Development Statistics – MARCH 2018 FILE REFERENCE: DB10.2

Development Statistics – MARCH 2018 FILE REFERENCE: DB10.2

Development Services 3/2018 SUBJECT: Development Statistics – MARCH 2018 FILE REFERENCE: DB10.2 The information below is provided for the month of March 2018 in the following areas:‐ Planning & Environment Planning New Planning Applications Lodged Delegated Planning Decisions Council Planning Decisions Graph ‐ Planning Decisions Graph ‐ Planning Timeframes Building & Plumbing: Graph ‐ Total Building & Plumbing Decisions Graph ‐ Building & Plumbing Timeframes Graph ‐ Building & Plumbing Decisions by Type Graph ‐ Building & Plumbing Decisions by Suburb Graph ‐ Building Searches Graph ‐ Boundary Relaxation and Amenity & Aesthetics Decisions Graph ‐ Pool Safety Inspections Graph ‐ Building & Plumbing Inspections Customer Service Requests Graph ‐ New CSRs lodged Graph ‐ CSRs completed Engineering Services Operational Works New Operational Works Applications Lodged Delegated Operational Works Approvals Graph ‐ Operational Works Decisions Miscellaneous Rates Searches 1 PLANNING SECTION NEW APPLICATIONS LODGED – MARCH 2018 Application Date Development Location No. Lodged STATE DEVELOPMENT AREA REFERRAL High Impact Industry (Abattoir & Processing 1261 Gladstone‐Mount Larcom Rd DA/7/2018 13‐Mar‐18 Facility) & Renewable Energy Facility (Solar ALDOGA QLD 4680 Farm) DA/8/2018 Reconfiguring a Lot 1 into 2 8 Warne St GLADSTONE QLD 680 20‐Mar‐18 231 & 263 Rocky Crossing Rd DA/9/2018 Boundary Realignment ‐ 2 into 2 29‐Mar‐18 ROUND HILL QLD 4677 7 Panorama Cl AGNES WATER QLD DA/10/2018 Dwelling House and Secondary Dwelling 29‐Mar‐18 4677 Lot 1 Meegan Rd & Lots 1, 3, 4, 5 & DA/11/2018 Reconfiguring a Lot 8 into 78 (6 stages) 196 Red Rover Rd CALLEMONDAH 29‐Mar‐18 QLD 4680 DELEGATED DECISIONS – MARCH 2018 Application Decision Development Location No. Date Lot 127 CTN 2158, Hickory Ave DA/89/2017 Telecommunications Facility 06‐Mar‐18 KIN KORA QLD 4680 Lot 6 CP 865949, Auckland Jeff Ringland DA/91/2017 Telecommunication Facility 14‐Mar‐18 Dr CALLEMONDAH QLD 4680 Lot 9 SP 103894, Unnamed Rd DA/92/2017 Telecommunications Facility 27‐Mar‐18 YARWUN QLD 4694 DELEGATED POST APPROVAL DECISIONS – MARCH 2018 Application Decision Development Location No. Date 6608 Gladstone‐Monto Rd DA/87/2017 Telecommunication Facility ‐ Negotiated 05‐Mar‐18 BOYNE VALLEY QLD 4680 Lot 151 RP 620579, Josefski Rd DA/895/2013 1 into 2 – Extension of Currency 05‐Mar‐18 AGNES WATER QLD 4677 2546, 2590, 2694 Round Hill Rd & Lot 21 DA/32/2017 Nature Based Tourism ‐ Negotiated 06‐Mar‐18 Round Hill Rd ROUND HILL QLD 4677 2 into 30 ‐ Stage 8A & MCU ‐ Rural to Rural 204 & 230 Jim Whyte Way DA/473/2011 06‐Mar‐18 Residential ‐ Extension of Currency BURUA QLD 4680 General Industry Concrete Product Making DA/511/2001 2 Anson Cl TOOLOOA QLD 4680 20‐Mar‐18 ‐ Change Application Minor Amalgamation 5 into 2 ‐ Change 1402 Gladstone‐Monto Rd DA/15/2017 27‐Mar‐18 Application Minor WOODERSON QLD 4680 87 Anderson Way DA/1002/2014 1 into 2 ‐ Change Application Minor 28‐Mar‐18 AGNES WATER QLD 4677 2152, 2293 Gladstone‐Monto Rd & Lot Amalgamation 6 into 5 ‐ Change DA/140/2015 13 SP 145430, Unnamed Rd BOYNEDALE 29‐Mar‐18 Application Minor QLD 4680 2 COUNCIL DECISIONS – MARCH 2018 Application Decision Development Location No. Date Preliminary Approval s242 ‐ MCU ‐ Change of Density 105 Stowe Rd from Rural to Rural Residential & Development Permit DA/22/2017 CALLIOPE QLD 4680 06‐Mar‐18 ROL ‐ 1 into 61 Lots Under superseded Calliope Shire Planning Scheme 2007 PLANNING DECISIONS 14 3 Yr Avg (2015 ‐ 2017) 2018 12 10 8 6 4 2 0 July May June April March August October January February