Haryana Orbital Rail Corridor Connecting Palwal to Sonipat by Linking Asaoti-Patli-Asaudah-Rathdhana Stations Feasibility Study Report

Haryana Orbital Rail Corridor Connecting Palwal to Sonipat by Linking Asaoti-Patli-Asaudah-Rathdhana Stations Feasibility Study Report

HARYANA ORBITAL RAIL CORRIDOR CONNECTING PALWAL TO SONIPAT BY LINKING ASAOTI-PATLI-ASAUDAH-RATHDHANA STATIONS FEASIBILITY STUDY REPORT I HARYANA ORBITAL RAIL CORRIDOR CONNECTING PALWAL TO SONIPAT BY LINKING ASAOTI-PATLI-ASAUDAH-RATHDHANA STATIONS FEASIBILITY STUDY REPORT Table of Contents 1 EXECUTIVE SUMMARY ................................................................................................... 1 1.1 Introduction ............................................................................................................ 1 1.2 Traffic Demand Forecast ......................................................................................... 1 1.3 Civil Engineering ...................................................................................................... 2 1.4 Salient Features ...................................................................................................... 2 1.5 Power Supply and System of Traction ..................................................................... 3 1.6 Signalling and Telecommunication .......................................................................... 4 1.7 Cost Estimate .......................................................................................................... 4 1.8 Proposed Financial Structuring ................................................................................ 4 1.9 CONCLUSION & RECOMMENDATIONS .................................................................... 5 2 OBJECTIVE AND DESIGN METHODOLOGY ...................................................................... 6 2.1 Project Objective – Haryana Orbital Rail Corridor .................................................... 6 2.1.1 Major Development near project location ....................................................... 6 2.1.2 Conceptualisation of the Alignment. ................................................................ 7 2.2 Project Location ...................................................................................................... 8 2.2.1 Key Map of Project location ............................................................................. 8 2.2.2 Serving Station: ................................................................................................ 9 2.2.3 Major Locations & Districts .............................................................................. 9 2.3 Concept of Study ................................................................................................... 10 2.3.1 Feasibility Study ............................................................................................. 10 2.4 Stakeholder outreach on Haryana Orbital Rail Corridor Project ............................. 10 2.5 Fixed Points ........................................................................................................... 12 2.5.1 Asaoti to Harsana Kalan ................................................................................. 12 2.5.2 Y-Connectivity towards Rewari Station........................................................... 12 2.5.3 Y-Connectivity towards Garhi-Harsaru Jn Station ........................................... 12 2.5.4 Y-Connectivity towards Rohtak Station .......................................................... 12 2.6 Standard of Construction ...................................................................................... 12 2.6.1 Category of Line ............................................................................................. 12 2.6.2 Gradient ......................................................................................................... 13 2.6.3 Grade Compensation ..................................................................................... 13 2.6.4 Gauge ............................................................................................................ 13 2.6.5 Rails ............................................................................................................... 13 2.6.6 Ballast ............................................................................................................ 13 I HARYANA ORBITAL RAIL CORRIDOR CONNECTING PALWAL TO SONIPAT BY LINKING ASAOTI-PATLI-ASAUDAH-RATHDHANA STATIONS FEASIBILITY STUDY REPORT 2.6.7 Sleeper ........................................................................................................... 13 2.6.8 Track Structure .............................................................................................. 13 2.6.9 Welding ......................................................................................................... 13 2.6.10 Points & Crossings .......................................................................................... 13 2.6.11 Switches & SEJ ............................................................................................... 14 2.6.12 Track Tolerances ............................................................................................ 14 2.6.13 Catch Water Drains and Longitudinal side Drains ........................................... 14 2.6.14 Speed potential .............................................................................................. 14 2.6.15 Length of Infrastructure ................................................................................. 14 2.6.16 Traction ......................................................................................................... 14 2.6.17 Horizontal and Vertical Alignment .................................................................. 14 2.6.18 Formation ...................................................................................................... 15 2.6.19 Bridges ........................................................................................................... 15 2.6.20 Fixed Structure Clearance .............................................................................. 15 2.6.21 Road Crossing ................................................................................................ 15 2.6.22 Protective Works ........................................................................................... 15 2.6.23 Fixed Structure Clearances ............................................................................. 16 2.6.24 Land requirement .......................................................................................... 16 2.7 Miscellaneous works ............................................................................................. 16 3 Cost Estimation ........................................................................................................... 17 3.1 Abstract Estimates ................................................................................................ 17 3.2 Methodology ........................................................................................................ 17 4 Financial & Implementation Aspects of the Proposal ................................................... 18 4.1 Estimation of Traffic Revenues .............................................................................. 18 4.2 Passenger Earnings ............................................................................................... 18 4.3 Freight Earnings .................................................................................................... 18 4.4 O&M Costs ............................................................................................................ 19 4.5 Financial Appraisal ................................................................................................ 19 4.5.1 Net Present Value Method (NPV) ................................................................... 20 4.5.2 Internal Rate of Return (IRR) .......................................................................... 20 4.5.3 Discount Rate ................................................................................................. 21 4.5.4 Capital Asset Pricing Model (CAPM) ............................................................... 21 4.6 Haryana Orbital Rail Corridor Proposal –Project Executed by JV ............................ 22 4.7 Economic Appraisal ............................................................................................... 23 4.8 Assessment of Economic Cost ............................................................................... 24 II HARYANA ORBITAL RAIL CORRIDOR CONNECTING PALWAL TO SONIPAT BY LINKING ASAOTI-PATLI-ASAUDAH-RATHDHANA STATIONS FEASIBILITY STUDY REPORT 4.9 Assessment of Economic Benefit ........................................................................... 24 4.10 Implementation through SPV as per JV Model ................................................... 25 5 Proposed Financial Structuring .................................................................................... 29 III HARYANA ORBITAL RAIL CORRIDOR CONNECTING PALWAL TO SONIPAT BY LINKING ASAOTI-PATLI-ASAUDAH-RATHDHANA STATIONS FEASIBILITY STUDY REPORT List of Tables Table 13 : Revenue Projections till Horizon Year 2049 ........................................................ 19 IV HARYANA ORBITAL RAIL CORRIDOR CONNECTING PALWAL TO SONIPAT BY LINKING ASAOTI-PATLI-ASAUDAH-RATHDHANA STATIONS FEASIBILITY STUDY REPORT List of Figures Figure 2.3 Proposed Alignment crosses DFCC ........................................................................ 7 Figure 2.4 Key Plan of Proposed Rail Corridor ........................................................................ 9 V HARYANA ORBITAL RAIL CORRIDOR

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    35 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us