Download This Document As A

Download This Document As A

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library. For additional information about this document and the document conversion process, please contact WRDS at [email protected] and include the phrase “Digital Documents” in your subject heading. To view other documents please visit the WRDS Library online at: http://library.wrds.uwyo.edu Mailing Address: Water Resources Data System University of Wyoming, Dept 3943 1000 E University Avenue Laramie, WY 82071 Physical Address: Wyoming Hall, Room 249 University of Wyoming Laramie, WY 82071 Phone: (307) 766-6651 Fax: (307) 766-3785 Funding for WRDS and the creation of this electronic document was provided by the Wyoming Water Development Commission (http://wwdc.state.wy.us) This PDF is intended to represent the document delivered to the Wyoming Water Development Office in hard copy; however variations may exist from the printed version. Fontenelle Dam and Outworks Infrastructure CompleƟon Level II Study Prepared by: In associaƟon with: 1600 Specht Point Rd. #209 Fort Collins, CO 80525 Denver, CO Fort Collins, CO Raton, NM Fontenelle Dam and Outworks Infrastructure Completion Level II Study Prepared for: Wyoming Water Development Commission 6920 Y ellowtail Road Cheyenne, WY 82002 Prepared by: ~gineering Analytics, Inc. 1600 Specht Point Road, Suite 209 Fort Collins, Colorado 80525 (970) 488-3111 Fax (970) 488-3112 Project No. 110661 December 2018 Fontenelle Dam and Outworks Level II Study Wyoming Water Development Office TABLE OF CONTENTS INTRODUCTION AND OVERVIEW ........................................................................... 1 Purpose .................................................................................................................... 1 Scope ....................................................................................................................... 1 Project Meetings ..................................................................................................... 3 BACKGROUND ............................................................................................................... 5 OUTLET WORKS AND POWERPLANT .................................................................... 7 River Outlet and Hydroelectric Diversion .............................................................. 7 Spillway .................................................................................................................. 9 East Canal ............................................................................................................... 9 West Canal ............................................................................................................ 10 Site Visit................................................................................................................ 10 ALTERNATIVES ANALYSIS ...................................................................................... 12 Alternatives ........................................................................................................... 12 NEPA CONSIDERATIONS .......................................................................................... 24 NEPA .................................................................................................................... 24 Agency Coordination ............................................................................................ 26 December 2018 2 Engineering Analytics, Inc. Fontenelle Dam and Outworks Level II Study Wyoming Water Development Office Environmental Considerations .............................................................................. 27 Environmental Alternatives Evaluations .............................................................. 32 Permitting, Clearances, and Approvals ................................................................. 32 Summary ............................................................................................................... 34 HYDRAULIC ANALYSIS OF HISTORIC AND FUTURE OPERATIONS .......... 35 Historic Reservoir Operations ............................................................................... 35 Reservoir Potential Yield ...................................................................................... 42 Construction Reservoir Drawdown Scenarios ...................................................... 42 Issues Relative to Interstate Compacts ................................................................. 54 Future Operations.................................................................................................. 55 CONCEPTUAL DESIGNS AND COST ESTIMATES .............................................. 57 Riprap .................................................................................................................... 57 December 2018 iii Engineering Analytics, Inc. Fontenelle Dam and Outworks Level II Study Wyoming Water Development Office Soil Cement ........................................................................................................... 60 Submar Mats ......................................................................................................... 60 Contech Wave Attack Blocks ............................................................................... 60 Summary of Costs ................................................................................................. 60 SCHEDULING ................................................................................................................ 63 Riprap .................................................................................................................... 63 Soil Cement ........................................................................................................... 63 Submar .................................................................................................................. 65 Contech ................................................................................................................. 65 Schedule Variations .............................................................................................. 65 Power Generation Scheduling............................................................................... 69 Summary ............................................................................................................... 70 ECONOMIC ANALYSIS .............................................................................................. 71 Benefits Associated with the Proposed Project .................................................... 71 Valuation Methods ................................................................................................ 72 Direct Water Supply Analysis .............................................................................. 75 Drought Mitigation Analysis ................................................................................ 80 Drought Avoidance Analysis .............................................................................. 105 December 2018 iv Engineering Analytics, Inc. Fontenelle Dam and Outworks Level II Study Wyoming Water Development Office Cost Considerations ............................................................................................ 110 Summary of Benefits .......................................................................................... 113 CONCLUSIONS AND RECOMMENDATIONS ...................................................... 115 Conclusions ......................................................................................................... 115 Recommendations ............................................................................................... 116 Extreme Event Alternative .................................................................................. 118 REFERENCES .............................................................................................................. 119 December 2018 v Engineering Analytics, Inc. Fontenelle Dam and Outworks Level II Study Wyoming Water Development Office LIST OF TABLES Table 1-1. Interagency group meetings with their corresponding topics and dates. ........... 4 Table 4-1. Quantity of riprap for each 20-foot section placed in the dry. ........................ 15 Table 4-2. Quantity of riprap for each 20-foot section for placement in full reservoir. ... 16 Table 4-3. Quantity of soil cement for each 20-foot section. ........................................... 19 Table 4-4. Material quantification for placing Submar Mats in full reservoir according to surface area of the dam face requiring armoring. ............................................................. 20 Table 4-5. Required Material for placing Contech Wave Attack Blocks in the Full Reservoir ........................................................................................................................... 21 Table 4-6. Summary of criteria met for each of the alternatives. ..................................... 23 Table 5-1. List of endangered and threatened species and details. ................................... 28 Table 5-2. List of facilities and details.............................................................................. 28 Table 5-3. List of migratory birds and details................................................................... 29 Table 6-1. Fontenelle average monthly inflow and outflows. .......................................... 35 Table 6-2. Fontenelle monthly average, maximum, and minimum end-of-month

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    195 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us