SUPPLEMENTAL Published July 22, 2020

SUPPLEMENTAL Published July 22, 2020

SUNCOR ENERGY Investor Information SUPPLEMENTAL Published July 22, 2020 SUNCOR ENERGY Table of Contents 1. Energy Sources 2. Processing, Infrastructure & Logistics 3. Consumer Channels 4. Sustainability 5. Technology Development 6. Integrated Model Calculation 7. Glossary SUNCOR ENERGY 2 SUNCOR ENERGY EnergyAppendix Sources 3 202003- 038 Oil Sands Energy Sources *All values net to Suncor In Situ Mining Firebag Base Plant 203,000 bpd capacity 350,000 bpd capacity Suncor WI 100% Suncor WI 100% 2,603 mmbbls 2P reserves1 1,350 mmbbls 2P reserves1 Note: Millennium and North Steepank Mines do not supply full 350,000 bpd of capacity as significant in-situ volumes are sent through Base Plant MacKay River Syncrude 38,000 bpd capacity Syncrude operated Suncor WI 100% 205,600 bpd net coking capacity 501 mmbbls 2P reserves1 Suncor WI 58.74% 1,217 mmbbls 2P reserves1 Future opportunities Fort Hills ES-SAGD Firebag Expansion Suncor operated Lewis (SU WI 100%) 105,000 bpd net capacity Meadow Creek (SU WI 75%) Suncor WI 54.11% 1,365 mmbbls 2P reserves1 First oil achieved in January 2018 SUNCOR ENERGY 1 See Slide Notes and Advisories. 4 1 Regional synergy opportunities for existing assets Crude logistics Upgrader feedstock optionality from multiple oil sands assets Crude feedstock optionality for Edmonton refinery Supply chain Sparing, warehousing & supply chain management Consolidation of regional contracts (lodging, busing, flights, etc.) Operational optimizations Unplanned outage impact mitigations In Situ Turnaround planning optimization Process and technology sharing 100% WI Joint ownership Base mine upgrader and terminal U Syncrude upgrader Assets and resource developments C In situ central processing facility Lease development and asset utilization optimization P Fort Hills primary/secondary extraction Pipelines Sanctioned bi-directional pipelines1 SUNCOR ENERGY 1 See Slide Notes and Advisories 5 Long life, low decline reserves base 1 Typical attributes of North American oil plays Initial Decline Sustaining Operating Reservoir Recovery 2 3 Illustrative annual FFO profiles capital rate costs cost risk factor Mining High Very low Low Medium Very low Very high ~85% of Suncor’s 2020 production guidance In Situ Medium Low Low Low Low High Offshore ~15% of Suncor’s 2020 High Medium Medium Very low Medium Medium production guidance Tight Oil Low Very high High Medium High Low 50 Years Beneficial attribute Challenging attribute SUNCOR ENERGY 1, 2, 3 See Slide Notes and Advisories 6 Offshore with >370 million barrels of 2P reserves 1 East Coast Canada North Sea Hibernia ExxonMobil operated Buzzard (UK) Suncor working interest 20% CNOOC Petroleum Europe Limited operated 61 mmboe 2P reserves1 (Suncor WI) Suncor working interest 29.9% 1 2019 avg net production: 20.1 mbbls/d 63 mmboe 2P reserves (Suncor WI) 2019 avg net production: 31.9 mboe/d Hebron ExxonMobil operated Suncor working interest 21.0% 138 mmboe 2P reserves1 (Suncor WI) Golden Eagle (UK) 2019 avg net production: 23.5 mbbls/d CNOOC Petroleum Europe Limited operated Suncor working interest 26.7% 10 mmboe 2P reserves1 (Suncor WI) 2019 avg net production: 9.0 mboe/d Terra Nova Suncor Energy operated Suncor working interest 37.7% 25 mmboe 2P reserves1 (Suncor WI) Oda (Norway) 2019 avg net production: 11.6 mbbls/d Spirit Energy operated3 Suncor working interest 30% 7 mmboe 2P reserves1 (Suncor WI) White Rose First oil achieved March 2019 Husky Energy operated 2019 avg net production: 3.7 mboe/d Suncor working interest 27.5%2 Note: Q4 2019 avg net production: 7.8 mboe/d 54 mmboe 2P reserves1 (Suncor WI) 2019 avg net production: 4.7 mbbls/d SUNCOR ENERGY 1, 2, 3 See Slide Notes and Advisories 7 E&P – Investing in high value, low risk projects Recent performance Sanctioned projects1 mboe/d Fenja (Norway) 120 • 17.5% working interest 100 • 6 mbbls/d anticipated net peak production Hebron 80 White Rose Buzzard Phase 2 (UK) Hibernia 60 Terra Nova • 29.9% working interest 40 Golden Eagle • Production anticipated to offset natural declines Buzzard 20 4 West White Rose Project (ECC ) 0 2012 2013 2014 2015 2016 2017 2018 2019 • ~26% working interest • 20 mbbls/d anticipated net peak production 112 109 99 4 $billions Terra Nova Asset Life Extension (ECC ) 2.5 • 37.7% working interest 71 64 54 Brent • Extend asset life by approximately a decade 2.0 52 44 ($US/bbl) • Expect to produce additional 30 million barrels (Suncor WI) 1.5 FFO2 Free funds flow3 Capital spend 1.0 Future opportunities 0.5 • Rosebank-UK (40% Suncor WI) - • Near field developments including subsea 2012 2013 2014 2015 2016 2017 2018 2019 tie-backs, field extensions and infill drilling SUNCOR ENERGY 1, 2, 3, 4 See Slide Notes and Advisories 8 Power Generation Generating power for internal use & sale to the grid, including EV applications; currently 5th largest power producer in Alberta. 