ARRA Project List.Xls Revised: 4/7/09 ELIGIBLE MUNICIPAL AMERICAN RECOVERY and REINVESTMENT ACT PROJECTS

ARRA Project List.Xls Revised: 4/7/09 ELIGIBLE MUNICIPAL AMERICAN RECOVERY and REINVESTMENT ACT PROJECTS

ELIGIBLE MUNICIPAL AMERICAN RECOVERY AND REINVESTMENT ACT PROJECTS Total State Estimated Construction Participating City/Town Program Project # Location Project Cost Portion ARRA Cost Ad Date Bristol-Hill SAB 14278A Borough Road/Smith River $1,268,158 $1,150,433 $690,260 4/30/2009 Durham SAB 14453 Wiswall Road over Lamprey River $2,366,630 $2,127,000 $1,276,200 4/30/2009 Plaistow SAB 14390 Garden Road/Little River $546,000 $490,000 $294,000 4/30/2009 Salem SAB 15593 Lawrence Road/Spicket River $1,800,348 $1,662,000 $997,200 4/30/2009 Barnstead SAB 15264 Welch Road $263,037 $232,912 $139,747 5/1/2009 Rochester SAB 14019 NH 202A (North Main Street)/Cocheco River $758,300 $650,000 $390,000 5/1/2009 Center Harbor SAB 15403 High Haith Road/Squam Lake Canal $642,272 $543,872 $326,323 5/4/2009 Antrim SAB 14944 Old North Branch $1,110,127 $920,000 $552,000 5/11/2009 Keene SAB 13710 Court Street (NH 12A)/Ashuelot River $3,250,000 $2,960,000 $1,776,000 5/22/2009 Wentworth SAB 14517A Saunders Hill Road over Baker River $395,000 $360,000 $216,000 6/1/2009 Canaan SAB 14446 River Road/Mascoma River $633,350 $549,322 $329,593 6/15/2009 Columbia-Lemington VT SAB 13815 Columbia Covered Bridge/Connecticut River $170,000 $170,000 $102,000 6/15/2009 Randolph SAB 14386 Durand Road $439,358 $365,923 $219,554 6/15/2009 Swanzey SAB 14195 Main Street, Thompson Covered Bridge $793,159 $685,000 $411,000 6/25/2009 Charlestown SAB 13534 Fling Road over Clay Brook $412,754 $325,000 $195,000 6/26/2009 Danville SAB 13535 Sandown Road over Exeter River $688,475 $626,000 $375,600 7/7/2009 Northumberland SAB 14234 Brooklyn St/Roaring Brook $780,427 $630,000 $378,000 7/15/2009 Bradford SAB 14284 West Road over Hoyt Brook $525,000 $460,000 $276,000 8/1/2009 Deering-Antrim SAB 14237 West Deering Road/Contoocook River $1,140,000 $1,070,000 $642,000 8/1/2009 Lee SAB 14842 High Street/North River $980,000 $870,000 $522,000 8/14/2009 Newbury SAB 14916 Village Road over Andrew Brook $985,600 $880,000 $528,000 8/31/2009 Salisbury SAB 14626A Mountain Road/Blackwater River $1,541,300 $1,253,800 $752,280 9/21/2009 Harrisville SAB 15665 Hancock Road over Skatutakee Lake $380,000 $310,000 $186,000 9/28/2009 Ashland SAB 14262 River Street over Squam River $345,000 $290,000 $174,000 10/15/2009 Bethlehem SAB 14228 Prospect St $220,000 $185,000 $111,000 12/1/2009 Campton SAB 12407 Blair Road over Pemigewasset River $315,500 $315,500 $189,300 12/1/2009 Grafton SAB 13373A Mill Brook Road over Mill Brook $300,000 $250,000 $150,000 12/1/2009 Gilford SAB 15626 Area Road over Poor Farm Brook $500,000 $415,000 $249,000 