Sri Venkateswara College (University of Delhi) Benito Juarez Road, Dhaula Kuon , New Delhi·11 0021 Dr

Sri Venkateswara College (University of Delhi) Benito Juarez Road, Dhaula Kuon , New Delhi·11 0021 Dr

o ~o~~;§S6 ~~iir"~ Sri Venkateswara College (University of Delhi) Benito Juarez Road, Dhaula Kuon , New Delhi·11 0021 Dr. P. Hemalatha Reddy Ph.: 011·24112196, 24118590, Telefox : 011·24118535 Principal [email protected] 2 7 -IO-21l1~ T he Director, Millistry of ElivirOlllllelit <I:: Fo rest St ate Impact Assesslllent Didsioll-I I Par~ ' a"ar:.lll Bhawan Jo rhagh Road, A li ganj i'\cwDe lh i- II n003 SlIbjl..'(,t : Regarding Envirolllllental Clca rant'l' for the "E\pansioll or s.·j V,:nl..:;tICSwanl Coll ege"a! Ben ilo .Iaurel ' Iarg. Dha ula Kuall. '1e ll Del hi III Sri \ 'elll,,, les ,,"01 r:l Co ll ege (Ulliversitv of D!'I hi). De;] r Si r. \\'e ;m.: hl:rc\\ilh suhmi!li ng 1111..' Form I. I~o r lll 1 \ alpll h: \\jlll (on ...· ".:pll tal pl:l ll alld 1lL'(e"';It'~ ' 1\IlIlCXllr C lor ,'ULIr kinel p~rll'i.tI. Kindly iss li e the [ nvirollmen tal Clearancl' at }Ollf l'Hrlic:-01. Thanking} Oll. Yours S i llcc rd ~ . t# PRIi\C IP AL PRINCIPAL Sri Venkateswara College I: ,tr I . ,\I.!nlyersity of Delhi) _. U h30la 1\:1l~ If;' Ne w Delhi-11 0021 EXPANSION OF SRI VENKATESWARA COLLEGE FORM I BENITO JAUREZ MARG, DHAULA KUAN, NEW DELHI APPENDIX I FORM 1 (I) Basic Information Serial Item Details Number 1. Name of the project/s “Expansion of Sri Venkateswara College” at Benito Jaurez Marg, Dhaula Kuan, New Delhi 2. S. No. in the schedule 8 (a) : Building & Construction Project 3. Proposed Plot Area = 60,703.50 m2 capacity/area/length/tonnage Proposed Built up area = 3,080.264 m2 to be handled/command Total Built up area = 21,778.212 m2 area/lease area/number of wells to be drilled 4. New/Expansion/Modernization Expansion 5. Existing Capacity/Area etc. Existing Built up area = 18,697.948 m2 6. Category of Project i.e. ‘A’ or Category B ‘B’ 7. Does it attract the general N. A condition? If yes, please specify. 8. Does it attract the specific N.A condition? If yes, please specify. 9. Location Plot/Survey/Khasra No. Benito Jaurez Marg, Dhaula Kuan Village Tehsil District South West State Delhi 10. Nearest railway station/airport The Nearest railway station is : along with distance in kms. Chanakyapuri Railway station about 0.57 km in ENE direction and nearest airport is Indira Gandhi International Airport about 7.48 in WSW direction & Dhaula Kuan Metro Station is about 580 m, NW from the college SRI VENKATESWARA COLLEGE (University of Delhi) 1 EXPANSION OF SRI VENKATESWARA COLLEGE FORM I BENITO JAUREZ MARG, DHAULA KUAN, NEW DELHI site. (Source of information: - Google Earth Image). 11. Nearest Town, city, District The college is in Dhaula Kuan Headquarters along with District: South West distance in kms. 12. Village Panchayats, Zilla Deputy Commissioner, South MCD, South Parishad, Municipal Zone, Green Park, New Delhi-110016 Corporation, Local body (complete postal addresses with telephone nos. to be given) 13. Name of applicant Sri Venkateswara College 14. Registered Address Sri Venkateswara College at Benito Jaurez Marg, Dhaula Kuan 15. Address for correspondence : Name Dr. P. Hemalatha Reddy Designation (Principal) (Owner/Partner/CEO) Sri Venkateswara College Address Benito Jaurez Marg, Dhaula Kuan, New Delhi Pin Code 110021 E-mail [email protected] Telephone No. 011-24112196 Fax No. 011-24118535 16. Details of Alternative Sites No examined, if any. Location of these sites should be shown on a topo sheet. 17. Interlinked Projects No 18. Whether separate application Not Applicable of interlinked project has been submitted? 19. If yes, date of submission Not Applicable 20. If no, reason Not Applicable SRI VENKATESWARA COLLEGE (University of Delhi) 2 EXPANSION OF SRI VENKATESWARA COLLEGE FORM I BENITO JAUREZ MARG, DHAULA KUAN, NEW DELHI 21. Whether the proposal involves No approval/ clearance under: if yes, details of the same and their status to be given. (a)The forest (Conservation) act, 1980? (b) The wildlife (Protection) act, 1972? (C) The C.R.Z Notification, 1991? 22. Whether there is any NBC Guidelines 2005. Government Order/Policy MPD 2021. relevant/relating to the site? 23. Forest land involved (hectares) No 24. Whether there is any litigation No pending against the project and /or land in which the project is propose to be set up? (a) Name of the Court (b) Case No. (c) Orders/directions of the Court, if any and its relevance with the proposed project. (II) Activity 1. Construction, operation or decommissioning of the project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S. Information/ checklist Yes/No Details thereof (with approximate No. confirmation quantities/ rates wherever possible) with source of information data 1.1 Permanent or No Sri Venkateswara college is existing temporary change in college and an academic building is land use, land use or proposed. So, it does not involve activity of topography including any type. It is anticipated that the increase in intensity of construction activities of the proposed new land use (with respect to academic building will not have an adverse local land use plan) effect on the land use. Further, local land use planning department will control the type, density and location of development. SRI VENKATESWARA COLLEGE (University of Delhi) 3 EXPANSION OF SRI VENKATESWARA COLLEGE FORM I BENITO JAUREZ MARG, DHAULA KUAN, NEW DELHI 1.2 Clearance of existing No The construction of proposed new land, vegetation & academic building does not require any buildings? clearance of existing Land, Vegetation & Building. 