Pradhan Mantri Gram Sadak Yojana Technology-Wise Details

Pradhan Mantri Gram Sadak Yojana Technology-Wise Details

Pradhan Mantri Gram Sadak Yojana Technology-Wise Details State: All States District: All Districts Block: All Blocks Year: All Years Batch:All Batches Collaboration: All Collaborations Collaboration : Waste Plastics Note : All Costs are in Lakhs and All Lengths are in Kms. Sr. State Name District Block Name Sanctioned Batch Package ID Road Road Name Total Sanctioned Length Sanctioned Length Technology Current Status Name Year Sr.No. Sanctioned Cost under (R & D) Completed Cost Length under (R & D) 1 Jammu And Poonch Mendhar 2016-2017 1 JK11123 1 L036-Dharana To Gohlad Upper 5.000 287.30 5.000 0.000 127.03 In Progress Kashmir Total for Poonch District : 5.000 287.30 5.000 0.000 127.03 Total for Jammu And Kashmir State : 5.000 287.30 5.000 0.000 127.03 Jharkhand Ramgarh Patratu 2016-2017 2 JH23HEC029 2 L059-oriyatu to Bahera tungti 1.700 86.08 1.005 0.000 86.09 In Progress (VR50) Total for Ramgarh District : 1.700 86.08 1.005 0.000 86.09 Ranchi Chanho 2016-2017 2 JH18AEC045 3 L055-NH75 to karmatoli 1.000 48.17 0.800 0.000 4.48 In Progress JH18AEC082 4 L073-T02 TO CHALIO 1.820 95.80 1.470 0.000 8.19 In Progress Total for Ranchi District : 2.820 143.97 2.270 0.000 12.67 Total for Jharkhand State : 4.520 230.05 3.275 0.000 98.76 Kerala Idukki Adimaly 2013-2014 2 KR0334 5 L077 - Kurangatty Nellithanam 4.750 386.38 4.750 0.000 33.20 In Progress Devikulam 2013-2014 2 KR0338 6 Kundala - Sandoz Colony 1.130 99.24 1.130 1.130 8.75 Completed (31/03/2016) Elemdesam 2013-2014 2 KR0341 7 Pallikkamuny - Missionkunnu 2.325 199.43 2.325 2.325 14.90 Completed (31/10/2016) KR0343 8 V C Valavu - Venniyani 3.990 339.25 3.990 0.000 25.95 In Progress Idukki 2013-2014 2 KR0346 9 Cheruthony - Parakadavu 3.060 295.70 3.060 3.060 21.31 Completed (28/04/2016) Kattappana 2013-2014 2 KR0351 10 Vellayamkudy- - Konginipadavu 5.580 457.94 5.580 0.000 39.00 In Progress Nedumkando 2013-2014 2 KR0358 11 Ottahi-Kanthipara-Magathotty - 5.910 497.04 5.910 0.000 40.84 In Progress m Kanakapuzha-N R C itty Thodupuzha 2013-2014 2 KR0363 12 Vadakkummury - Orappara 2.710 238.53 2.710 0.000 18.11 In Progress Total for Idukki District : 29.455 2,513.51 29.455 6.515 202.06 Total for Kerala State : 29.455 2,513.51 29.455 6.515 202.06 Madhya Alirajpur Alirajpur 2005-2006 2 MP1954 13 Alirajpur-Dahod - Band 10.530 221.22 3.000 3.000 18.12 Completed Pradesh (31/03/2008) Bhabra 2012-2013 4 MP4928 14 Chhota Bhawata - Bina 7.550 431.39 2.000 2.000 12.84 Completed (30/04/2015) Jobat 2016-2017 2 MP4932 15 L049-Khattali to Bhiti 2.170 139.30 2.000 0.000 15.64 In Progress Page1of1 Generated On :10/03/2017 01:19 PM 2014 NRRDA, All rights reserved. 