Southern Interconnection Croatia – Bosnia and Herzegovina

Southern Interconnection Croatia – Bosnia and Herzegovina

SOUTHERN INTERCONNECTION CROATIA – BOSNIA AND HERZEGOVINA (Zagvozd - Imotski (HR) – Posušje – Tomislavgrad – Novi Travnik with branch to Mostar (BiH)) CESEC Gas Plenary Meeting Brussels, 8 October 2019 SOUTHERN INTERCONNECTION HR - BOSNIA & HERZEGOVINA Project Promoters: BH-Gas Sarajevo, BiH/Plinacro Zagreb, HR -No connection between HR and BiH -3 planned interconnections, the most mature one is Southern Interconnection - connection to IAP project -DN 500/75 bar, L 187 km (239 km scenario without IAP); -Capacity up to 1,5 bcm/y -Planned commissioning 2024 -Project is of strategic importance for BiH; BiH depends on one entry point -Possibility of reverse flow -PMI project (PMI GAS 03), -TYNDP 2018, submitted for TYNDP 2020 -Next step: Open Season HR Source: CBA South Interconnection of BiH and Croatia ✔ Prefeasibility Study for South Interconnection of BiH and Croatia, October 2013, financed by WBIF ✔ CBA South Interconnection of BiH and Croatia, May 2018, financed by CONNECTA BH Section Status: TRA-N-851 Diameter/ Length: 500 mm / 75 bar / 165 km / bidirectional Entry/ Exit Capacity: 73 / 38 GWh/d CAPEX: approx. EUR 100 mil NDP adopted in Aug 2018: Framework Energy Strategy of BiH until 2035 PMI project (PMI GAS 03) Preliminary Design ongoing, started in Aug 2019, planned issuing Aug 2020 FS and ESIA, Grant approved, planned Nov 2019 – Aug 2020 Detailed Design, planned Jan 2021-Jan 2022 Planned Permitting Timeline: Environmental Permit Aug 2020 Location Permit Oct 2020 Building Permit Apr 2022 Commissioning: Oct 2024 - Provides diversification of sources and routes for BiH supply, currently depending on one source and route (Russia through Ukraine), currently N-1=0. Project connects the existing BiH with Croatian gas system and enables supply of BiH from SGC, LNG (Krk) and West European gas market. - Strategic importance of this project proclaimed by the Conclusion of the Government of the Federation of BiH in June 2018. Croatian section status (TRA-N-302) •Croatian section: Zagvozd-Imotski-HR/BiH border •DN 500/75 bar, L 22 km •Up to 1,5 bcm/y •ESIA ✔ •Basic Design ✔ •Location Permit ✔ •Detailed Design 2021 •Building Permit 2022 •Commissioning 2024 •CAPEX – EUR 16 mil Possible source of gas: - via existing interconnections HR-SLO and HR-HU - planned projects: LNG Krk and Ionian-Adriatic Pipeline IAP section Project is linked to the IAP Gaspipeline. In case that IAP implementation will be postponed, additional 54 km at the Croatian side sholud be constructed. Split (Dugopolje) – Zagvozd - DN 800/75 bar, L 52 km - EUR 48 million - ESIA, Basic Design, Location Permit, Detailed Design✔ -Building Permit: -1st phase Gas Node Dugopolje ✔ - 2nd phase pipeline Dugopolje-Zagvozd – in process of obtaining Croatian sections in total – EUR 64 million (74 km) To continue the project implementation it is necessary to obtain: - positive feedback from the Open Season procedure - an EU grant SOUTHERN INTERCONNECTION CROATIA – BOSNIA AND HERZEGOVINA Source: CBA South Interconnection of BiH and Croatia THANK YOU FOR YOUR ATTENTION!.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    7 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us