
M/s. FINE ENVIROTECH ENGINEERS FORM I-IA FORM 1 (I) BASIC INFORMATION:- Sr. Item Details No. 1. Name of the Project Proposed Group Housing Scheme at Gat Nos. 44(Pt.), 49(Pt.), 129(Pt.), 130/1/A (Pt.), 130/1/B, 130/2, 130/3(Pt.) & 130/4(Pt.) at Mahalunge, Tal: Khed, Dist. - Pune-1. 2. S. No. in the schedule 8 (b) as per EIA Notification 2006 and amended notification dated: 22nd December 2014. Copy of the same is enclosed as Annexure-I. 3. Proposed Area of plot–1, 11,825 sq.mt. capacity/area/length/tonnage to be Gross plot area – 96290.15 sq.mt. handled/command area/lease Please refer Annexure-II for Area statement. area/number of wells to be drilled. FSI area: 1, 50,472.60 sq.mt. Non FSI area: 52,077.52 sq.mt. Total Built up area: 2,02,550.12 sq.mt Please refer Annexure-III for Construction area statement. Residential Tenements: 2681 nos. Shops: 10 nos. Please refer Annexure-IV for building details and tenement statement. 4. New/Expansion/Modernization Amendment in Environmental Clearance Copy of Environmental Clearance dated: 18th July 2016 and dated: 17thOctober 2014. Copy of EC enclosed as Annexure-V. 5. Existing Capacity/Area etc. Area of plot – 1, 11,825 sq.mt. 6. Category of Project i.e., ‘A’ or ‘B’ B1 7. Does it attract general condition? If No yes, please specify. 8. Does it attract specific condition? If No Yes, please specify. 1 PROPOSED GROUP HOUSING SCHEME BY PUNE HOUSING & AREA DEVELOPMENT BOARD. M/s. FINE ENVIROTECH ENGINEERS FORM I-IA 9. Location Gat Nos. 44(Pt.) , 49(Pt.), 129(Pt.) , 130/1/A (Pt.), 130/1/B, 130/2, 130/3(Pt.) & 130/4(Pt.) at Mahalunge , Tal: Khed , Dist. - Pune-1. Google Image and Location plan of the project is enclosed as Annexure-VI. Plot/Survey No. Gat Nos. 44(Pt.) , 49(Pt.), 129(Pt.) , 130/1/A (Pt.), 130/1/B, 130/2, 130/3(Pt.) & 130/4(Pt.) Village Mahalunge Tehsil/Town Khed District Pune State Maharashtra. 10. Nearest Railway Station/Airport Nearest Railway Station : Chinchwad railway along with distance in kms. station (17 km) Nearest Airport: Pune Airport (34 km) 11. Nearest Town, City, District Pune Headquarters along with distance in kms . 12. Village Panchayats, Zillah Parishad, Mahalunge Grampanchayat Municipal Corporation, Local body Taluka – Khed (complete postal addresses with Dist.- Pune telephone nos. to be given) 13. Name of Applicant Pune Housing & Area Development Board, Pune 14. Registered Address Pune Housing & Area Development Board, Pune Grihanirmanbhavan, Agarkarnagar, Behind alankar theater, Pune-411001 15. Address for correspondence: Pune Housing & Area Development Board, Pune Grihanirmanbhavan, Agarkarnagar, Behind alankar theater, Pune-411001 2 PROPOSED GROUP HOUSING SCHEME BY PUNE HOUSING & AREA DEVELOPMENT BOARD. M/s. FINE ENVIROTECH ENGINEERS FORM I-IA Name N. N. Chintamani Designation Executive Engineer-I (Owner/Partner/CEO/Authorized Signatory) Address Pune Housing & Area Development Board, Pune Grihanirmanbhavan, Agarkarnagar, Behind Alankar theater, Pune. Pin Code 411001 Telephone No. 020-26128856 Fax No. 020-26123614 E-mail [email protected] [email protected] 16. Details of Alternate Sites examined, Not Applicable if any. Location of these sites should be shown on a top sheet 17. Interlinked Projects No 18. Whether separate application of No interlinked project has been submitted? 19. If yes, date of submission No 20. If no, reason No 21. Whether the proposal involves No approval/clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Not Applicable Act, 1980? (b) The Wildlife (Protection) Act, Not Applicable 1972? (c) The C.R.Z. Notification, Not Applicable 1991? 3 PROPOSED GROUP HOUSING SCHEME BY PUNE HOUSING & AREA DEVELOPMENT BOARD. M/s. FINE ENVIROTECH ENGINEERS FORM I-IA 22. Whether there is any Government No Order/Policy relevant/relating to the site? 23. Forest Land involved (hectares) No 24. Whether there is any litigation No pending against the product and/or land in which the project is propose to set up? (a) Name of the Court Not Applicable (b) Case. No. Not Applicable (c) Orders/Directions of the court, if Not Applicable any and its relevance with the proposed project. • Capacity corresponding to sectoral activity (such as production capacity for manufacturing, mining lease area and production capacity for mineral production, area for mineral exploration, length for linear transport infrastructure, generation capacity for power generation etc.,) (II) ACTIVITY:- 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Sr. No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities /rates, wherever possible) with source of information data 1.1 Permanent or temporary change in Yes Proposed development will be done as land use, land cover or topography per development plan of Govt. of including increase in intensity of Maharashtra. land use (with respect to local land use plan) 1.2 Clearance of existing land, No …. vegetation and buildings? 