Resource Plan (FY2020-FY2029)

Resource Plan (FY2020-FY2029)

Resource Plan (FY2020-FY2029) JULY 2018 Resource Plan for 4th & 5th Control Period (FY 19- 20 to FY 28-29) 1 1 AP State Load forecast & Power procurement Plan for the 4th Control Period (FY 2019-20 to FY 2023-24) and 5th Control Period (FY 2024-25 to FY 2028-29) 2 2 Contents 1 STATE LOAD FORECAST AND RESOURCE PLAN OF ANDHRA PRADESH ..................................... 5 1.1 INTRODUCTION .................................................................................................................................................... 5 1.2 POWER FOR ALL ................................................................................................................................................... 6 1.3 ANDHRA PRADESH POWER SECTOR AT A GLANCE: .......................................................................................... 7 1.4 PRESENT POWER SUPPLY POSITION: .................................................................................................................. 7 1.5 CONSOLIDATED SALES AND LOAD FORECAST .................................................................................................. 8 1.5.1 Transmission Losses ..................................................................................................................................... 8 1.5.2 Off grid Solar ................................................................................................................................................ 9 1.5.3 State Level Load Factors ............................................................................................................................... 9 1.6 FORECAST FROM FY2024-25 TO FY 2028-29 .............................................................................................................. 12 1.7 COMPARISON OF LOAD FORECASTS ................................................................................................................. 13 2 POWER PROCUREMENT PLAN ..................................................................................................................... 14 2.1 INSTALLED CAPACITY FROM VARIOUS SOURCES ............................................................................................................... 14 2.1.1 APGENCO Thermal ..................................................................................................................................... 14 2.1.2 APGENCO Hydel .......................................................................................................................................... 15 2.1.3 Central Generating Stations ....................................................................................................................... 16 2.1.4 APGPCL, APDISCOM & IPP Gas ................................................................................................................... 17 2.1.5 IPP Others ................................................................................................................................................... 17 2.1.6 NCE Total .................................................................................................................................................... 18 2.2 RENEWABLE POWER PURCHASE OBLIGATIONS ............................................................................................................... 21 2.3 POWER SURPLUS /DEFICIT ANALYSIS (ENERGY (MUS) AND POWER (MW)) ........................................................................ 22 2.4 MU ANALYSIS: ......................................................................................................................................................... 23 2.4.1 MU Availability ........................................................................................................................................... 23 2.5 MU DEMAND .......................................................................................................................................................... 24 2.5.1 Energy Balance (MUs) ................................................................................................................................ 24 2.6 TIME SERIES BASED APPROACH FOR MW ANALYSIS ......................................................................................................... 24 2.6.1 Demand Forecast ....................................................................................................................................... 24 2.6.2 Plant Supply Forecast ................................................................................................................................. 25 2.6.3 Surplus/Deficit (MW Analysis) .................................................................................................................... 26 2.7 POWER PROCUREMENT PLAN FOR MEETING THE DEFICIT .................................................................................................. 27 3 APTRANSCO TRANSMISSION PLAN (RESOURCE PLAN) FOR THE FY 2018-19. ............................ 29 3.1 INTRODUCTION TO TRANSMISSION RESOURCE PLAN ................................................................................................... 30 3.2 TRANSMISSION RESOURCE PLAN FY 2019 .................................................................................................................... 30 3.3 THE ASSUMPTIONS AND STANDARDS ADOPTED WHILE CONDUCTING LOAD FLOW STUDIES FOR UHV (200KV AND ABOVE) ARE SHOWN BELOW. ................................................................................................................................................................. 31 3.4 CONTINGENCY CRITERIA: ............................................................................................................................................ 34 3.5 DISTRICT WISE LOAD FORECAST .................................................................................................................................... 35 3.6 EVACUATION SCHEMES AT 400 KV AND 220 KV ............................................................................................................. 36 3.7 INVESTMENT PLAN 220 KV AND 400 KV: ...................................................................................................................... 41 3.8 132 KV TRANSMISSION SYSTEM .................................................................................................................................. 42 3.9 TRANSMISSION INVESTMENTS ..................................................................................................................................... 42 3.10 CONTINGENCIES ................................................................................................................................................... 52 3.11 CIRCUIT BREAKER INTERRUPTING CAPABILITY ............................................................................................................ 52 3.12 SHORT CIRCUIT STUDIES ........................................................................................................................................ 53 4 APTRANSCO TRANSMISSION PLAN (RESOURCE PLAN) FOR 4TH CONTROL PERIOD ............. 54 4.1 TRANSMISSION RESOURCE PLAN FROM FY 2019 TO FY2024 ........................................................................................... 55 3 3 THE STANDARDS ADOPTED WHILE CONDUCTING LOAD FLOW STUDIES FOR UHV (200KV AND ABOVE) ARE SHOWN IN CHAPTER 3.3 ........ 55 4.2 INVESTMENT PLAN 220 KV AND 400 KV ....................................................................................................................... 56 4.3 TRANSMISSION SYSTEM (132 KV) ............................................................................................................................... 56 4.4 TOTAL TRANSMISSION INVESTMENTS ............................................................................................................................ 57 4.5 BUS REPORT FOR 2024 STUDY.............................................................................................................................. 89 4.6 LINE REPORT FOR 2024 STUDY ........................................................................................................................... 105 4.7 TRANSFORMER REPORT FOR 2024 STUDY: .................................................................................................................. 136 4.8 SHORT CIRCUIT RESULTS FOR 2024 STUDY: ................................................................................................................. 144 5 APTRANSCO TRANSMISSION PLAN (RESOURCE PLAN) FOR 5TH CONTROL PERIOD ........... 162 5.1 TRANSMISSION RESOURCE PLAN FROM FY 2025 TO FY2029 ......................................................................................... 163 THE STANDARDS ADOPTED WHILE CONDUCTING LOAD FLOW STUDIES FOR UHV (200KV AND ABOVE) ARE SHOWN IN CHAPTER 3.3 ...... 163 5.2 INVESTMENT PLAN 220 KV AND 400 KV ..................................................................................................................... 164 6 COST DATA OF TRANSMISSION LINES AND SUBSTATIONS ......................................................... 182 4 4 1 State Load forecast and Resource plan of Andhra Pradesh 1.1 Introduction The Andhra Pradesh Electricity Regulatory Commission (APERC), Regulation 5 of 2005 directs APTRANSCO to collect and consolidate sales forecast and power procurement from distribution licensees and to file Resource Plan for Hon’ble Commission’s approval. The Resource Plan shall

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    196 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us