Features of River Basin (Meycauayan)

Features of River Basin (Meycauayan)

Table: Objective River Improvement Length Length River (km) Meycauayan 9.5 Marilao 4.5 THE STUDY ON THE NATIONWIDE FLOOD RISK Fig. 5-5 ASSESSMENT AND THE FLOOD MITIGATION PLAN FOR THE SELECTED AREAS IN THE REPUBLIC OF THE PHILIPPINES Features of River Basin (Meycauayan) JAPAN INTERNATIONAL COOPERATION AGENCY F - 9 N. Luzon HW McArther HW Bulacan R. Marilao R. Main cause of Meycauayan R. flood:overflow Manila Target Area Bay VOM area Meycauayan R. Main cause of flood: inland flood Case-1 N. Luzon HW McArther HW Bulacan R. Marilao R. Main cause of Meycauayan R. flood:overflow Manila Target Area Bay VOM area Meycauayan R. Main cause of flood: inland flood Case-2 THE STUDY ON THE NATIONWIDE FLOOD RISK Fig. 5-6 ASSESSMENT AND THE FLOOD MITIGATION PLAN FOR THE SELECTED AREAS Alternatives for Target Area to be IN THE REPUBLIC OF THE PHILIPPINES Protected JAPAN INTERNATIONAL COOPERATION AGENCY F - 10 CR3_Marilao 3.5km(3.0~4.5km) 6 EL+4.8m 4 EL+3.8m CR2_Marilao 2 1.0km(0.5~1.5km) 4 EL+2.9m 0 EL+1.9m -50 50 150 250 2 -2 EL-2.6m Elevation (m) Elevation 0 -4 200 300 400 500 40.0m -2 -6 Station (m) -4 EL-4.7m Elevation (m) Elevation -6 50.0m -8 CR1_Meycauayan Station (m) 5.1km(3.0~5.5km) 4 2 EL+2.0m EL+1.0m CR1_Marilao 0 0.5km(0~0.5km) 500 600 700 800 900 1000 1100 4 68.2m CR5_MeycauananCR5_Meycauayan EL+2.6m -2 12.8km(12.513.3km(13.0~13.0km)14.5km) Elevation (m) Elevation 2 EL+1.6m 5 EL+4.2mEL+4.2m -4 EL+3.4mEL+3.4m 0 3 -6 0 100 200 300 Station (m) -2 1 Elevation (m) Elevation -4 -1 300 400 400 500 500 600 600 EL-5.1m Elevation (m) Elevation (m) EL-3.0m -6 -3 EL-3.0m 37.4m 30.0m30.0m -8 -5 Station (m) Station (m)(m) CR2_Meycauayan CR3_Meycauayan 8.8km(8.0~9.5km) 4 9.9km(9.5~11.5km) 4 EL+2.2m EL+2.7m 88.6m CR4_MeycauayanCR4_Meycauayan 2 EL+1.2m 2 EL+1.7m 12.8km(12.512.0km(11.5~~13.0km)12.5km) 55 49.5m49.5m 0 EL+3.9EL+3.9 0 EL+3.1 500 600 700 800 900 33 EL+3.1 200 300 400 500 -2 -2 Elevation (m) Elevation 11 Elevation (m) Elevation EL-3.6m -4 -4 63.4m -1-1100100 200 200 300 300 400 400 Elevation (m) Elevation -6 (m) Elevation Station (m) -6 EL-3.1m Station (m) -3-3 EL-3.1m 21.5m21.5m -5-5 StationStation (m)(m) Optimum Plan THE STUDY ON THE NATIONWIDE FLOOD RISK Fig. 5-7 ASSESSMENT AND THE FLOOD MITIGATION PLAN FOR THE SELECTED AREAS IN THE REPUBLIC OF THE PHILIPPINES Optimum Plan (Meycauayan) JAPAN INTERNATIONAL COOPERATION AGENCY F - 11 Estimated Flood Potential Area of the Kinanliman River Basin Table: