Metro District, Erosion Control, AREAS of CONCENTRATED FLOW Valid for Spring, Summer, & Fall

Metro District, Erosion Control, AREAS of CONCENTRATED FLOW Valid for Spring, Summer, & Fall

Will this stabilization be YES Follow Final Stabilization Plan permanent? NO Is exposed soil an area NO See AREAS W/O CONCENTRATED FLOW of concentrated flow? YES NOTE 1: If area is within 200’ of surface water Is the area adjacent to Will area remain unworked Use Rolled Erosion Con- YES or inlet, then stabilization time is 24 hours and native plantings or will YES for more than one con- trol Product Category 4, Is the area 3:1 slope or YES natural netting should be used. Otherwise, sta- the final stabilization struction season? natural netting, with Sedi- bilization time is 7 days* and follow chart rec- steeper? include native plant- ment Control Logs Type ommendations on netting type. ings? wood fiber or compost, NO NO seed 21-113 (before Aug 1) NOTE 2: Always install rolled erosion control or 21-112 (Aug 1 or later) product to at least cover the wetted perimeter of Is the area adjacent to NO flow conditions. native plantings or will the final stabilization Use Rolled Erosion include native plant- NO Control Product Cat- ings? Will area remain unworked egory 4, natural net- Will area remain unworked for more than one con- ting, with Sediment struction season? Control Logs Type for more than one con- YES struction season? wood fiber or com- YES NO post, seed 21-111 YES NO Use Rolled Ero- (before Aug 1) or 21- sion Control 112 (Aug 1 or later) Product Catego- Use Rolled Erosion Use Rolled Erosion Control Product Cat- Control Product Cat- Use Rolled Use Rolled Erosion ry 3**, natural egory 4, natural or egory 4, natural or Erosion Con- Control Product netting, seed 21- plastic netting, with plastic netting, with trol Product Category 3**, nat- 113 (before Aug Sediment Control Sediment Control Category 3**, ural or plastic net- 1) or 21-112 (Aug Logs Type wood fi- Logs Type wood fi- natural net- ting, seed 21-111 1 or later) ber or compost, seed ber or compost, seed ting, seed 22- (before Aug 1) or 22-111 21-111 (before Aug 1) *Can complete within 14 111 21-112 (Aug 1 or or 21-112 (Aug 1 or days if allowed by the later) later) SWPPP **Wood fiber is preferred for Rolled Erosion Control Products Metro District, Erosion Control, AREAS OF CONCENTRATED FLOW Valid for Spring, Summer, & Fall .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us