Extract from Hansard [ASSEMBLY — Tuesday, 12 June 2018] P3235b-3236A Mr Terry Redman; Mr Ben Wyatt [1] RENEWABLE ENERGY-RELATE

Extract from Hansard [ASSEMBLY — Tuesday, 12 June 2018] P3235b-3236A Mr Terry Redman; Mr Ben Wyatt [1] RENEWABLE ENERGY-RELATE

Extract from Hansard [ASSEMBLY — Tuesday, 12 June 2018] p3235b-3236a Mr Terry Redman; Mr Ben Wyatt RENEWABLE ENERGY-RELATED SERVICES AND INFRASTRUCTURE 3077. Mr D.T. Redman to the Minister for Energy: I refer to Government contracts for delivery of renewable energy related services and/or infrastructure, and ask: (a) since the McGowan Government won the election, how many Government contracts have been issued for renewable energy related services and/or infrastructure; (b) can the Minister outline the nature of these contracted energy related services and infrastructure; (c) how many Government contracts for renewable energy related services and/or infrastructure has Carnegie Clean Energy won; (d) can the Minister list the renewable energy related contracted services and/or infrastructure since coming to Government and the winning (or preferred) bidder; (e) does the Ministers agencies have a preferred list of suppliers for Government contracted renewable energy related services and/or infrastructure; and (f) If yes to (e) can the Minister provide a copy of the preferred supplier list? Mr B.S. Wyatt replied: Public Utilities Office (a)–(f) None. Not applicable. Western Power (a)–(d) Number Contract Name Nature (and brief description) Contract Issued to: 1 Supply, Delivery and Deliver 2MWh battery and associated EMC (a wholly Installation of a Battery equipment to support the Geraldton to owned subsidiary of Energy Storage System Kalbarri feeder. Also includes ongoing Carnegie Clean (BESS) operation and maintenance services Energy) & Lendlease for 3 years. Services Pty Ltd (e) No. (f) Not applicable. Synergy (a) Five. (b) Please refer to (d). (c) Not applicable. (d) Number Contract Name Nature (and brief description) Contract Issued to 1. Albany Wind Farm Works to maintain the wind turbines at Powertechnics restoration project the Albany Wind Farm. 2. Albany Wind Farm Review of the lifespan of the Albany WSP AUSTRALIA residual life assessment Wind Farm. PTY LTD 3. Warradarge Wind Farm Planning and design of network access Western Power works 4. Greenough River Solar Purchase of First Solar modules for RCR infrastructure Farm Greenough River Solar Farm 5. Warradarge Wind Farm Assessing the yield from the DNV GL Warradarge Wind Farm project (e) No. [1] Extract from Hansard [ASSEMBLY — Tuesday, 12 June 2018] p3235b-3236a Mr Terry Redman; Mr Ben Wyatt (f) Not applicable. Horizon Power (a)–(d) [See tabled paper no 1383.] (e) No. (f) Not applicable. [2] .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us