Columbia River Highway Reconnection Projects Have Received Letters of Support from the Following Organizations

Columbia River Highway Reconnection Projects Have Received Letters of Support from the Following Organizations

Milepost 2016 Reconnection Projects SUPPORTERS Since 2009 the Historic Columbia River Highway Reconnection Projects have received letters of support from the following organizations: Architectural Heritage Center Governor’s Office Economic Revitalization Team Bicycle Transportation Alliance Historic Columbia River Highway PROGRESS REPORT City of Astoria Advisory Committee City of Cascade Locks Hood River County City of Hood River Hood River Valley City of Mosier Residents Committee 2013 City of The Dalles Jeff Merkley, United States Senator City of Troutdale Metro Clackamas County Multnomah County Columbia Gorge Discovery Center Multnomah County Pedestrian Columbia River Gorge Commission and Bicycle Committee Columbia River Gorge Northwest Trail Alliance National Scenic Area Oregon Chapter of the American Society Columbia River Gorge of Landscape Architects Visitors Association Oregon Parks Confederated Tribes of the and Recreation Department Grand Ronde Pedal Bike Tours Confluence Project Peter Defazio, Cycle Oregon Member of Congress Cycle Wild Port of Cascade Locks Earl Blumenauer, Port of Hood River Member of Congress Port of The Dalles East Multnomah County Chamber of Commerce Portland Wheelman Touring Club East Multnomah County Transportation Portland Women’s Forum Coordinating Committee Ron Wyden, Friends of Multnomah Falls, United States Senator Board of Directors Sierra Club Friends of the Columbia River Gorge Columbia Chapter Friends of the Travel Oregon Historic Columbia River Highway Travel Portland Friends of Vista House Wasco County Mile Post 2016 n the cover: Mile Post 2016 World class adventure...from Portland to The Dalles The new McCord Creek Bridge on the Historic Columbia For more information on this project visit... River Highway State Trail http://www.oregon.gov/ODOT/HWY/HCRH/ Reconnecting the Historic Highway as a trail RECONNECTION SEGMENTS AND FUNDING STATUS MAY 2013 COMPLETE REMAINING (Summer 2013) To Be Constructed COMPLETE lumbia River Co HOOD RIVER CASCADECASCADE LOCKSLOCKS MOSIER BRIDAL VEIL TROUTDALE CORBETT NORTH SCALE 0 1 2 4 MILES THE RUTHTON THE MITCHELL POINT DALLESDALLES Proposed Tunnel PARK VIENTO STATE LEGEND STARVATION CREEK PARK SHELLROCK STATE PARK MOUNTAIN LINDSEY DRIVEABLE CREEK STATE TRAIL FUTURE TRAIL EXIT 51 r EXIT 62 Colu ve mbia Ri FUNDED NOT FUNDED HOOD WYETH RIVER PHASE 2: 4 MILES PHASE 1: 6 MILES [$21.1M Total Funding Needed] [$21.9M Total Funding Needed] TOTAL FUNDING NEEDED A B C D E F G H TRAIL CONSTRUCTION $43.0M ENVIRONMENTAL RECREATIONAL UPGRADES $ 4.5M ENGINEERING $2.0M $ .5M $ .8M TOTAL NEEDED $47.5M CONSTRUCTION $2.1M $4.5M $5.0M $0 $9.5M $11.1M $2.8M $4.7M NORTH ENLARGEMENT SCALE FUNDS NEEDED $2.1M $4.5M $5.0M $0 $9.5M $13.1M $3.3M $5.5M 0 1 2 MILES Mile Post 2016 For more information on this project visit... http://www.oregon.gov/ODOT/HWY/HCRH/.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us