12/10/2009 Brentwood SAB 15277 Crawley Falls Road $351,546 $270,000 $162,000 12/15/2009 Derry SAB 13650 Fordway Road over Beaver Brook $181,400 $120,000 $72,000 12/15/2009 Farmington SAB 15677 Bay Road/Cocheco River $505,000 $425,000 $255,000 12/15/2009 Merrimack SAB 15324 Turkey Hill Road over Souhegan River $1,264,685 $1,125,000 $675,000 12/15/2009 New Boston SAB 14247 Lyndeborough Road/S Br Piscataquog River $1,702,598 $1,507,400 $904,440 12/15/2009 Winchester SAB 15317 Old Westport Road over Wheelock Brook $435,000 $355,000 $213,000 12/15/2009 Weare SAB 14339 Peaslee Road over Piscataquog River $835,000 $725,000 $435,000 12/25/2009 Peterborough SAB 14933 Main Street over Contoocook River $825,000 $700,000 $420,000 1/5/2010 Alexandria SAB 14964 Washburn Road/Patten Brook $1,137,200 $1,015,000 $609,000 Dover SAB 13796 Washington Street over B&M RR $505,000 $400,000 $240,000 Dublin SAB 15684 Charcoal Road over Charcoal Brook $365,000 $285,000 $171,000 Newport SAB 14969 Paradise Road over Sugar River $665,000 $560,000 $336,000 Sutton SAB 15346 Morse Loop Road/Brook $661,871 $572,163 $343,298 p:\bond funding programs\ARRA Project List.xls Revised: 4/7/09 ELIGIBLE MUNICIPAL AMERICAN RECOVERY AND REINVESTMENT ACT PROJECTS Total State Estimated Construction Participating City/Town Program Project # Location Project Cost Portion ARRA Cost Ad Date Temple SAB 14937 Putnam Road over Brook & Brook Overflow $300,000 $245,000 $147,000 p:\bond funding programs\ARRA Project List.xls Revised: 4/7/09 ELIGIBLE MUNICIPAL AMERICAN RECOVERY AND REINVESTMENT ACT PROJECTS Total State Estimated Construction Participating City/Town Program Project # Location Project Cost Portion ARRA Cost Ad Date Unity SAB 14248 Stage Road $550,200 $464,200 $278,520 Bedford SAH 15670 101/Nashua Road intersection $1,050,000 $1,050,000 $700,000 4/30/2009 Londonderry SAH 15589 Route 28/Page Road Intersection $525,000 $525,000 $350,000 6/1/2009 Hancock SAH 15685 Main Street &123/137 $600,000 $600,000 $400,000 9/1/2009 Moultonborough SAH TBD Fox Hollow Road & Route 25 $599,622 $599,622 $399,748 Bennington TE 14401 VILLAGE PEDESTRIAN IMPROVEMENTS $700,000 $556,100 $556,100 4/15/2009 Hillsborough TE 13893 STONE ARCH BRIDGE PRESERVATION $170,000 $142,900 $142,900 4/15/2009 Lancaster TE 14836 US 2 & MECHANIC STREET SIDEWALK $190,075 $184,075 $184,075 4/15/2009 Windham TE 14830 REHABILITATE WINDHAM DEPOT $210,000 $173,100 $173,100 4/15/2009 Laconia TE 14409 Ph. 1: WOW TRAIL $636,260 $583,000 $583,000 4/21/2009 Litchfield TE 14838 ALBUQUERQUE AVE TRAIL COMPLETION $540,000 $440,500 $440,500 4/24/2009 Tilton-Northfield TE 14839 Ph. 2: WINNIPESAUKEE RIVER TRAIL $288,300 $240,250 $240,250 4/24/2009 Boscawen TE 14402 NORTH MAIN ST, KING ST SIDEWALKS $553,500 $461,000 $461,000 5/1/2009 Durham TE 14405 NH155A/MAIN STREET IMPROVEMENTS $851,151 $722,151 $722,151 5/1/2009 Hudson TE 13894 NH 102, CONSTRUCT SIDEWALK $401,000 $340,000 $340,000 5/15/2009 Milford TE 14837 SOUTH STREET IMPROVEMENT PROJECT $625,000 $550,000 $550,000 5/28/2009 Amherst TE 14832 TOWN HALL BEAUTIFICATION & SAFETY $261,000 $214,000 $214,000 6/2/2009 North Hampton TE 14820 NH 111, SCHOOL ZONE SIDEWALKS $285,480 $218,480 $218,480 6/23/2009 Littleton TE 13897 Ph. 2: PATHWAY & TRANSP MUSEUM $239,400 $198,500 $198,500 7/6/2009 Dublin TE 14319 Ph. 1: MAIN ST IMPROVEMENTS $315,000 $210,000 $210,000 7/22/2009 Andover/Wilmot/Danbury TE 14823 NORTHERN RAIL TRAIL: IMPROVEMENTS $260,549 $224,100 $224,100 8/1/2009 Belmont TE 14400 Ph. 1: LAKE WINNISQUAM SCENIC TRAIL $353,400 $283,490 $283,490 8/1/2009 Hollis TE 13488 ASH STREET (NH 130) $160,000 $128,000 $128,000 8/1/2009 Newport TE 13500 REHAB FOR COVERED RR BRIDGES $611,392 $476,392 $476,392 8/1/2009 Franklin/Northfield/Tilton TE 13890 Ph. 2: WINNIPESAUKEE RIVER TRAIL $490,000 $409,187 $409,187 9/4/2009 Gilford TE 14825 Ph. 4: ALVAH WILSON ROAD, SIDEWALKS $168,383 $158,383 $158,383 9/8/2009 Keene TE 14834 CHESHIRE RAIL TRAIL $80,550 $65,550 $65,550 9/25/2009 Conway TE 14821 NH 16, VILLAGE STREETSCAPE PROJECT (Contact$592,000 Joseph Quirk$541,200 662-4020) $541,200 11/1/2009 Portsmouth TE 13903 BOW STREET, PISCATAQUA RIVERWALK $1,618,830 $1,442,830 $1,442,830 12/1/2009 Portsmouth TE 14417 TRADE PORT MULTI-USE PATH $515,000 $450,000 $450,000 12/30/2009 Belmont TE 14829 Ph. 2: LAKE WINNISQUAM SCENIC TRAIL $437,382 $349,906 $349,906 Bethlehem TE 13087 US 302, TRAFFIC & PEDESTRIAN SAFETY $44,500 $35,000 $35,000 Enfield TE 14406 US Route 4, Construct Sidewalk $173,000 $133,000 $133,000 Hudson TE 14408 TRAIN STOP DEPOT $273,572 $253,031 $253,031 Laconia TE 14826 Ph. 2: WOW TRAIL $449,219 $89,560 $89,560 Merrimack TE 14413 DW HIGHWAY, CONSTRUCT SIDEWALKS $367,200 $306,200 $306,200 New Boston TE 14835 MILLPOND FOOTBRIDGE $300,000 $273,500 $273,500 New Castle TE 14827 NH 1B, CONSTRUCT SIDEWALK $124,000 $104,000 $104,000 Swanzey TE 14421 ASHUELOT RAIL TRAIL IMPROVEMENT $110,434 $88,434 $88,434 p:\bond funding programs\ARRA Project List.xls Revised: 4/7/09 ELIGIBLE MUNICIPAL AMERICAN RECOVERY AND REINVESTMENT ACT PROJECTS Total State Estimated Construction Participating City/Town Program Project # Location Project Cost Portion ARRA Cost Ad Date Tamworth TE 14423 NH 113, PAVED SHOULDERS $96,250 $80,250 $80,250 Tamworth TE 14833 NH 113, CONSTRUCT PAVED SHOULDERS $44,738 $37,282 $37,282 Wakefield TE 14824 PAUL SCHOOL SIDEWALK PROJECT $219,000 $179,520 $179,520 Whitefield TE 14425 US 3, UPGRADE DRAINAGE & SIDEWALKS $67,900 $58,900 $58,900 p:\bond funding programs\ARRA Project List.xls Revised: 4/7/09.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    4 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us