Acceptance and Audit Report I. Wastewater Treatment Project Changchun City Environmental 1 Dehui City WWTP 30 June 2010 Monitoring Center Gongzhuling City 2 Not due Fanjiatun WWTP Gongzhuling City 3 Sewage Network Not due Upgrade Baishan City Environmental Monitoring 4 Fusong County WWTP 28 December 2010 Station Songyuan City Environmental 5 Fuyu County WWTP 15 November 2010 Monitoring Station 6 Jingyu County WWTP Not due Liuhe County Environmental 7 Liuhe County WWTP 22 October 2010 Monitoring Center Tonghua County 8 Not due WWTP Changchun City Environmental 9 Yushu City WWTP 30 September 2010 Monitoring Center II. Solid Waste Management 10 Da’an City SWM Not due 11 Fusong County SWM Not due 12 Huadian City SWM Not due 13 Huinan County SWM Not due 14 Jiaohe City SWM Not due 15 Jingyu County SWM Not due Liuhe

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    37 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us