December November September PLANNING ‐ % WITHIN TIMEFRAME & AVERAGE NO. OF DAYS FOR DECISION 120 Averge Days % Within Timeframe 100 80 60 40 20 13.8 10.5 11.9 0 July May June April March August January October February December November September 3 BUILDING & PLUMBING TOTAL BUILDING & PLUMBING DECISIONS 120 100 80 60 40 3 Yr Avg (2015 ‐ 2017) 2018 20 0 July May June April March August October January February December November September BUILDING DECISIONS ‐ % WITHIN TIMEFRAME & AVERAGE NO. OF DAYS FOR DECISION 120 Averge Days % Within Timeframe 100 80 60 40 20 1.94 1.24 0.125 0 July May June April March August January October February December November September PLUMBING DECISIONS ‐ % WITHIN TIMEFRAME & AVERAGE NO. OF DAYS FOR DECISION 120 Averge Days % Within Timeframe 100 80 60 40 20 0.11 0.06 0.33 0 July May June April March August January October February December November September 4 BUILDING & PLUMBING DECISIONS BY APPLICATION TYPE MARCH 2018 Plumbing ‐ Other Dwelling Additions 3.00 Building ‐ 3.00 Dwelling 4% 4% Other Plumbing ‐ 8.00 3.00 Sewered 11% 4% 6.00 8% Commercial / Industrial 2.00 Pool/Spa 3% 4.00 5% 10A Structures 46.00 61% BUILDING & PLUMBING DECISIONS BY SUBURB MARCH 2018 West Gladstone 1.00 1% Agnes Water ‐ South Gladstone Telina, Toolooa, Glen Seventeen Seventy 3.00 Eden 14.00 4% 10.00 13% 19% Rural West 2.00 3% Boyne Island ‐ Benaraby 6.00 Rural South East 8% 6.00 8% New Auckland, Kirkwood 7.00 Calliope 10% 13.00 Kin Kora, 17% Sun Valley 4.00 5% Gladstone City Clinton 1.00 8.00 1% 11% 5 BUILDING SEARCHES CONDUCTED 60 50 40 30 3 Yr Avg (2015 ‐ 2017) 2018 20 10 0 July May June April March August October January February December November September BOUNDARY RELAXATION AND AMENITY & AESTHETICS DECISIONS 18 16 14 12 10 8 6 3 Yr Avg (2015 ‐ 2017) 2018 4 2 0 July May June April March August October January February December November September 6 POOL SAFETY INSPECTIONS 12 3 Yr Avg (2015 ‐ 2017) 2018 10 8 6 4 2 0 July May June April March August October January February December November September BUILDING & PLUMBING INSPECTIONS 300 3 Yr Avg (2015 ‐ 2017) 2018 250 200 150 100 50 0 July May June April March August October January February December November September 7 CUSTOMER SERVICE REQUESTS CSRs LODGED MARCH 2018 Planning Compliance Compliance Search 2.00 Follow‐up 8% 3.00 11% Planning Compliance Building & Plumbing Compliance Compliance Search Follow‐up Building & Plumbing Compliance 21.00 81% CSRs COMPLETED MARCH 2018 Planning Compliance 5.00 19% Planning Compliance Building & Plumbing Compliance Compliance Search Follow‐up Building & Plumbing Compliance 21.00 81% 8 OPERATIONAL WORKS SECTION NEW APPLICATIONS LODGED – MARCH 2018 Application Development Location Value of Works Lodged Date No. Roadwork, Stormwater Lot 896 SP 261771, Harvey OPW/103/2018 $273,159.15 20‐Mar‐2018 and Earthworks Road CLINTON QLD 4680 DECIDED APPLICATIONS – March 2018 Application Development Location Decision Date No. 78 Racecourse Rd & 2303 Dawson OPW/97/2017 Water Infrastructure 19‐Mar‐2018 Highway, Calliope Qld 4680 PTW‐ Restoration, Remediate eroding OPW/93/2017 6 Jefferis Road, Beecher Qld 4680 12‐Mar‐2018 streambanks and increase fish habitat NUMBER OF OPERATIONAL WORKS DECISIONS MADE ‐ 2018 10 Average (2010‐2017 Inc.) 9 2017 8 2018 7 6 5 4 3 2 1 0 July May June April March August January October February December November September 9 MISCELLANEOUS RATES SEARCHES 140 120 100 80 60 3 Yr Avg (2015‐2017) 2018 40 20 0 July May June April March August October January February December November September 10 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    10 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us