The World Bank Report No: ISR13859 Implementation Status & Results India Tamil Nadu Irrigated Agriculture Modernization and Water-Bodies Restoration and Management Project (P090768) Operation Name: Tamil Nadu Irrigated Agriculture Modernization and Water- Project Stage: Implementation Seq.No: 14 Status: ARCHIVED Archive Date: 21-Apr-2014 Bodies Restoration and Management Project (P090768) Public Disclosure Authorized Country: India Approval FY: 2007 Product Line:IBRD/IDA Region: SOUTH ASIA Lending Instrument: Specific Investment Loan Implementing Agency(ies): Key Dates Public Disclosure Copy Board Approval Date 23-Jan-2007 Original Closing Date 31-Mar-2013 Planned Mid Term Review Date 25-Sep-2009 Last Archived ISR Date 14-Dec-2013 Effectiveness Date 09-Apr-2007 Revised Closing Date 30-Sep-2014 Actual Mid Term Review Date 05-Mar-2010 Project Development Objectives Project Development Objective (from Project Appraisal Document) The proposed project development objective is for selected sub-basin stakeholders to increase irrigated agriculture productivity in a sustainable water resources management framework. Has the Project Development Objective been changed since Board Approval of the Project? Public Disclosure Authorized Yes No Component(s) Component Name Component Cost Irrigation systems modernization in a sub basin framework 282.83 Agricultural Intensification and Diversification 166.23 Institutional Modernization for Irrigated Agriculture 52.69 Project Management Support 8.32 WATER RESOURCES MANAGEMENT 5.00 Overall Ratings Previous Rating Current Rating Public Disclosure Authorized Progress towards achievement of PDO Satisfactory Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Moderately Satisfactory Overall Risk Rating Public Disclosure Copy Implementation Status Overview The Project is now well into its last phase of implementation (Phase IV). Civil works in all 4 phases of sub-basins originally included in the Project now stand at 97% complete. Page 1 of 8 Public Disclosure Authorized The World Bank Report No: ISR13859 Supporting work of the participating line departments with farmers in these sub-basins is moving in accordance with the agreed DPRs and will be completed by the Closing Date of September 30, 2014. Two sets of additional civil works not included in the original project design have been approved and are in the process of implementation, utilizing the agreed 18 month extension of Closing Date and the available project savings. Delays have occurred in tendering and awarding some of these remaining contracts. The earlier agreed target was to have all contracts awarded by January 1, 2014. Following the mission, the Bid Evaluation Reports for all remaining packages have been reviewed by the Bank and no objections provided. The Task Team is working with the MDPU to ensure that no further delays in contract implementation are encountered. Achievement of the Project Development Objective remains on track, though Tamil Nadu is currently suffering its second consecutive drought year. Yield increases for paddy and pulse crops are in line with targets set out in the PAD. Production increases for milk are running ahead of projected targets. The target for increase in area under micro-irrigation of 40,000 ha. is on track to be met. Available evidence also shows that the targeted increase in area under high-value crops is being met. Lastly, discussions with farmers confirm information provided in the interim M&E Report that they are receiving substantial increases in incomes as a result of adopting the promoted technologies and that the levels of adoption and sustainability are high. Scaling up of the fisheries interventions is behind schedule and is being hindered by the drought conditions. With respect to Component C, implementation of the set of measures agreed to in February 2013 to strengthen Participatory Irrigation Management (PIM) in the Project has been Public Disclosure Copy incomplete. The agreed approach incorporates change management and broader sociological elements into the traditional PIM capacity building training. During the mission and afterwards, steps were taken to address delays in conducting the training and in payment to staff that have been hired. The goal of this intervention is to facilitate better water management practices at the village level and needs to be given greater priority in the remaining months of Project implementation. Continued delays in hiring a Consultant to conduct the independent external audit of the implementation of the environmental and social safeguards plan has resulted in a downgrading of the overall safeguards rating to unsatisfactory. Locations Country First Administrative Division Location Planned Actual India State of Tamil Nadu Vembar India Not Entered Vellar River India