2,400 MW 1,400 MW 1 CURRENT CURRENT + SANCTIONED PROJECTS Cogen: 96%; Renewables: 4% (online by YE 2025) Cogen: 89%; Renewables: 11% MW Working interest nameplate capacity Net power sold to grid Net internally consumed power SUNCOR ENERGY 1 See Slide Notes and Advisories. 9 SUNCOR ENERGY Processing,Appendix Infrastructure & Logistics 10 202003- 038 Operations & Consumer Network 29 year Oil Sands Reserve Life Index1 ~25 mmbbl storage Western Canada ~1,850 PetroCanada sites2 ~15 mmbbl storage Eastern Canada Only refinery in Colorado ~10 mmbbl storage Central US & Gulf Coast OIL & REFINED PRODUCT STORAGE (SUNCOR OPERATED) SUNCOR ENERGY 1, 2 See Slide Notes & Advisories 11 Upgrading Upgrading processes heavy bitumen into a lighter, higher value product with a density Upgrading Process similar to that of WTI. LOW Once upgraded, the product can flow on a VALUE Mined & In-Situ Bitumen pipeline without the addition of diluent. HEAVY OIL (10° API) Total Suncor Net Upgrading Capacity: ~555 kbpd1 Coking, hydroconversion, • Base Plant ~15 – 20% yield loss thermal cracking &/or through upgrading process – 2 Upgrading Units hydrocracking • U1: 110 kbpd • U2: 240 kbpd – Produces sour & sweet SCO & diesel HIGH Sour Synthetic Crude Oil Optional: Hydrotreating (remove sulfur) • Syncrude (Gross values below – Suncor WI 58.74%) VALUE (30 - 35° API) LIGHT – 3 Upgrading Units OIL • U1: 100 kbpd • U2: 100 kbpd • U3: 150 kbpd Refinery Sweet Synthetic Crude Oil – Produces sweet SCO (30 - 35° API) • Edmonton Refinery – 30 kbpd coking capacity SUNCOR ENERGY 1 See Slide Notes & Advisories 12 Suncor’s proven oil sands reliability journey Suncor Base Plant upgrader reliability Multi-year journey to reach >90% reliability 1 2 91% 90% 91% 90% 90% 83% 81% 79% Suncor began focusing on upgrader reliability initiatives in 2011 Firebag to Base Mine Culture – Operational excellence mindset interconnect Process – Integrated maintenance strategy/approach pipeline fully operational Infrastructure – Asset integration between Firebag and Base Plant 2012 2013 2014 2015 2016 2017 2018 2019 Syncrude plant reliability In 2019, Syncrude achieved 2nd best A similar multi year journey targeting >90% reliability3 annual production in asset’s history with 85% utilization5 2016/17 2018/19 2020/21 (Target >90% reliability) Collaboration Culture Infrastructure Suncor’s active involvement in 31 technical/management Two bi-directional pipelines connecting Syncrude & Suncor’s base mine Syncrude’s reliability secondees from Suncor sharing Expected cost for the <15 km distance is ~$200M (gross)4 improvement plan operational discipline learnings Better utilization of existing assets: Sharing technical & reliability Process synergies • Normal operations - Transfer of sour synthetic and bitumen between assets best practices and support to Leveraging service & materials • Planned and unplanned outages - Asset and production optimizations improve productivity, reliability economies of scale and reduce costs Maintenance planning & execution Anticipated in-service 2H 2020 coordination SUNCOR ENERGY 1, 2, 3, 4, 5 See Slide Notes & Advisories 13 Market Access Suncor has made strategic investments in refineries and current/proposed logistics infrastructure to mitigate Alberta egress limitations & market disconnects Fort McMurray ~750 Alberta egress bottleneck does not impact the ability to move Suncor barrels1 142 Edmonton Hardisty Enbridge Line 3 Potential Markets Regina Central & Eastern Vancouver Cromer Canada, US Midwest & Gulf Coast 137 Montreal TMEP Potential Superior Markets Asia & California 85 Sarnia Steele City Chicago 98 Commerce Patoka City San Francisco Cushing Los Angeles KXL Potential Markets Pipelines 2 Heavy oil refineries (current and forecasted gross capacity ) along the Gulf Coast Feeder lines 2 Houston/Texas City Trans Mountain Pipeline, TMPL (300 mbpd) Suncor refinery capacity mbpd Trans Mountain Expansion , TMEP – Proposed3 (+590 mbpd)2 Industry approximate rail Express, Platte and Rocky Mountain (280 mbpd)2 mbpd loading capacity in TransCanada Keystone (590 mbpd)2 AB/SK TransCanada Keystone XL – Proposed3 (+830 mbpd) 2 Enbridge Mainline (2,600 mbpd)2 Enbridge Line 3 – Proposed3 (+370 mbpd) 2 Enbridge Line 9 (300 mbpd)2 Flanagan South Pipeline (585 mbpd)2 SUNCOR ENERGY 1, 2, 3 See Slide Notes & Advisories Marine opportunities 14 SUNCOR ENERGY ConsumerAppendix Channels 15 202003- 038 Refined Product Markets ~540 mbpd Product sales in 1 2019 Edmonton refinery services region from BC to Ontario Montreal and 20% Sarnia have a local market Canadian reach over 22mm Export consumer fuel people5 capability 2 market to US Pacific NW ~300 Wholesale Cardlock Locations3 Commerce City’ s asphalt Commerce

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    46 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us