Copy of PMW Tutong District (Press Release) Memo010 011 19

Copy of PMW Tutong District (Press Release) Memo010 011 19

English Section Listed below are the designated areas for the planned maintenance work as for July , 2019: No. Day & Date Time Location Work Description Affected Areas for Outages Monday 8.00 am to 12.00 noon Kampong Ukong, Maintenance works for low voltage overhead Spg 418 to 519 Jln Penapar Ukong and From Spg 545 to 633 Kg 1 01st July 2019 1.30pm to 4.30 pm Mukim Ukong. lines. Ukong and surrounding area. Monday 8.00 am to 12.00 noon Kampong Tanah Burok, Maintenance works for low voltage overhead Spg 66, Spg 88, Spg 104, Spg 114 and Spg116 Kg Tanah Burok, 2 01st July 2019 1.30pm to 4.30 pm Mukim Pekan Tutong. lines. Jln Penanjong and surrounding area. Tuesday 8.00 am to 12.00 noon Kampong Ukong, Maintenance works for low voltage overhead Spg 418 to 519 Jln Penapar Ukong and From Spg 545 to 633 Kg 3 02nd July 2019 1.30pm to 4.30 pm Mukim Ukong. lines. Ukong and surrounding area. Tuesday 8.00 am to 12.00 noon Kampong Tanah Burok, Maintenance works for low voltage overhead Spg 66, Spg 88, Spg 104, Spg 114 and Spg116 Kg Tanah Burok, 4 02nd July 2019 1.30pm to 4.30 pm Mukim Pekan Tutong. lines. Jln Penanjong and surrounding area. Wedesday 8.00 am to 12.00 noon Kampong Ukong, Maintenance works for low voltage overhead Spg 418 to 519 Jln Penapar Ukong and From Spg 545 to 633 Kg 5 03rd July 2019 1.30pm to 4.30 pm Mukim Ukong. lines. Ukong and surrounding area. Wedesday 8.00 am to 12.00 noon Kampong Kiudang, Maintenanace work for Distribution Transformer at Kampong Kiudang Mosque and 6 03rd July 2019 1.30pm to 4.30 pm Mukim Kiudang. substation kampong Kiudang Mosque. surrounding area. Thursday 8.00 am to 12.00 noon Kampong Ukong, Maintenance works for low voltage overhead Spg 418 to 519 Jln Penapar Ukong and From Spg 545 to 633 Kg 7 04th July 2019 1.30pm to 4.30 pm Mukim Ukong. lines. Ukong and surrounding area. Kampong Nong Anggeh A part Kampong Nong Anggeh Thursday 8.00 am to 12.00 noon Maintenanace work for Distribution Transformer at 8 and Kampong Ukong, and A part of Kampong Ukong 04th July 2019 1.30pm to 4.30 pm substation kampong Nong Anggeh. Mukim Ukong. and surrounding area. Saturday 8.00 am to 12.00 noon Kampong Ukong, Maintenance works for low voltage overhead Spg 418 to 519 Jln Penapar Ukong and From Spg 545 to 633 Kg 9 06th July 2019 1.30pm to 4.30 pm Mukim Ukong. lines. Ukong and surrounding area. Monday 8.00 am to 12.00 noon Kampong Ukong, Maintenance works for low voltage overhead Spg 418 to 519 Jln Penapar Ukong and From Spg 545 to 633 Kg 10 08th July 2019 1.30pm to 4.30 pm Mukim Ukong. lines. Ukong and surrounding area. Monday 8.00 am to 12.00 noon Kampong Bebuloh, Replacement of Bare Conductor to Aerial Bundle A part of kg Bebuloh, 11 08th July 2019 1.30pm to 4.30 pm Mukim Pengkalan Batu. Cable Mukim Pengkalan Batu. Monday 8.00 am to 12.00 noon Kampong