1.3 Creation of new land No The college is already existing there so uses? only new academic building is proposed. So, no creation of new land will be there. 1.4 Pre-construction Yes Soil testing has been done during detailed investigations e.g. bore engineering study. Soil Investigation report houses, soil testing? is enclosed as Annexure II 1.5 Construction works? Yes All construction activities will be confined within the college premises; there will be no physical changes outside the college boundary. 1.6 Demolition works? No No Demolition work will be carried out. 1.7 Temporary sites used No Only local labours will be deployed and for construction works hence no labours camps are required. No, or housing of temporary hutments. construction workers? 1.8 Above ground Yes Excavation will be carried out for buildings, structures or foundation of buildings. The total earthworks including excavated quantity of earth material will be linear structures cut approx. 9,240 m3. The excavated soil will and fill or excavating? be used in backfilling and other area development activities. 1.9 Underground works No No underground works including mining/ including mining or tunneling is required. tunneling? 1.10 Reclamation works? No No reclamation work required. 1.11 Dredging? No No dredging work required 1.12 Offshore structures? No No offshore structures required. 1.13 Production & No No production/manufacturing process manufacturing involved. processes? 1.14 Facilities for storage of Yes Raw material will be stored at site in a goods or materials? covered area. Cement will be separately stored under cover in bales. Sand will be stacked neatly under tarpaulin cover. Bricks and steel will be laid in open. 1.15 Facilities for treatment Yes Solid Waste: or disposal of solid During construction operation phase solid SRI VENKATESWARA COLLEGE (University of Delhi) 4 EXPANSION OF SRI VENKATESWARA COLLEGE FORM I BENITO JAUREZ MARG, DHAULA KUAN, NEW DELHI waste or liquid as well as liquid waste will be generated effluents? During construction: Left over cement and mortars, cement concrete blocks, aggregate, sand and other inorganic material will be recycled and reused as Granular Sub base (GSB) layer of pavement. Earth rendered surplus from the excavation will be utilized in the embankment works. Operational Phase: The total solid waste generated from college is domestic in nature and the quantity of the domestic waste generated is 1,231 kg/day. Solid wastes generated is being segregated into biodegradable (waste vegetables and foods etc.) and non- biodegradable (papers, cartons, thermocol, plastics, glass etc.) components and collected in separate bins. The biodegradable organic wastes is being given to Municipality. Recyclable and non- recyclable wastes is being disposed through Govt. approved agency. Liquid effluents: During construction phase, existing toilets will be provided to staff & workers. During operation phase, wastewater will be treated in inhouse STP. 1.16 Facilities for long term No Local labourers will be hired from nearby housing of operational areas during construction phase. So, there workers? will be no facilities for long-term housing of operational workers. 1.17 New road, rail or sea No The site is adjacent to the Benito Jaurez traffic during Marg. No Internal roads, paths will be construction or developed for vehicular movements for operation? transportation of construction material during construction phase. 1.18 New road, rail, air No The site is adjacent to the Benito Jaurez SRI VENKATESWARA COLLEGE (University of Delhi) 5 EXPANSION OF SRI VENKATESWARA COLLEGE FORM I BENITO JAUREZ MARG, DHAULA KUAN, NEW DELHI waterborne or other Marg. No Internal roads, paths will be transport infrastructure developed for vehicular movements for including new or altered transportation of construction material routes and stations, ports, during construction phase. airports etc? 1.19 Closure or diversion of No Since the site is adjacent to the Benito existing transport routes Jaurez Marg which has low traffic density, or infrastructure leading there is no need for diversion or closure of to changes in traffic existing traffic routes. movements? 1.20 New or diverted No There will not be any new/diverted transmission lines or transmission lines or pipelines around the pipelines? college.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    120 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us