Not Entered Vellar River India Not Entered Varaha Nadi India Not Entered Vaniyar River India Not Entered Vaippar River India Not Entered Vaigai River India State of Tamil Nadu Uttarakosamangai India Not Entered Uppanar River India State of Tamil Nadu Tirunelveli India State of Tamil Nadu Thanjavur Public Disclosure Copy India State of Tamil Nadu State of Tamil Nadu India Not Entered Tambraparni River Page 2 of 8 The World Bank Report No: ISR13859 Country First Administrative Division Location Planned Actual India Not Entered Sweta Nadi India State of Tamil Nadu Salem India State of Tamil Nadu Ramanathapuram India State of Tamil Nadu Pudukkottai India Not Entered Ponnaiyar River India Not Entered Poini River Public Disclosure Copy India Not Entered Pambar River India Not Entered Palavar River India Not Entered Palar River India State of Tamil Nadu Ongur India State of Tamil Nadu Marandahalli India Not Entered Manimuttar India State of Tamil Nadu Madurai India State of Tamil Nadu Chennai India State of Tamil Nadu Krishnagiri India Not Entered Kottakkarai Ar India Not Entered Korampallam Tank India Not Entered Kodayar River India State of Tamil Nadu Kanniyakumari India Not Entered Gundar River India Not Entered Gomukha Nadi India Not Entered Gadilam River India State of Tamil Nadu Dharmapuri Public Disclosure Copy India State of Tamil Nadu Coimbatore India Not Entered Chittar River Page 3 of 8 The World Bank Report No: ISR13859 India Not Entered Arjuna Nadi India Not Entered Arani Nadi India Not Entered Aliyar River India State of Tamil Nadu Adyar River India State of Tamil Nadu Cooum River India State of Tamil Nadu Kosisttalaiyar River India State of Tamil Nadu Thoothukudi Public Disclosure Copy India State of Tamil Nadu Perambalur India State of Tamil Nadu Thiruvallur India State of Tamil Nadu Chennai India State of Tamil Nadu Vellore India State of Tamil Nadu Tiruvannamalai India State of Tamil Nadu Kancheepuram India State of Tamil Nadu Villupuram India State of Tamil Nadu Cuddalore India State of Tamil Nadu Sivaganga India State of Tamil Nadu Theni India State of Tamil Nadu Virudhunagar India State of Tamil Nadu Kambainallur Results Project Development Objective Indicators Public Disclosure Copy Page 4 of 8 The World Bank Report No: ISR13859 Indicator Name Core Unit of Measure Baseline Current End Target increase in value of crop produciton per unit of Text Value 0% 100% irrigation water supply (%) Date 09-Apr-2007 30-Sep-2013 30-Sep-2014 Comments Agreement was reached to revise this indicator based on available data. Increase in area under micro irrigation Text Value 0 37,400 40,000 ha (hectares) Date 09-Apr-2007 01-Jan-2014 30-Sep-2014 Comments It was agreed during the MTR that the final traget for MIS Public Disclosure Copy would be reduced to 40,000 ha Increase in targeted farmers' incomes Text Value 0 35 50 compared to other (WOP) farmers (%) Date 09-Apr-2007 30-Sep-2013 30-Sep-2014 Comments No new data since previous ISR. Enhanced sustainable water resources Text Value State Water Framework and SWaRMA fully operational; At planning capacity Environmental Plans least 3 Sub-basin and 1 Basin prepared for most TN Basins; Board formed 2 existing Basin Boards Date 09-Apr-2007 30-Sep-2013 30-Sep-2014 Comments SWaRMA Workplan through Sept. 2014 submitted and agreed. Intermediate Results Indicators Indicator Name Core Unit of Measure Baseline Current End Target Irrigation Systems Modernization in a sub- Text Value 0 100 basin framework: Date 09-Apr-2007 27-Jan-2014 30-Sep-2014 % of schemes completed within planned time & cost Comments Completed within cost parameters, but with some delay due to overall project implementation delays. Irrigation Systems Modernization in a sub- Text Value 0 tanks (0 ha) 4,798 tanks completed 5,700 tanks (400,000 ha) basin framework: Date 09-Apr-2007 01-Jan-2014 30-Sep-2014 Additional tank systems modernized (no and ha) Comments Public Disclosure Copy Page 5 of 8 The World Bank Report No: ISR13859 Irrigation Systems Modernization in a sub- Text Value 0 40 basin framework: Date 09-Apr-2007 30-Sep-2013 30-Sep-2014 Increase in area fully irrigated (%) Comments No new data since the previous ISR. Irrigation Systems Modernization in a sub- Text Value 9 drafted 61 finalized and implemented basin framework: Date 09-Apr-2007 01-Jan-2014 30-Sep-2014 Integration of the work of different line agencies for selected sub-basins (number of integrated Comments All sub-basin development With the recent request from sub-basin development plans) plans are finalized and in GoTN to add the implementation. Amaravathay sub-basn, the total number of sub-basins has increased from 60 to 61. Public Disclosure Copy Agricultural Intensification and Diversification:
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages8 Page
-
File Size-