Table 6.1 Indicative List of Transport Schemes

Table 6.1 Indicative List of Transport Schemes

231 Table 6.1 Indicative list of transport schemes anticipated comple- cost tion Scheme Description 2013- 2016 2017- post 21/22 2022 Rail Core scheme: Maidenhead and Crossrail 1 Heathrow in the west to Shenfield H and Abbey Wood in the east International services stopping at High Speed 1 L Stratford Direct services to a wider range of European destinations (making High Speed 1 L use of new European infrastruc- ture) London to the West Midlands and High Speed 2 H beyond. Improved rail freight terminals to New and/or expanded rail freight L serve London terminals to serve London Rail link from Barking - Gospel Improved rail freight routes M Oak line to West Coast Main Line Further capacity enhancement for Improved rail freight routes M the Felixstowe - Nuneaton route Westerly extension(s) potentially to Reading/Milton Keynes/ Watford/ Staines (via Airtrack) and/or ad- Crossrail 1 ditional services to Heathrow and M extensions West Drayton Easterly extension from Abbey Wood - Gravesend Enhanced southwest – northeast London capacity and connectiv- Crossrail 2 (formerly Chelsea ity. Scheme detail to be reviewed H Hackney line) to ensure maximum benefits and value for money Scheme to provide a fifth carriage (and associated infrastructure London Overground- Capacity works on the north, west and east M Improvement Programme London lines, as well as the Eus- ton – Watford ‘DC’ line) Barking - Gospel Oak line – elec- London Overground L trification and train lengthening Extension from Barking to Barking London Overground M Riverside THE LONDON PLAN MARCH 2015 anticipated comple- cost tion Scheme Description 2013- 2016 2017- post 21/22 2022 Stratford –Angel Road capacity West Anglia enhancement to enable the run- M ning of 4 trains per hour. Further service enhancements West Anglia (including four-tracking) across the M/H whole of the Lea Valley line Further capacity increases in- cluding increased speeds on the Essex Thameside M Tilbury loop and more 12 car services Ten-car capability on inner subur- ban South Central London M/L Twelve-car capability and addi- tional fast services (HLOS CP4) South Central London Further CP5 capacity increases M Works to allow 12 car running on Sidcup Bexleyheath, Greenwich, Woolwich, Dartford, Rochester, Southeast London M Hayes & Sevenoaks routes and redevelopment work at Victoria and Charing Cross Southeast London Further CP5 capacity increases M Ten-car capability on inner sub- Southwest London urban and Windsor lines (HLOS M CP4) Southwest London Further CP5 capacity increases M Electrification with associated Great Western H change in rolling stock allocation Great Northern Train lengthening (HLOS CP4) L Great Northern Further CP5 capacity increases L Further CP5 capacity increases in- cluding Bow Junction remodeling Great Eastern which will help increase frequency L of outer suburban services from 24 to 28 tph West Coast Further CP5 capacity increases L End of 2018: 24 trains per hour Thameslink H through core, expanded network Make greater use of 12-car capa- Thameslink M bility coverage 233 anticipated comple- cost tion Scheme Description 2013- 2016 2017- post 21/22 2022 Passenger congestion relief/on- ward movement capacity en- Rail termini enhancement hancement works. Schemes under M development including the provi- sion of step free access. Airport access Improved access to Heathrow Airport from south London being M considered Tube Jubilee line upgrade in delivery phase to provide additional capac- ity and improve journey times. Jubilee line Under the World Class Capacity M programme, further peak service train increases are planned, sub- ject to fleet expansion. Phase 1: Northern line upgrade in delivery phase to provide addition- Northern line M al capacity and improve journey times Phase 2: Northern line Upgrade 2 to deliver a further 20 per cent Northern line increase in capacity through the M simplification and recasting of service patterns Extension of the Northern line from Kennington to Battersea to Northern line Extension M support the regeneration of the Vauxhall/Nine Elms/Battersea area Victoria line upgrade in delivery phase including new rolling stock and signalling to provide additional capacity and improve journey Victoria line times. Under the World Class M Capacity programme, further peak service train increases are planned, subject to fleet expan- sion. Piccadilly line upgrade to provide additional capacity and improve Piccadilly line M journey times First new trains ex- pected to be delivered 2021/22 THE LONDON PLAN MARCH 2015 anticipated comple- cost tion Scheme Description 2013- 2016 2017- post 21/22 2022 Circle, District, Hammersmith & City and Metropolitan lines upgrade (including new air-con- Sub-Surface Railway (SSR) H ditioned rolling stock and new signalling) to