Current Operationally Complete Projects

Current Operationally Complete Projects

Operationally Complete Projects Connecting Washington, Nickel, and TPA Projects Operationally Complete in 2021 and 2020 This detailed report describes Connecting Washington, Nickel, and TPA projects that have been completed in the prior month. This monthly count of operationally complete projects may differ from quarterly Gray Notebook reporting because some projects are included here at the time they are completed, even though they may be part of a larger project that is yet to be completed. Project Title Revenue Package On time* Operationally Complete Date SR 167/I-5 to SR 509 - Stage 1A 2015 Connecting late 8/12/2021 (Pierce) 316708T Washington I-5/Steilacoom-DuPont Rd to Thorne Ln - 2015 Connecting late 8/1/2021 Corridor Improvements (Pierce) Washington 300503T I-5/SR 510 Interchange - Reconstruct 2015 Connecting late 7/17/2021 Interchange (Thurston) 300502C Washington I-90/Bullfrog Rd Vic to Cle Elum Vic - Nickle late 6/28/2021 Replace/Rehab Concrete (Kittitas) 509027T I-90/Medical Lake I/C to Geiger Field 2015 Connecting late 6/18/2021 I/C - Reconstruction (Spokane) Washington 609047C SR 99/Alaskan Way Viaduct Demolition Nickle and TPA late 6/13/2021 & Battery St Tunnel Decommissioning (King) 809939X SR 107/Chehalis River Bridge - 2015 Connecting late 5/24/2021 Structural Rehabilitation (Grays Harbor) Washington 310702B No Nickel, TPA, or Connecting Washington projects operationally complete in April 2021. No Nickel, TPA, or Connecting Washington projects operationally complete in March 2021. No Nickel, TPA, or Connecting Washington projects operationally complete in February 2021. SR 240/Duportail Rd Intersection 2015 Connecting 12/16/2020 Improvements (Benton) 524003W Washington No Nickel, TPA, or Connecting Washington projects operationally complete in November 2020. No Nickel, TPA, or Connecting Washington projects operationally complete in October 2020. US 395/NSC Columbia to Freya 2015 Connecting late 9/29/2020 (Spokane) 600015B Washington I-90/Barker to Harvard - Improve 2015 Connecting 9/18/2020 Interchanges and Local Roads Washington (Spokane) 609049L US 395/Safety Corridor Improvements 2015 Connecting Late 9/4/2020 (Adams, Franklin) 539504P Washington US 2/Corridor Improvements 2015 Connecting Late 8/28/2020 (Snohmish) 100210K Washington I-82/South Union Gap Interchange - 2015 Connecting Late 8/21/2020 Construct Ramps (Yakima) 508209U Washington I-90/Stampede Pass I/C EB - Replace 2015 Connecting 8/20/2020 Concrete Panels (Kittitas) 509094P Washington *A project is 'on time' if it achieves the milestone Updated within the quarter planned in the last approved as of budget. August 31, 2021 Page 1.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us