RP989 V3 Shayinghe River Channel Improvement Project Public Disclosure Authorized Resettlement Action Plan Yingshang 2nd Ship Lock Public Disclosure Authorized Public Disclosure Authorized Institute of Resettlement of Anhui Communications Vocational & Technical College Anhui Jiaoyuan Project Management Co., Ltd Public Disclosure Authorized December 2014 1 Contents 1 Overview ............................................................................................................. 1 1.1 Background and Description .......................................................................... 1 1.1.1 Background ............................................................................................. 1 1.1.2 Composition of the project and identification of displaced persons ................. 2 1.1.3 Summary of resettlement impacts of the project ........................................... 3 1.2 Social and economic benefits ......................................................................... 4 1.3 Investment estimate and implementation plan of resettlement ............................ 4 2 Impacts of the Project ............................................................................................ 5 2.1 Measures to avoid or minimize land acquisition and house Demolition ............... 5 2.2 Range of survey of land acquisition and house demolition impacts ..................... 5 2.3 Methods and process of survey ...................................................................... 6 2.4 Permanent acquisition of state-owned land and impact analysis.......................... 7 2.5 Temporary land occupation ............................................................................ 7 2.6 Affiliated house demolition in rural area ......................................................... 8 2.7 Affected population ...................................................................................... 8 2.8 Affected vulnerable groups ............................................................................ 8 2.9 Affected ethnic minorities ............................................................................. 8 2.10 Residents travel plan ..................................................................................... 8 3 Socioeconomic Overview of the Affected Areas ..................................................... 10 3.1 Socioeconomic profile of affected areas ........................................................ 10 3.1.1 Socioeconomic background of Fuyang Municipality ................................... 10 3.1.2 Socioeconomic overview of the affected counties ....................................... 10 3.1.3 Socioeconomic profile of affected villages(community) ............................... 11 3.2 Social and economic profile of affected population .......................................... 11 3.2.1 Ethnic and female population analysis ........................................................ 11 3.2.2 Demography ............................................. Error! Bookmark not defined. 2 3.2.3 Education .............................................................................................. 12 3.2.4 Housing area .......................................................................................... 12 3.2.5 Arable land ............................................................................................ 12 3.2.6 Household properties .............................................................................. 12 3.2.7 Household income and expenditure .......................................................... 12 3.2.8 Willingness for resettlement ..................................................................... 13 3.2.9 Suggestion for resettlement ...................................................................... 13 3.3 Gender survey and analysis ......................................................................... 15 3.3.1 Overview ............................................................................................... 15 3.3.2 Income analysis ...................................................................................... 15 3.3.3 Education .............................................................................................. 15 3.3.4 Career structure ...................................................................................... 16 3.3.5 Willingness ............................................................................................ 16 3.4 Summary ................................................................................................ 16 4 Legal Framework and Policy Objectives ................................................................ 18 4.1 Legal and policy provisions applicable to resettlement .................................... 18 4.2 World Bank policy on involuntary resettlement .............................................. 19 4.3 Relevant provisions of the Land Administration Law of the PRC ..................... 20 4.4 Main differences between World Bank policies and laws of the PRC ................ 31 4.5 Resettlement policies of the Project .............................................................. 32 4.5.1 Policy for permanent acquisition of state-owned land .................................. 32 4.5.2 Compensation and restoration policies for temporary land occupation ........... 32 4.5.3 Compensation policy for vulnerable groups ............................................... 33 4.5.4 Compensation policy for affected infrastructure and ground attachments ....... 33 4.6 Compensation rates .................................................................................... 33 4.6.1 Compensation rates for acquisition of state-owned land............................... 33 4.6.2 Compensation rates for temporary land occupation ..................................... 34 3 4.6.3 Other costs............................................................................................. 34 4.6.4 Vulnerable groups ................................................................................... 35 5 Resettlement and Income Restoration .................................................................... 36 5.1 Purpose of resettlement ............................................................................... 36 5.2 Principles of restoration plan ....................................................................... 36 5.3 Restoration plan ......................................................................................... 36 5.3.1 Resettlement and restoration plans for affected villages ............................... 36 5.3.2 Restoration plan of mildly affected community .......................................... 37 5.4 Restoration program for temporarily occupied land ........................................ 37 5.5 Restoration plan for infrastructure ................................................................ 37 6 Public Participation, Complaints and Appeals......................................................... 38 6.1 Public Participation .................................................................................... 38 6.1.1 Participation at the preparation stage ......................................................... 38 6.1.2 Public participation process and policy disclosure plan................................ 40 6.2 Complaints and appeals ............................................................................... 40 7 Resettlement costs and sources of funds ................................................................ 42 7.1 Budget ...................................................................................................... 42 7.2 Management and disbursement plan of resettlement funds ............................... 42 4 Figure Directory No. Name Page Figure1-1 Location of Yingshang 2nd ship lock project 2 Figure2-1 Affected state-owned infrastructures 5 Figure2-2 Temporary Spoil Disposal area 5 Figure2-3 Motor vehicle travel plan 9 1 Table Directory No. Name Page Table1-1 Identification of Scope of Construction and Resettlement Impacts 2 Table1-2 Effects of resettlement 3 Table2-1 Summary of Affected Population in Temporary Land Occupation 8 Table3-1 Social and economic profile of affected villages(community) (2013) 11 Table3-2 Public Opinion Survey 14 Table3-3 Gender income statistics 15 Table3-4 Education statistics 15 Table3-5 Career structure statistics 16 Table4-1 Compensation Standards for Collective Land Acquisition 33 Table4-2 Compensation rates for other costs 33 Table6-1 Public consultation at the preparation stage 37 Table6-2 Public participation process and policy disclosure plan 38 Table6-3 Contact information of appealing receiver 40 2 1 Overview 1.1 Background and Description 1.1.1 Background Yingshang 2nd ship lock is the last one in Shaying River, which was built and put into use in 2008. It is a level IV (500t) ship lock with freight volume of 6 million tons, and the scale of construction is 180×12×3m (length*width*depth). Both upstream and downstream channel was man-made. Straight width of the channel is 35m, curve width is 47m, minimum turning radius is 350m, the length of upstream channel is 1318.89m, and elevation is 16.4m, the length of downstream channel is 1821.94m, and elevation is 14.5m. The Project is to be built by Grade IV navigation channel standards, with a design tonnage of 500t (up to 1,000t) and a maximum annual unidirectional navigation tonnage of 12 million tons. The lock chamber has a dimension of 200×23×4.0m (Length*Width*Water
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages48 Page
-
File Size-