provide additional ca- pacity and improve journey times Croxley rail link to Watford Junc- Metropolitan line M tion Central line upgrade: Including Central line new energy efficient and high ca- M pacity rolling stock and signalling Bakerloo line upgrade: Including Bakerloo line new energy efficient and high ca- M pacity rolling stock and signalling Bakerloo line southern extension; Bakerloo line potential scheme and route under H investigation Continuing programme of re- Station refurbishment/ moderni- furbishment/ modernisation of H sation/ programme stations Programme of core asset renewal to lock in benefits from the up- Core asset renewal H grades and maintain assets in a state of good repair Congestion relief (and step free access) schemes, including Victo- ria, Tottenham Court Road, Bond Tube station congestion relief Street, Bank Paddington (Ham- schemes mersmith & City line), Holborn, H Camden. A targeted station capacity pro- gramme looking at further conges- tion relief schemes A programme of work to include low energy lighting, smart electric- Energy-saving initiatives ity metering at stations and low loss conductor rails L/M Regenerative braking and auto- matic train control To be implemented as an integral part of the Tube upgrade pro- gramme 235 anticipated comple- cost tion Scheme Description 2013- 2016 2017- post 21/22 2022 DLR To temporarily relieve crowding Reconfiguration of train interiors L until additional trains are procured North Route Double Tracking (works associated with Cross- To increase reliability, frequency L rail funded- to be delivered by and capacity of line 2019) To support large scale devel- Additional Rolling Stock opments e.g. Royal Docks and L/M Olympic Park Station Improvement and ca- Improved efficiency of interchange pacity work: to accommodate increased pas- senger flows resulting from large scale developments, including: • Royal Albert and Gallions Reach station capacity up- grades • Congestion relief at Canning Town L • Increase capacity for inter- change between DLR and Crossrail (eg Custom House) to support Royal Docks devel- opments • Increase Shadwell and Pon- toon Dock station capacity to accommodate increasing passenger flows Work to support the Mayor’s ambi- tion for enhanced rail access to Bromley and southeast London, including Overground, rail and DLR Extensions DLR improvements. H Work towards potential extensions of west of Bank, and east of Gal- lions Reach Tramlink Potential extensions and/or ca- Further enhancements to the L/M Tramlink network pacity increases Double tracking to Wimbledon L THE LONDON PLAN MARCH 2015 anticipated comple- cost tion Scheme Description 2013- 2016 2017- post 21/22 2022 Buses and bus transit Regular review of bus network to cater for population, housing and employment growth, maintain ease of use, attractive frequencies Bus network development M and adequate capacity, reliable services, good coverage, effective priority and good interchange with other modes. Intention that all new buses enter- Low emission buses ing London’s fleet post 2012 be M low emission (initially diesel hybrid) Improved accessibility of bus Bus stop accessibility pro- stops- ensure that 95% of bus L gramme stops are accessible by the end of 2016 Bus priority / transit corridors- in- vestment supporting economic High Quality Bus Priority revitalisation in London’s Opportu- L nity Areas by providing new links and services Bus reliability pinch points (annual- ised scheme) – scheme to identify around 30 sites where bus prior- Bus Reliability L ity measures will be implemented to improve bus and road network reliability Cycling projects Delivery of a central London ‘Bike Grid’ of high quality, high-volume cycle routes, using a combination Central London Grid L of segregation and quiet shared streets, along with some innova- tive use of existing infrastructure. A well-signed network of ra- dial and orbital routes, mainly on low-traffic back streets, for those wanting a more relaxed cycle journey. Quietways Includes a central London ‘Bike L Grid’ of high quality, high volume cycle routes, using a combination of segregation and quiet shared streets along with some innovative use of existing infrastructure 237 anticipated comple- cost tion Scheme Description 2013- 2016 2017- post 21/22 2022 A network of attractive and functional routes for walking and Greenways L cycling to, and through, green spaces across the Capital. New radial routes to central Lon- don and improvements to existing Cycle Superhighways. Including Cycle Super fast and substantially segregated L highways cycle superhighways providing north-south and east-west routes through central London. Final year (2013-14) of delivery of a package of infrastructure and Biking Boroughs L supporting

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    12 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us