2006 State Transportation Improvement Program

2006 State Transportation Improvement Program

2006 State Transportation Improvement Program Current Official STIP - (STIP funds, RIP and IIP, only) Alameda County Entire State PPNO / EA State Funds by Fiscal Year & Component (IIP & RIP Funds Only) CTIPS ID RESPONSIBLE AGENCY - PROJECT TITLE FUND PEND VOTE VOTED FUNDS PROG (Programmed Dollars in Thousands) DIST CO RTE ELEMENT LOCATION/DESCRIPTION SOURCE LAST DATE TOTAL AMOUNT 06/07 07/08 08/09 09/10 10/11 11/12 R/WCON PA&EDPS&E R/W ENG CON ENG 04 ALA 0016Q Alameda County Congestion Management Agency - AB : PM: 106-0000-0972 3090 Reimbursement Project - AB 3090 Reimbursement RIP : 07/20/06 25,037 25,037 25,037 25,037 KP: Local Assistance Project the Route 880 Widening project (PPNO 0016F) : TOTAL: 25,037 25,037 25,037 25,037 04 ALA 1014 0U8601 Bay Area Rapid Transit District - BART Transbay Tube : PM: 106-0000-0750 Seismic Retrofit - In Alameda County from the Transbay RIP : 05/02/01 10,200 48,200 38,000 38,000 10,200 KP: Rail Tube to the West Portal of the Berkeley Hills Tunnel - : seismic joints, one at-grade station and one aerial station TOTAL: 10,200 48,200 38,000 38,000 10,200 04 ALA 1022 072584 City of Oakland - 42nd Ave/High St Access to I-880 - : PM: 106-0000-0722 Oakland - 42nd Avenue/High Street access improvements to RIP : 04/13/01 1,000 6,990 5,990 5,990 1,000 KP: Local Assistance Route 880 - preliminary engineering : TOTAL: 1,000 6,990 5,990 5,990 1,000 04 ALA 2009A T161TA Alameda Contra Costa Transit District - AC Transit : PM: 0.0/ 0.0 206-0000-2155 Maintenance Facilities Upgrade - In Alameda County: AC RIP : 09/07/06 3,705 3,705 3,705 3,705 KP: 0.0/ 0.0 Mass Transit Transit District-wide facilities & equipment upgrades. : TOTAL: 3,705 3,705 3,705 3,705 04 ALA 2009B T162TA Alameda Contra Costa Transit District - AC Transit SATCOM : PM: 0.0/ 0.0 206-0000-2156 Expansion - AC Transit: Expand AC Transit District's RIP : 09/07/06 1,000 1,000 1,000 1,000 KP: 0.0/ 0.0 Mass Transit satellite-based global tracking communication system. : TOTAL: 1,000 1,000 1,000 1,000 04 ALA 2009C T179TA Alameda Contra Costa Transit District - : PM: 0.0/ 0.0 206-0000-2157 Berkeley/Oakland/S.Leandro Corr MIS Study - AC Transit: RIP : 04/26/07 2,700 2,700 2,700 2,700 KP: 0.0/ 0.0 Mass Transit Along the Berkeley/Oakland/S. Leandro service corridor; : Complete Major Investment Study preceding the preliminary TOTAL: 2,700 2,700 2,700 2,700 04 ALA 2009D Alameda Contra Costa Transit District - Bus Component : PM: 0.0/ 0.0 206-0000-2159 Rehabilitation - AC Transit: Bus component rehabilitation is RIP : 07/20/06 4,500 4,500 4,500 4,500 KP: 0.0/ 0.0 Mass Transit designed to maintain the fleet in optimum operating condition : to ensure that sufficient vehicles are available to meet the TOTAL: 4,500 4,500 4,500 4,500 04 ALA 2009I Alameda Contra Costa Transit District - AC Transit : PM: 106-0000-1291 Rehabilitation Project - AC Transit - Bus component RIP : 7,738 7,738 7,738 KP: Mass Transit rehabilitation. : TOTAL: 7,738 7,738 7,738 04 ALA 2009K T178TA Livermore Amador Valley Transit District - Satellite Bus : PM: 0.0/ 0.0 106-0000-0455 Operating Facility -Phase 1 - Livermore: Expand RIP : 03/15/07 1,500 5,500 1,500 4,000 5,500 KP: 0.0/ 0.0 Mass Transit maintenance and operations facility which currently holds 50 : vehicles to hold additional 150. TOTAL: 1,500 5,500 1,500 4,000 5,500 04 ALA 2009L 924105 Alameda County - Vasco Road Safety Improvements - : PM: 0.0/ 0.0 206-0000-2167 Livermore: On Vasco Road about 1.8 miles N. of Livermore RIP : 4,600 4,600 4,600 KP: 0.0/ 0.0 Local Assistance to 1.6 miles South of CC County line; Realign roadway, : provide standard shoulder widths & add truck-climbing lanes. TOTAL: 4,600 4,600 4,600 Product of CTIPS Page 1 07/13/07 10:55:15 2006 State Transportation Improvement Program Current Official STIP - (STIP funds, RIP and IIP, only) Alameda County Entire State PPNO / EA State Funds by Fiscal Year & Component (IIP & RIP Funds Only) CTIPS ID RESPONSIBLE AGENCY - PROJECT TITLE FUND PEND VOTE VOTED FUNDS PROG (Programmed Dollars in Thousands) DIST CO RTE ELEMENT LOCATION/DESCRIPTION SOURCE LAST DATE TOTAL AMOUNT 06/07 07/08 08/09 09/10 10/11 11/12 R/WCON PA&EDPS&E R/W ENG CON ENG 04 ALA 2009N 44820K City of Alameda - Tinker Avenue Extension - Alameda: On : PM: 0.0/ 0.0 206-0000-0655 Tinker Avenue between Webster St and Main St; Construct RIP : 4,000 4,000 4,000 KP: 0.0/ 0.0 Local Assistance 4-lane extension to Tinker Ave, install signals, and