Summary Audit Report 2014

Summary Audit Report 2014

September 2014 INTERNATIONAL CYANIDE MANAGEMENT CODE RECERTIFICATION AUDIT Gold Fields Australia Pty Ltd Granny Smith Gold Mine Recertification Audit Summary Audit Report Submitted to: International Cyanide Management Institute (ICMI) Gold Fields Australia Pty Ltd 1400 I Street, NW Suite Level 5/50 Colin Street 550 WASHINGTON DC 2005 WEST PERTH WA 6005 Report 147648007-003-R-Rev1 REPORT Number. Distribution: 1 Electronic Copy – Gold Fields Australia Pty Ltd 1 Electronic Copy – Golder Associates Pty Ltd GRANNY SMITH GOLD MINE – ICMC RECERTIFICATION AUDIT SUMMARY AUDIT REPORT SUMMARY AUDIT REPORT FOR OPERATIONAL GOLD MINES Name of Mine: Granny Smith Gold Mine Name of Mine Owner: Gold Fields Australia Pty Ltd Name of Mine Operator: GSM Mining Company Pty Ltd Name of Responsible Manager: Stuart Mathews, General Manager Address: Granny Smith Gold Mine Gold Fields Australia Pty Ltd Level 5/50 Colin St West Perth 6005 State/Province: Western Australia Country: Australia Telephone: +61 8 9088 2200 Fax: +61 8 9031 3103 Email: [email protected] LOCATION DETAIL AND DESCRIPTION OF OPERATION: Gold Fields is one of the world’s largest unhedged producers of gold. In Australia, Gold Fields operates four gold mines in Western Australia – Agnew, Darlot, Granny Smith and St Ives. Granny Smith Gold mine is located 720kms east-north-east of Perth in Western Australia and 23 km south west of Laverton, Western Australia near Mount Weld. Granny Smith Gold Mine was commissioned in 1989 and at the time the mine was expected to have an eight year mine life but has remained in continual operation since commissioning and has produced over 6 million ounces of gold. Granny Smith Gold Mine was one of the three Yilgarn South Assets acquired from Barrick Gold of Australia by Gold Fields in October 2013. The processing plant consists of two-stage fresh ore crushing circuit with closed circuit screening and a single-stage oxide ore crushing circuit, a semi-autogenous grinding mill in closed circuit with a cone crusher, an agitation leaching and carbon-in-pulp circuit, tailings gravity re-treatment plant with fine grind, a gold recovery plant with carbon reactivation, and a tailings thickener. Granny Smith is exclusively a Fly in Fly out site from Perth, Western Australia. Granny Smith Gold Mine 16 September 2014 Name of Facility Signature of Lead Auditor Date September 2014 Report No. 147648007-003-R-Rev1 GRANNY SMITH GOLD MINE – ICMC RECERTIFICATION AUDIT SUMMARY AUDIT REPORT SUMMARY AUDIT REPORT AUDITORS FINDINGS Granny Smith Gold Mine is: in full compliance with The International in substantial compliance with Cyanide Management Code not in compliance with No significant cyanide incidents or cyanide exposures and releases were noted as occurring during the audit period. Audit Company: Golder Associates Mauritius Audit Team Leader: Ed Clerk, Exemplar Global (105995) Email: [email protected] Name and Signatures of Other Auditors: Name Position Signature Date Ed Clerk Lead Auditor and Technical Specialist 16 September 2014 Mike Woods Auditor 16 September 2014 Dates of Audit: The Recertification Audit was undertaken over three days between 11 and 13 March 2014. I attest that I meet the criteria for knowledge, experience and conflict of interest for Code Verification Audit Team Leader, established by the International Cyanide Management Institute and that all members of the audit team meet the applicable criteria established by the International Cyanide Management Institute for Code Verification Auditors. I attest that this Summary Audit Report accurately describes the findings of the verification audit. I further attest that the verification audit was conducted in a professional manner in accordance with the International Cyanide Management Code’s Gold Mining Operations Verification Protocol and using standard and accepted practices for health, safety and environmental audits. Granny Smith Gold Mine 16 September 2014 Name of Facility Signature of Lead Auditor Date September 2014 Report No. 147648007-003-R-Rev1 GRANNY SMITH GOLD MINE – ICMC RECERTIFICATION AUDIT SUMMARY AUDIT REPORT Table of Contents PRINCIPLE 1 – PRODUCTION .......................................................................................................................................... 1 Standard of Practice 1.1 ............................................................................................................................................. 1 PRINCIPLE 2 – TRANSPORTATION ................................................................................................................................. 1 Standard of Practice 2.1 ............................................................................................................................................. 1 Standard of Practice 2.2 ............................................................................................................................................. 2 PRINCIPLE 3 – HANDLING AND STORAGE .................................................................................................................... 2 Standard of Practice 3.1 ............................................................................................................................................. 2 Standard of Practice 3.2 ............................................................................................................................................. 4 PRINCIPLE 4 – OPERATIONS .......................................................................................................................................... 4 Standard of Practice 4.1 ............................................................................................................................................. 4 Standard of Practice 4.2 ............................................................................................................................................. 8 Standard of Practice 4.3 ............................................................................................................................................. 9 Standard of Practice 4.4 ........................................................................................................................................... 11 Standard of Practice 4.5 ........................................................................................................................................... 12 Standard of Practice 4.6 ........................................................................................................................................... 12 Standard of Practice 4.7 ........................................................................................................................................... 13 Standard of Practice 4.8 ........................................................................................................................................... 14 Standard of Practice 4.9 ........................................................................................................................................... 15 PRINCIPLE 5 – DECOMMISSIONING ............................................................................................................................. 15 Standard of Practice 5.1 ........................................................................................................................................... 15 Standard of Practice 5.2 ........................................................................................................................................... 16 PRINCIPLE 6 – WORKER SAFETY ................................................................................................................................. 17 Standard of Practice 6.1 ........................................................................................................................................... 17 Standard of Practice 6.2 ........................................................................................................................................... 18 Standard of Practice 6.3 ........................................................................................................................................... 19 PRINCIPLE 7 – EMERGENCY RESPONSE .................................................................................................................... 20 Standard of Practice 7.1 ........................................................................................................................................... 20 Standard of Practice 7.2 ........................................................................................................................................... 21 Standard of Practice 7.3 ........................................................................................................................................... 21 Standard of Practice 7.4 ........................................................................................................................................... 22 September 2014 Report No. 147648007-003-R-Rev1 i GRANNY SMITH GOLD MINE – ICMC RECERTIFICATION AUDIT SUMMARY AUDIT REPORT Standard of Practice 7.5 ........................................................................................................................................... 23 Standard of Practice 7.6 ..........................................................................................................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    37 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us