Objective River Improvement Length Length River Remarks (km) Left bank: 1.1km Kinanliman 1.1 Right bank: 0.6km THE STUDY ON THE NATIONWIDE FLOOD RISK Fig. 5-8 ASSESSMENT AND THE FLOOD MITIGATION PLAN FOR THE SELECTED AREAS IN THE REPUBLIC OF THE PHILIPPINES Features of River Basin (Kinanliman) JAPAN INTERNATIONAL COOPERATION AGENCY F - 12 CR2 -20m (-150~0m) 8 CR1 -179m (-385~-150m) 54.2m6 6 EL+5.2m 55.6m CR4 EL+4.4m EL+4.7m 302m (150~350m) 4 4 EL+3.9m 12 160.0m Elevation (m) EL+10.0m 2 EL+1.7m 2 10 EL+0.8m EL+9.2m 30.0m 0 Elevation (m) 0 30.0m 8 -60 -40 -20 0 20 40 430 450 470 490 510 530 550 Station (m) EL+6.1m -2 Elevation (m) 6 Station (m) 30.0m 4 360 380 400 420 440 460 480 500 Station (m) CR3 103m (0~150m) CR5 10 582m (350~660m) 125.0m 19 EL+8.5m 8 EL+7.7m 17 6 EL+15.1m 72.5m 15 EL+14.3m Elevation (m)Elevation 4 EL+3.0m 13 Elavation (m) Elavation 2 30.0m EL+10.7m11 -50 -30 -10 10 30 50 70 90 Station (m) 30.0m 9 -50 -30 -10 10 30 50 70 90 Station (m) THE STUDY ON THE NATIONWIDE FLOOD RISK Fig. 5-9 ASSESSMENT AND THE FLOOD MITIGATION PLAN FOR THE SELECTED AREAS IN THE REPUBLIC OF THE PHILIPPINES Optimum Plan (Kinanliman) JAPAN INTERNATIONAL COOPERATION AGENCY F - 13 Table: Objective River Improvement Length Length River (km) Tuganay 21.0 Anibongan 10.0 New Ising 9.0 Old Ising 3.0 THE STUDY ON THE NATIONWIDE FLOOD RISK Fig. 5-10 ASSESSMENT AND THE FLOOD MITIGATION PLAN FOR THE SELECTED AREAS IN THE REPUBLIC OF THE PHILIPPINES Features of River Basin (Tuganay) JAPAN INTERNATIONAL COOPERATION AGENCY F - 14 CR3_Anibongan 9.8km(6.5~10.0km) 10 58.4m 8 EL+7.6m EL+7.0m 6 4 Elevation (m) 2 EL+1.2m 0 CR5_Tuganay 150 20020.0m 250 300 350 18.8km(17.0~21.0km) -2 15 Station (m) 56.0m EL+13.0m 13 EL+12.2m CR2_Anibongan 6.1km(4.5~6.5km) 11 10 65.0m 9 8 EL+7.2m Elevation (m) EL+6.6m 7 EL+7.0m 6 20.0m 5 4 50 100 150 200 Station (m) 2 Elevation (m) 0 EL-0.3m 300 350 400 450 500 -2 CR4_Tuganay 20.0m -4 16.2km(15.0~17.0km) Station (m) 12 57.2m EL+9.9m 10 EL+9.1m CR1_Anibongan 4.3km(0~4.5km) 8 10 66.2m 8 EL+7.0m 6 EL+6.4m Elevation (m) Elevation 6 EL+3.7m 4 4 2 2 20.0m Elevation (m) 100 150 200 250 0 EL-0.7m Station (m) 200 250 300 350 400 -2 20.0m -4 CR3_Tuganay Station (m) 14.6km(9.0~15.0km) 10 59.0m EL+8.4m 8 EL+7.6m 6 4 Elevation (m) Elevation 2 EL+1.9m 0 20.0m 150 200 250 300 350 Station (m) CR2_Tuganay 8.8km(6.5~9.0km) 10 8 54.0m EL+6.6m 6 EL+5.8m 4 2 Elevation Elevation (m) 0 150 200 250 300EL-1.9m 350 400 450 500 -2 -4 20.0m Station (m) CR_Old Ising 3.0km(0~3.0km) CR3_Ising 6 (6.0~9.0km) 22.6m 8 4 EL+4.1m EL+3.5m 6 48.8m 2 EL+4.2m 4 EL+3.6m Elevation (m) 0 EL-0.3m 2 50 100 150 -2 5.0m Station (m) Elevation (m) Elevation 0 EL-0.5m 3,400 3,450 3,500 3,550 -2 30.0m -4 CR1_Tuganay Station (m) 10 6.4km(0~6.5km) 8 54.8m 6 EL+5.1m 4 2 Elevation (m) Elevation 0 200 250 300 350 400 450 500 550 600 -2 EL-2.8m -4 20.0m -6 Station (m) CR2_Ising 6.0km(2.0~6.0km) 6 100.0m EL+4.0m 4 EL+3.4m 2 0 35.0m EL-1.0m Elevation (m) 0 50 100 150 -2 10.0m -4 Station (m) CR1_Ising (0~2.0km) 4 99.0m EL+2.0m 2 EL+1.4m 0 20m -50 0 50 100 150 -2 Elevation (m) Elevation Optimum Plan -4 EL-4.0m -6 35.0m Station (m) THE STUDY ON THE NATIONWIDE FLOOD RISK Fig. 5-11 ASSESSMENT AND THE FLOOD MITIGATION PLAN FOR THE SELECTED AREAS IN THE REPUBLIC OF THE PHILIPPINES Optimum Plan (Tuganay) JAPAN INTERNATIONAL COOPERATION AGENCY F - 15 Estimated Flood Potential Area of the Dinanggasan River Basin Table: Objective River Improvement Length Length River (km) Dinanggasan 1.6 THE STUDY ON THE NATIONWIDE FLOOD RISK Fig. 5-12 ASSESSMENT AND THE FLOOD MITIGATION PLAN FOR THE SELECTED AREAS IN THE REPUBLIC OF THE PHILIPPINES Features of River Basin (Dinanggasan) JAPAN INTERNATIONAL COOPERATION AGENCY F - 16 r e iv Tag-IboR River ib g /s /s 3 3 a T Bridge 270m 270m 26m3/s /s Compol River /s 3 3 Catarman River River Dinanggasan Dinanggasan 296m 296m Existing Dike Dike r ve Bridge River Mouth i Compol R Case-1 Tag-Ibo River ib g /s /s 3 3 a T Bridge 270m 270m 26m3/s /s Compol River /s 3 3 Catarman River River Dinanggasan Dinanggasan 270m 270m Fig. 5-13 Existing Dike Dike Channeling Bridge River Mouth Compol Case-2 Alternative Cases (Dinanggasan) F - 17 PLAN FOR THE SELECTED AREAS THE ASSESSMENTSTUDY ON THE AND NATIONWIDE THE FLOOD FLOOD MITIGATION RISK IN THE REPUBLIC OF THE PHILIPPINES JAPAN INTERNATIONAL COOPERATION AGENCY CR4 1170m (880~1400m) CR3 46 880m (530~880m) 36 44 34 42 78.0m 32 40 EL+39.2m EL+38.4m 30 107.6m 38 EL+37.2m 28 EL+27.6m Elevation (m) EL+26.8m 36 Elevation (m) Elevation 70.0m 26 EL+25.7m 34 24 32 100.0m 22 0 100 200 300 400 Station (m) 50 150 250 350 450 Station (m) CR2 530m (120~530m) 22 20 18 16 107.0m 14 EL+13.6m EL+12.8m Elevation(m) 12 EL+11.9m 10 100.0m 8 200 300 400 500 600 Station (m) CR1 120m (0~120m) 12 10 8 197.8m 6 EL+5.1m EL+4.3m 4 EL+3.1m Elevation (m) 2 190.0m 0 100 200 300 400 500 -2 Station (m) THE STUDY ON THE NATIONWIDE FLOOD RISK Fig.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    10 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us