Kupang, Maintenance works for High voltage overhead A part of kg Kupang, 12 08th July 2019 1.30pm to 4.30 pm Mukim Keriam. lines. Mukim Keriam Page 1 Tuesday 8.00 am to 12.00 noon Kampong Ukong, Maintenance works for low voltage overhead Spg 418 to 519 Jln Penapar Ukong and From Spg 545 to 633 Kg 13 09th July 2019 1.30pm to 4.30 pm Mukim Ukong. lines. Ukong and surrounding area. Tuesday 8.00 am to 12.00 noon Kampong Bebuloh, Replacement of Bare Conductor to Aerial Bundle A part of kg Bebuloh, 14 09th July 2019 1.30pm to 4.30 pm Mukim Pengkalan Batu. Cable Mukim Pengkalan Batu. A part of kg Luagan Timbaran and A part of kg Birau ( Jln Tuesday 8.00 am to 12.00 noon Kampong Luagan Timbaran, Maintenance works for High voltage overhead 15 Peladang Muda, Birau), 09th July 2019 1.30pm to 4.30 pm Mukim Kiudang. lines. Mukim Kiudang. Wednesday 8.00 am to 12.00 noon Kampong Ukong, Maintenance works for low voltage overhead Spg 418 to 519 Jln Penapar Ukong and From Spg 545 to 633 Kg 16 10th July 2019 1.30pm to 4.30 pm Mukim Ukong. lines. Ukong and surrounding area. Wednesday 8.00 am to 12.00 noon Kampong Bebuloh, Replacement of Bare Conductor to Aerial Bundle A part of kg Bebuloh, 17 10th July 2019 1.30pm to 4.30 pm Mukim Pengkalan Batu. Cable Mukim Pengkalan Batu. Wednesday 8.00 am to 12.00 noon Maintenance works for High voltage overhead 18 Kampong Sg Paku, MukimTelisai A part of Kg Sg. Paku and surrounding area. 10th July 2019 1.30pm to 4.30 pm lines. Thursday 8.00 am to 12.00 noon Kampong Ukong, Maintenance works for low voltage overhead Spg 418 to 519 Jln Penapar Ukong and From Spg 545 to 633 Kg 19 11th July 2019 1.30pm to 4.30 pm Mukim Ukong. lines. Ukong and surrounding area. Thursday 8.00 am to 12.00 noon Kampong Bebuloh, Replacement of Bare Conductor to Aerial Bundle 20 A part of kg Bebuloh, Mukim Pengkalan Batu. 11th July 2019 1.30pm to 4.30 pm Mukim Pengkalan Batu. Cable Thursday 8.00 am to 12.00 noon kampong Penapar, Mukim Tanjong Maya Maintenanace work for Distribution Transformer at A part of Kg Penapar and 21 11th July 2019 1.30pm to 4.30 pm dan Kampong Ukong, Mukim Ukong. substation Spg 3 Penapar/Ukong. A part of Kg Ukong. Saturday 8.00 am to 12.00 noon Kampong Ukong, Maintenance works for low voltage overhead Spg 418 to 519 Jln Penapar Ukong and From Spg 545 to 633 Kg 22 13th July 2019 1.30pm to 4.30 pm Mukim Ukong. lines. Ukong and surrounding area. Saturday 8.00 am to 12.00 noon Kampong Bebuloh, Replacement of Bare Conductor to Aerial Bundle A part of kg Bebuloh, 23 13th July 2019 1.30pm to 4.30 pm Mukim Pengkalan Batu. Cable Mukim Pengkalan Batu. Tuesday 8.00 am to 12.00 noon Kampong Ukong, Maintenance works for low voltage overhead Spg 418 to 519 Jln Penapar Ukong and From Spg 545 to 633 Kg 24 16th July 2019 1.30pm to 4.30 pm Mukim Ukong. lines. Ukong and surrounding area. Tuesday 8.00 am to 12.00 noon Kampong Bebuloh, Replacement of Bare Conductor to Aerial Bundle A part of kg