Avonmouth and Severnside Integrated Development, Infrastructure, And

Avonmouth and Severnside Integrated Development, Infrastructure, And

Bristol City and South Gloucestershire Councils AVONMOUTH AND SEVERNSIDE INTEGRATED DEVELOPMENT, INFRASTRUCTURE AND FLOOD RISK MANAGEMENT STUDY February 2012 Address: Ropemaker Court, 12 Lower Park row, Bristol, BS1 5BN Tel: 01179 254 393 Email: [email protected] www.wyg.com creative minds safe hands Document Control Project: A066776 Client: SWRDA, Bristol City Council and South Gloucestershire Council Job Number: A066776 File Origin: X: \Projects \A0 60000 -\A066776 - Avonmouth Infrastructure Study \Final Report \April 2012 \A066776 wyg report final feb 2012.doc Document Checking: Prepared by: AS Signed: AS Checked by: ND Signed: ND Verified by: ND Signed: ND Issue Date Status 1 3rd October 2011 Draft 2 22 nd December 2011 Revised Draft 3 10 th February 2011 Final Draft 4 24 th April 2012 Final Issue www.wyg.com creative minds safe hands Contents Page Executive Summary…………………………………………………………………………………………………………………1 1.0 Introduction .......................................................................................................................4 1.1 The Opportunity.........................................................................................................................4 1.2 WYG .........................................................................................................................................4 1.3 Location ....................................................................................................................................5 1.4 Infrastructure ............................................................................................................................5 1.5 Challenges.................................................................................................................................6 1.6 Constraining Influence of Environmental Factors..........................................................................7 1.7 The Brief ...................................................................................................................................7 1.8 Strategic Flood Risk Assessment – Level 2 (SFRA 2) .....................................................................9 1.9 Severnside and Avonmouth Wetland Habitat Project ....................................................................9 1.10 Methodology............................................................................................................................10 1.11 Structure of Report ..................................................................................................................10 1.12 Costs.......................................................................................................................................10 1.13 Land Ownership.......................................................................................................................11 1.14 Consultation ............................................................................................................................11 1.15 Technical Reports.....................................................................................................................12 1.16 District Heating ........................................................................................................................12 2.0 Planning History ...............................................................................................................13 2.2 Avonmouth..............................................................................................................................13 2.3 Severnside – the 1957/58 Permissions.......................................................................................13 2.4 Western Approach Phase 1 (WAP 1) Development .....................................................................14 3.0 Planning Policy Context....................................................................................................18 3.1 The Development Plan .............................................................................................................18 3.2 Policy Changes.........................................................................................................................18 3.3 Implications of Change.............................................................................................................19 3.4 RPG10.....................................................................................................................................19 3.5 Joint Waste Core Strategy (JWSC).............................................................................................19 3.6 Joint Replacement Structure Plan..............................................................................................20 3.7 South Gloucestershire Local Plan...............................................................................................21 3.8 South Gloucestershire Core Strategy .........................................................................................23 3.9 Bristol Local Plan......................................................................................................................26 www.wyg.com creative minds safe hands M49 Junction............................................................................................................................... 27 3.10 Bristol Core Strategy ................................................................................................................29 3.11 Site Allocations Development Plan Documents (DPD) .................................................................29 3.12 Community Infrastructure Levy (CIL) ........................................................................................30 3.13 Bristol Employment Land Review...............................................................................................30 3.14 South Gloucestershire Employment Land Review........................................................................31 3.15 South Gloucestershire Local Economic Assessment (LEA)............................................................31 3.16 Conclusions .............................................................................................................................31 4.0 Control of Major Accident Hazards (COMAH) ...................................................................32 4.1 Context ...................................................................................................................................32 4.2 Implications for the Study Area.................................................................................................33 4.3 Transport Infrastructure ...........................................................................................................33 4.4 National Grid’s Liquified Natural Gas (LNG) Storage Facility at Avonmouth...................................33 4.5 Risks .......................................................................................................................................34 4.6 Conclusions .............................................................................................................................35 5.0 Statutory Undertakers Services........................................................................................36 5.1 Context ...................................................................................................................................36 5.2 Overhead Power Lines..............................................................................................................36 5.3 Pipelines..................................................................................................................................36 5.4 Wessex Water Proposals...........................................................................................................37 5.5 National Grid Proposals.............................................................................................................38 5.6 Risks .......................................................................................................................................39 5.7 Conclusions .............................................................................................................................40 6.0 Contamination ..................................................................................................................41 6.1 Context ...................................................................................................................................41 6.2 Implications for the Study Area.................................................................................................41 6.3 Costs.......................................................................................................................................41 6.4 Risks .......................................................................................................................................42 6.5 Conclusions .............................................................................................................................42 7.0 Green Infrastructure (GI).................................................................................................43 7.1 Context ...................................................................................................................................43 7.2 Implications for the Study Area.................................................................................................45

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    114 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us