modify : Webster St Tube off-ramp. TOTAL: 4,000 4,000 4,000 04 ALA 2009P Bay Area Rapid Transit District - BART Station Renovation - : PM: 106-0000-1290 Bart stations renovation throughout Alameda county. RIP : 3,248 3,248 3,000 248 KP: Mass Transit : TOTAL: 3,248 3,248 3,000 248 04 ALA 2009Q Alameda County Congestion Management Agency - Bus : PM: 106-0000-1328 Purchase - Purchase up to 50 replacement buses RIP : 10/12/06 14,000 14,000 14,000 14,000 KP: Mass Transit : TOTAL: 14,000 14,000 14,000 14,000 04 ALA 2009W Berkeley, City of - Ashby BART Station Intermodal : PM: 106-0000-1414 Improvements - By the Ashby BART Station - construct RIP : 3,814 3,814 3,814 KP: Mass Transit facility that will be a Transit Oriented Development serving : people with disabilities and encourage more transit use. TOTAL: 3,814 3,814 3,814 04 ALA 2009X Alameda Contra Costa Transit District - AC Transit Zero : PM: 106-0000-1417 Emission Bus Project - AC Transit will procure up to 5 new RIP : 7,810 7,810 7,810 KP: Mass Transit hydrogen-electric buses. This project is part of a larger MTC : regional demonstration project that will include a total of 4 TOTAL: 7,810 7,810 7,810 04 ALA 2009Y Bay Area Rapid Transit District - Ashby BART concourse : PM: 106-0000-1398 elevator improvements - Ashby BART Station - capacity RIP : 2,000 2,000 2,000 KP: Mass Transit expansion project to extend consourse, install additional : elevator and construct related improvements. TOTAL: 2,000 2,000 2,000 04 ALA 2021 SJRRC - San Joaquin Regional Rail Commission - : PM: 106-0000-0921 Livermore Valley Siding - Livermore Valley - construct : KP: Mass Transit approximately 8,000ft of railroad siding IIP : 1,000 1,000 1,000 TOTAL: 1,000 1,000 1,000 75 ALA 2083 Caltrans - ACE Corridor Signal Upgrade - From Stockton to : PM: 106-0000-1379 Fremont, along the ACE rail line, install modern signal : KP: Rail devices to improve operational characteristics along the IIP : 2,000 2,000 2,000 corridor. TOTAL: 2,000 2,000 2,000 75 ALA 2086 Caltrans - Emeryville Station and Track Improvements - In : PM: 106-0000-1381 the city of Emeryville, in the area of the existing passenger : KP: Rail rail station, extend siding track with associated signal and IIP : 10,000 10,000 10,000 other track improvements. TOTAL: 10,000 10,000 10,000 04 ALA 2100 073324 MTC - Planning, Programming and Monitoring - Planing, : PM: 106-0000-0109 Programing and Monitoring RIP : 07/20/06 651 1,103 110 113 113 113 113 993 110 KP: Local Assistance : TOTAL: 651 1,103 110 113 113 113 113 993 110 Page 2 07/13/07 10:55:15 2006 State Transportation Improvement Program Current Official STIP - (STIP funds, RIP and IIP, only) Alameda County Entire State PPNO / EA State Funds by Fiscal Year & Component (IIP & RIP Funds Only) CTIPS ID RESPONSIBLE AGENCY - PROJECT TITLE FUND PEND VOTE VOTED FUNDS PROG (Programmed Dollars in Thousands) DIST CO RTE ELEMENT LOCATION/DESCRIPTION SOURCE LAST DATE TOTAL AMOUNT 06/07 07/08 08/09 09/10 10/11 11/12 R/WCON PA&EDPS&E R/W ENG CON ENG 04 ALA 2100A MTC - AB 3090 Reimbursement - AB 3090 Reimbursement : PM: 106-0000-1038 RIP : 07/20/06 86 86 86 86 KP: Local Assistance : TOTAL: 86 86 86 86 04 ALA 2100C Alameda County Congestion Management Agency - TE : PM: 106-0000-1054 Reserve - TE Reserve RIP : 5,521 1,188 2,410 1,923 5,521 KP: Local Assistance : TOTAL: 5,521 1,188 2,410 1,923 5,521 04 ALA 2110 R738SA Union City, City of - Union City Intermodal Station - New : PM: 106-0000-0119 Union City intermodal facility (TCR# 141) RIP : 11/09/06 10,849 15,449 9,787 4,600 15,107 342 KP: Mass Transit : TOTAL: 10,849 15,449 9,787 4,600 15,107 342 04 ALA 2116B City of Oakland - MacArthur Transit Hub/village : PM: 106-0000-1399 Infrastructure-40th - This project includes construction RIP : 193 193 193 KP: Local Assistance funding to supplement already committed CMAQ funds for : croswalk improvements, a new traffic signal, a bike lane, TOTAL: 193 193 193 04 ALA 2179 073414 Alameda County Congestion Management Agency - : PM: 106-0000-0530 Planning, Programming and Monitoring - Planning, RIP : 11/09/06 621 3,760 111 1,311 1,409 209 210 3,760 KP: Local Assistance Programming and Monitoring : TOTAL: 621 3,760 111 1,311 1,409 209 210 3,760 75 ALA 2020 Emeryville, City of - Emeryville Intermodal Transfer Station : PM: 4.5/ 4.5 106-0000-0907 Parking - In Emeryville, at the Emeryille Amtrak Intercity Rail : KP: 7.2/ 7.2 Rail Station.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    161 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us