Bebuloh, 25 16th July 2019 1.30pm to 4.30 pm Mukim Pengkalan Batu. Cable Mukim Pengkalan Batu. Page 2 Bahasa Melayu Tersenarai di bawah adalah kawasan yang ditetapkan untuk kerja-kerja penyelenggaraan yang dirancang untuk bulan Julai, 2019: Bil Hari & Tarikh Masa Lokasi Keterangan Kerja Kawasan Yang Terjejas Gangguan Bekalan Elektrik Isnin 8.00pg hingga 12.00pg Kampong Ukong, Penyelenggaraan rangkaian Kawat atas voltan Spg 418 hingga Spg 519 Jln Penapar Ukong dan dariSpg 545 1 01hb Julai 2019 1.30ptg hingga 4.30ptg Mukim Ukong, Tutong rendah. hingga Spg 633 Kg Ukong dan kawasan sekitarnya. Isnin 8.00pg hingga 12.00pg Kampong Tanah Burok, Penyelenggaraan rangkaian Kawat atas voltan Spg 66, Spg 88, Spg 104, Spg 114 dan Spg116 Kg Tanah Burok, 2 01hb Julai 2019 1.30ptg hingga 4.30ptg Mukim Pekan Tutong rendah. Jln Penanjong dan kawasan sekitarnya. Selasa 8.00pg hingga 12.00pg Kampong Ukong, Penyelenggaraan rangkaian Kawat atas voltan Spg 418 hingga Spg 519 Jln Penapar Ukong dan dari Spg 545 3 02hb Julai 2019 1.30ptg hingga 4.30ptg Mukim Ukong rendah. hingga Spg 633 Kg Ukong dan kawasan sekitarnya. Selasa 8.00pg hingga 12.00pg Kampong Tanah Burok, Penyelenggaraan rangkaian Kawat atas voltan Spg 66, Spg 88, Spg 104, Spg 114 dan Spg116 Kg Tanah Burok, 4 02hb Julai 2019 1.30ptg hingga 4.30ptg Mukim Pekan Tutong rendah. Jln Penanjong dan kawasan sekitarnya. Rabu 8.00pg hingga 12.00pg Kampong Ukong, Penyelenggaraan rangkaian Kawat atas voltan Spg 418 hingga Spg 519 Jln Penapar Ukong dan dari Spg 545 5 03hb Julai 2019 1.30ptg hingga 4.30ptg Mukim Ukong rendah. hingga Spg 633 Kg Ukong dan kawasan sekitarnya. Rabu 8.00pg hingga 12.00pg Kampong Kiudang, Penyelenggaraan "Distribution Transformer" Masjid Kg Kiudang 6 03hb Julai 2019 1.30ptg hingga 4.30ptg Mukim kiudang di substation Masjid Kg Kiudang. dan kawasan sekitarnya. Khamis 8.00pg hingga 12.00pg Kampong Ukong, Penyelenggaraan rangkaian Kawat atas voltan Spg 418 hingga Spg 519 Jln Penapar Ukong dan dari Spg 545 7 04hb Julai 2019 1.30ptg hingga 4.30ptg Mukim Ukong rendah. hingga Spg 633 Kg Ukong dan kawasan sekitarnya. Khamis 8.00pg hingga 12.00pg kampong Nong Anggeh dan Kampong Penyelenggaraan "Distribution Transformer" Sebahagian Kg Nong Anggeh dan sebahagian Kg Ukong dan 8 04hb Julai 2019 1.30ptg hingga 4.30ptg Ukong, Mukim Ukong. di substation Kampong Nong Anggeh. kawasan sekitarnya. Sabtu 8.00pg hingga 12.00pg Kampong Ukong, Penyelenggaraan rangkaian Kawat atas voltan Spg 418 hingga Spg 519 Jln Penapar Ukong dan dari Spg 545 9 06hb Julai 2019 1.30ptg hingga 4.30ptg Mukim Ukong rendah. hingga Spg 633 Kg Ukong dan kawasan sekitarnya. Isnin 8.00pg hingga 12.00pg Kampong Ukong, Penyelenggaraan rangkaian Kawat atas voltan Spg 418 hingga Spg 519 Jln Penapar Ukong dan dari Spg 545 10 08hb Julai 2019 1.30ptg hingga 4.30ptg Mukim Ukong rendah.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    4 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us