1 Madhya Alirajpur Pradesh Sr. State Name District Block Name Sanctioned Batch Package ID Road Road Name Total Sanctioned Length Sanctioned Length Technology Current Status Name Year Sr.No. Sanctioned Cost under (R & D) Completed Cost Length under (R & D) Katthiwara 2006-2007 2 MP1998 16 Andharkach Road - Kheda 1.930 53.29 1.000 1.000 6.41 Completed (31/03/2009) 2012-2013 4 MP4925 17 Sorwa Andharkanch Road - Pipriya 3.800 176.19 1.000 1.000 6.24 Completed (31/01/2015) 18 Wav App. Road - Jetpur 2.600 116.79 2.000 2.000 12.84 Completed (28/02/2015) 2013-2014 1 MP4930 19 L068 - Kathiwada Bhabra Road to 4.750 217.20 1.000 1.000 7.35 Completed Kalmaja (29/02/2016) Udaigarh 2012-2013 4 MP4922 20 Futtalaw bada road - Futtalaw 5.000 250.74 2.000 2.000 12.84 Completed chhota (31/01/2015) MP4924 21 Udagarh Bori Road - Bhurchewdi 5.000 190.77 2.000 2.000 12.84 Completed (10/07/2015) Total for Alirajpur District : 43.330 1,796.89 16.000 14.000 105.12 Ashok Nagar Ashok Nagar 2006-2007 1 MP1321 22 Bhadon-Chhipon road to - Bamora 7.100 193.40 6.880 6.880 29.67 Completed (31/01/2008) 2 MP4725 23 Ashoknagar-Aron road to - Dongra 3.000 71.74 2.931 2.931 15.00 Completed Pachhar (31/10/2008) 24 Ashoknagar-Rasulpur road to - 4.350 129.87 4.315 4.315 23.99 Completed Pathariya(Amkheda) (31/01/2009) 25 Bhadon-Chhipon Road to - 3.000 70.99 3.000 3.000 16.71 Completed Ratikheda (30/11/2008) 26 Guna-Ashoknagar road to - Khejra 2.500 61.78 2.183 2.183 10.88 Completed Atari (31/10/2008) 27 Guna-Ashoknagar road to - Pahada 0.950 22.16 0.830 0.830 4.46 Completed (31/05/2008) 4 MP4751 28 Ashoknagar-Issagarh Road to - Awari 2.350 57.29 1.748 1.748 8.72 Completed (30/04/2009) 29 Ashoknagar-Wajidpur Road to - 2.600 61.17 2.560 2.560 14.40 Completed Bhonra Kachhi (28/02/2008) 30 Ashokngar-Vidisha Road to - 1.950 47.82 1.950 1.950 9.80 Completed Barkheda Lal (28/02/2008) 2012-2013 5 MP4742 31 ASHOKNAGAR ARON ROAD - AKHAI 3.000 113.01 2.790 2.790 12.70 Completed KRISHNA (31/08/2015) 32 ASHOKNAGAR ARON ROAD - 3.700 173.00 3.177 3.177 13.56 Completed KHAIRABHAN (31/08/2015) MP4744 33 ASHOKNAGAR- VIDISHA ROAD - 4.500 194.32 4.100 4.100 16.17 Completed HINOTIYA PACHHAR (30/06/2016) 34 BHADON - BARKHEDI TUMEN 3.800 170.01 2.982 2.982 12.85 Completed (30/06/2016) Page1of1 Generated On :10/03/2017 01:19 PM 2014 NRRDA, All rights reserved. 1 Madhya Pradesh Ashok Nagar Ashok Nagar Sr. State Name District Block Name Sanctioned Batch Package ID Road Road Name Total Sanctioned Length Sanctioned Length Technology Current Status Name Year Sr.No. Sanctioned Cost under (R & D) Completed Cost Length under (R & D) 2013-2014 1 MP-47510 35 L084-T005 to Bamuriya Foot 3.200 143.17 2.650 2.650 13.26 Completed (31/01/2016) 2016-2017 1 MP47100 36 L103-T006 to Kabira 1.700 76.10 1.600 0.000 8.16 In Progress 37 L152-T009 to Anantpur 0.700 35.94 0.500 0.000 2.55 In Progress MP4798 38 L109-T007 to Nageshri 6.150 244.60 5.900 0.000 30.09 In Progress 39 L111-T007 to Devkhedi 1.200 53.00 1.100 0.000 0.00 In Progress MP4799 40 L182-T011 to Barkheda Fatehpur 5.350 245.13 4.250 0.000 21.68 In Progress Chanderi 2006-2007 1 MP1322 41 Chanderi-Pichhore Road to - 1.500 35.37 1.300 1.300 6.81 Completed Panderi (30/04/2008) 