1.3 Creation of new land uses? Yes Residential buildings of EWS, LIG, MIG Type. Please refer Annexure-VII for Layout plan. 1.4 Pre-construction investigations Yes Soil report is attached as Annexure- e.g. bore houses, soil testing? VIII 4 PROPOSED GROUP HOUSING SCHEME BY PUNE HOUSING & AREA DEVELOPMENT BOARD. M/s. FINE ENVIROTECH ENGINEERS FORM I-IA 1.5 Construction works? Yes Construction work completed till date - 1,13,281.93 sq.mt. 1.6 Demolition works? No There is no demolition work involved. 1.7 Temporary sites used for Yes Temporary site provided for construction works or housing of construction worker at site. Temporary construction workers? toilet blocks & septic tank provided. 1.8 Above ground buildings, Yes The excavations reused for leveling and structures or Earthworks including other waste disposed off through linear structures, cut andfill or authorized contractor. Details of excavations? excavation and debris quantity along with disposal is attached as Annexure- IX 1.9 Underground works including No Not Applicable mining or tunneling? 1.10 Reclamation works? No Not Applicable 1.11 Dredging? No Not Applicable 1.12 Offshore structures? No Not Applicable 1.13 Production and manufacturing No Not Applicable processes? 1.14 Facilities for storage of goods or Yes During construction phase temporarily materials? storage of construction materials will be provided at project site with all guidelines adopted for the same. 1.15 Facilities for treatment or disposal Yes Solid waste: of solid waste or liquid effluents? Solid Waste Generated Biodegradable Waste:4348 kg/day Non biodegradable Waste: 2686 kg/day Total Solid waste: 7034 kg/day Solid Waste Disposal: Biodegradable waste will be processed in the OWC for manure gardening. The non Biodegradable waste will be handed over to authorised vendors. The sludge generated will be use as manure. Please refer Annexure-X for Solid waste management details. 5 PROPOSED GROUP HOUSING SCHEME BY PUNE HOUSING & AREA DEVELOPMENT BOARD. M/s. FINE ENVIROTECH ENGINEERS FORM I-IA Sewage: Total Sewage Generated: 1448 klpd Treatment and disposal: Sewage generated will be treated in sewage treatment plant based on MBBR Technology. STP Capacity: 1500 kld Please refer Annexure-XI for sewage treatment details. 1.16 Facilities for long term housing of No …. operational workers? 1.17 New road, rail or sea traffic No …. during construction or operation? 1.18 New road, rail, air waterborne or No …. other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No …. transport routes or infrastructure leading to changes in trafficmovements? 1.20 New or diverted transmission lines No …. or pipelines? 1.21 Impoundment, damming, No …. culverting, realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No …. 1.23 Abstraction or transfers of water No …. form ground or surface waters? 1.24 Changes in water bodies or the No …. land surface affecting drainage or run-off? 1.25 Transport of personnel or Yes Project will be developed while materials for construction, adopting the best available and operation or decommissioning? environmentally sustainable technology 6 PROPOSED GROUP HOUSING SCHEME BY PUNE HOUSING & AREA DEVELOPMENT BOARD. M/s. FINE ENVIROTECH ENGINEERS FORM I-IA and usage of raw materials with appropriate specifications. Also there will be transport of construction materials. The existing road near by the site will be utilized for the transportation of material and personal. Proper mitigative measures shall be taken so as to reduce any kind of impact generated by the same. 1.26 Long-term dismantling or No …. decommissioning or restoration works? 1.27 Ongoing activity during No …. decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in Yes Construction Phase either temporarily or permanently? During the construction phase about 300 persons will be deployed on the. Influx of these people will be temporary in nature. Operation Phase On completion of the project, residents will occupy their property. Total population is expected to be 13405 nos. of residents and 30 nos. of shop users. 1.29 Introduction of alien species? No …. 1.30 Loss of native species or genetic No …. diversity? 1.31 Any other actions? No …. 7 PROPOSED GROUP HOUSING SCHEME BY PUNE HOUSING & AREA DEVELOPMENT BOARD. M/s. FINE ENVIROTECH ENGINEERS FORM I-IA 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): Sr.No. Information/checklist Yes/No Details thereof (with approximate confirmation quantities /rates, wherever possible) with source of information data 2.1 Land especially undeveloped or No ….
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages64 Page
-
File Size-