STANDARD TEMPLATE STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS/ ACTIVITIES Information to be furnished by the project S. No. Information required proponent Name of the project or activity Mining for M/s. K. Saddru Khan Granites 1. – Colour Granite Quarry 2. Name of the organization/owner Sri. K. Saddru Khan Address for communication Police Line Road, Near Govt. Urdu School, Millerpet, 3. Bellary - 583101, Karnataka 4. Telephone numbers 9686531599, 9980828562 5. Email id of the organization or contact person [email protected] Location of the proposed project or activity Sy. No. 266 Havaligi Village, 6. Vidapanakal Mandal, Anantapur District, Andhra Pradesh 7. Appraisal category (b2 or b1) Category ‘B’ (B2) Nearest habitation and distance from the project 8. Havaligi is the nearest village – 0.67 km (W) or activity 9. Installed capacity / production capacities 2112 Cu.m per Annum Specify the fuel (coal / CNG / biomass/others) Diesel based machinery will be used during quarry 10. and quantity required operations. 200 liters of diesel will be used per day Details of land use/land cover Present land use will be changed with commencement 11. of mining activities. Occupancy, ownership of the land in which the activity is proposed: 12. (government land / private land / forest land Government Land /revenue land /temple land /leased land/ land belongs to other department) If it is a forest land, the following details shall be furnished: (Whether it is a reserved forest / protected forest/demarcated forest/ national parks/ 13. sanctuaries/ any land in possession of forest Not applicable department.) (The village map with Sy. No. Indicating nearest forest boundary line from the site shall be enclosed) 14. Total investment of the project/activity. 30 Lakhs A. Funds allocated for EMP (capital cost and 5.47 Lakhs (capital) recurring cost per annum) 1.89 Lakhs (recurring cost per annum) Brief description of the project with special Air Environment and Pollution Control Measures reference to specific pollution and its control During mining operations fugitive dust emissions will measures. be generated. Control devices such as water sprinklers 15. and covering drill with cloth will reduce the generation of dust. Regular maintenance of vehicles, machinery and DG set shall be carried out in order to minimize the emissions. 1 All overburden dumps shall be stabilized with legumes and grass to prevent the erosion of soil and arrest the dust emission during windy days Noise Environment and Pollution Control Measures Noise levels may be increased during operations and these will be controlled with ears protection/use of latest noise controlled equipment. All vehicles and machinery will be properly lubricated and maintained regularly. Vibrations level during blasting operations and these will be minimized by using low explosives and low quantities. The vibrations may not be caused due to shot hole drilling and since the operations are only for short duration. The impact will be negligible. Water Environment and Pollution Control Measures Garland drains with sedimentation pits will be provided all along the working pit. Pumps of adequate capacity shall be installed to lift the accumulated rain water. Good sanitation facilities (toilets with septic tank followed by soak pits) shall be provided and maintained for good hygienic conditions. Land Environment and Pollution Control Measures Soil can be utilized for reclamation of degraded area. Weathered rock if it is sufficiently soft and devoid of rock fragments can be utilized for roads, filling of road side ditches, formation of approach roads to quarries, construction works etc. The mined out pit will be backfilled, drainage development, spreading, fertilization of soil, leveling and greenbelt will be developed all along the approach roads of mining lease area. The spillages form fuelling of machinery shall be avoided and in case of any spillage the same shall be handled properly. 16. Compliance report on the following : A. Status of compliance of the conditions and environmental safeguards stipulated in the Present proposal is for Environmental Clearance. earlier clearance letters. 2 B. Details of the court cases, if any, pending in any court of law against the project as well as any No court case is pending against the proposed project directions passed by the court relating to the project directly or indirectly. C. Details of the notices, if any, given to the project under section 5 of the environmental No (protection) act, 1986 and section 18 of the air (prevention & control of pollution) act, 1981. 17. Whether the project attracts the provisions laid under the OM dt.16.11.2010 issued by the MoE No & F, GOI, w.r.t. Violation of EIA notification, 2006 and its amendments there of ? (yes / no) 18. Present stage and status of the project : Existing mine 19. Name of the consultant: M/s. Sri Sai Manasa Nature Tech Private Limited 3 .
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages5 Page
-
File Size-