42 Issagarh-Chanderi Road to - 4.100 103.23 4.100 4.100 22.51 Completed Bankalpur (31/12/2008) 43 Piprai-Ashoknagar Road to - 5.850 132.59 5.000 5.000 24.93 Completed Baksanpur (31/12/2008) 2 MP4726 44 Amrod-Piprod road to - Khirkatanka 2.600 68.17 2.100 2.100 12.65 Completed (31/03/2009) 45 Chanderi-Pichhore Road to - 2.100 47.37 1.765 1.765 8.80 Completed Nidanpur (31/01/2009) 2011-2012 1 MP-47-503 46 Soter - Ludhaya 9.750 426.02 2.500 2.500 12.46 Completed (31/05/2016) MP-47-504 47 Amrod-Piprod road - Besara 5.525 181.85 1.005 1.005 4.99 Completed (31/10/2015) 2012-2013 2 MP4733 48 Mohanpur - Lidhora 5.350 184.52 3.140 3.140 14.45 In Progress 5 MP4746 49 CHANDERI ISSAGARH ROAD - PANDRI 5.000 203.15 2.315 2.320 9.98 Completed SEHRAI (31/07/2016) MP4747 50 AMROD PIPROD ROAD - MOHRI 5.500 225.84 5.230 5.230 22.55 In Progress 2016-2017 1 MP4794 51 L076-L075 to Chak Chhapara 0.700 35.90 0.400 0.000 2.04 In Progress 52 L077-T006 to Sarsela 3.400 151.12 2.650 0.000 13.52 In Progress 53 L083-T006 to Meetha kheda 3.150 151.29 2.750 0.000 14.03 In Progress Ishagarh 2006-2007 1 MP1323 54 Issagarh-Ashoknagar Road to - 2.500 52.77 2.150 2.150 9.27 Completed Futera Pachhar (31/10/2008) 55 Issagarh-Ashoknagar Road to - 2.200 53.27 1.600 1.600 6.90 Completed Mahana (30/11/2008) 56 Issagarh-Inder Road to - Anghora 4.050 85.76 3.498 3.498 15.06 Completed Dewan (30/11/2008) 4 MP4751 57 Ashoknagar-Issagarh Road to - 1.600 35.37 1.564 1.564 7.80 Completed Dayalpur (31/05/2008) 58 Ashoknagar-Issagarh Road to - 1.400 33.20 1.176 1.176 5.87 Completed Rajtala (31/05/2008) Page1of1 Generated On :10/03/2017 01:19 PM 2014 NRRDA, All rights reserved. 1 Madhya Pradesh Ashok Nagar Ishagarh Sr. State Name District Block Name Sanctioned Batch Package ID Road Road Name Total Sanctioned Length Sanctioned Length Technology Current Status Name Year Sr.No. Sanctioned Cost under (R & D) Completed Cost Length under (R & D) 2012-2013 5 MP4755 59 KADWAYA - SAKARRA 4.400 151.95 3.350 3.350 16.23 Completed (30/06/2015) MP4757 60 NAISARAI VIJAYPURA ROAD - 4.100 169.93 3.817 3.817 23.55 Completed GHATAWADA (30/06/2015) MP4758 61 ISSAGARH ASHOKNAGAR ROAD - 4.250 173.88 3.674 3.674 15.84 Completed BAMURIYA (30/09/2016) 62 MAHANA - KANERA 4.900 214.26 4.226 4.226 18.27 Completed (30/09/2016) MP4759 63 ISSAGARH ASHOKNAGAR ROAD - 3.600 172.87 2.207 2.207 10.90 Completed PARASARI (31/05/2016) MP4760 64 BAINGA - UMRI 4.400 147.11 4.023 4.023 17.35 Completed (30/09/2016) MP4761 65 NAI SARAI - BHENSA 5.500 190.20 1.000 1.000 4.39 Completed (01/02/2015) MP4762 66 KHIRIYA DEWAT - JOLAN 6.000 231.46 5.052 5.052 23.32 Completed (31/01/2016) 2013-2014 1 MP-47512 67 L130-T005 to Hinotiya foot 5.500 216.33 4.630 4.630 29.39 Completed (31/05/2016) 2016-2017 1 MP47101 68 L033-L034 to Depalkhedi 3.950 165.87 3.600 0.000 18.36 In Progress 69 L035-Shadora Naisaray rd.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    97 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us