*OFFICIAL USE ONLY Environment Impact Assessment (EIA) October 2020 Chennai Peripheral Ring Road Project Section 2 & 3 Highways Department (Government of Tamil Nadu) *OFFICIAL USE ONLY TABLE OF CONTENTS EXECUTIVE SUMMARY ........................................................................................ 1 1. INTRODUCTION ........................................................................................... 7 1.1 Project Rationale .................................................................................. 7 1.2 Objectives of the Project ......................................................................... 7 1.3 Project Status ...................................................................................... 8 1.4 Purpose of Environmental Impact Assessment (EIA) .......................................... 9 1.5 Structure of EIA Document ...................................................................... 11 2. PROJECT DESCRIPTION ................................................................................ 13 2.1 CPRR Section 2 (Thatchur on NH 16 to Start of Thiruvallur Bypass) ...................... 13 2.2 CPRR Section 3 (Start of Thiruvallur Bypass to Sriperumbudur on NH 48) ............... 15 2.3 Analysis of Alternatives .......................................................................... 19 2.4 Engineering Surveys and Investigations ....................................................... 23 2.5 Traffic Study ....................................................................................... 25 2.6 Proposed Design Interventions (common for Section 2 and 3) ............................. 26 3. LEGAL POLICY FRAMEWORK ......................................................................... 34 3.1 National and State Rules and Regulations .................................................... 34 3.2 AIIB Policy .......................................................................................... 37 3.3 Environmental Regulatory Clearance Requirements ........................................ 38 3.4 International Treaties/Conventions/Declarations on Environment Management ....... 44 4. DESCRIPTION OF THE ENVIRONMENT ............................................................... 46 4.1 Physical Environment ............................................................................. 46 4.2 Biological Environment ........................................................................... 55 4.3 Socio-Economic Environment ................................................................... 61 5. GRIEVANCE REDRESS MECHANISM ................................................................... 66 5.1 Composition Function of Grievance Redressal Committee (GRC) ......................... 66 5.2 Approach to GRC .................................................................................. 66 6. ANALYSIS OF POTENTIAL ENVIRONMENTAL IMPACT AND MITIGATION MEASURE .......... 68 6.1 Assessment of Environmental Impacts ......................................................... 68 6.2 Pre – Construction Impacts and Mitigation Measures ........................................ 70 6.3 Anticipated Impacts during Construction Phase and Mitigation Measures ............... 74 6.4 Labour Influx Management ...................................................................... 85 6.5 Post – Construction Impacts and Mitigation Measures ....................................... 89 7. STAKEHOLDER CONSULTATION AND INFORMATION DISCLOSURE ............................. 95 7.1 Process for Consultation followed .............................................................. 95 7.2 Plan and Continual Public Participation ....................................................... 97 7.3 AIIB Information Disclosure Requirements .................................................... 97 8. ENVIRONMENTAL MANAGEMENT PLAN ............................................................. 99 8.1 EMP Table .......................................................................................... 99 8.2 Summary of Site and Activity Specific Plan as per EMP ..................................... 99 8.3 Responsibilities for EMP Implementation ................................................... 133 8.4 Environmental Monitoring Program .......................................................... 134 8.5 Capacity Building ............................................................................... 142 8.6 EMP Budget ...................................................................................... 143 8.7 EMP and EMoP in Bid Documents ............................................................. 143 9. CONCLUSION ........................................................................................... 146 i *OFFICIAL USE ONLY LIST OF FIGURES Figure 1: Proposed CPRR alignment ................................................................. 8 Figure 2: Section 2 Alignment Map .................................................................. 13 Figure 3: Land Use Map Along with Major Bridge Locations in the Section 2 ................. 14 Figure 4: Section 3 Alignment Map .................................................................. 15 Figure 5: Land Use Map Along with Major Bridge Locations in the Section 3 ................. 16 Figure 6: Alternative alignment study for section 2 .............................................. 19 Figure 7: Alternative alignment study for section 3 .............................................. 19 Figure 8: Proposed Cross section for Section 2 and Section 3 .................................. 27 Figure 9: Vehicular Underpass proposed at km 50/908 .......................................... 27 Figure 10: CD Structure (Box Culvert) Proposed at km 34/133 ................................. 28 Figure 11: Major Bridge proposed at km 29/200 .................................................. 28 Figure 12: Minor Bridge proposed at km 30/750 .................................................. 29 Figure 13: Interchange proposed in NH 716 (54/400) ............................................ 30 Figure 14: Interchange proposed in NH 48 (km 76/900) ......................................... 30 Figure 15: Environmental Clearance Procedures ................................................. 39 Figure 16: Elevation Profile in Section 2 ........................................................... 46 Figure 17: Elevation Profile in Section 3 ........................................................... 46 Figure 18: Earthquake Hazard Map ................................................................. 47 Figure 19: Mannur Reserve Forest (the area to be diverted ) ................................... 57 Figure 20: Presence of Pulicate Bird Sanctuary ................................................... 58 Figure 21: Grievance Redressal Committee for CPRR ............................................ 67 Figure 22: A-Weighted Vehicle Noise Emission Levels ........................................... 91 Figure 23: Implementation Arrangement for EMP .............................................. 133 LIST OF TABLES Table 1: Various sections under Chennai Peripheral Ring Road .......................................................... 7 Table 2: Comparison of Positive and Negative Impacts of ‘With’ and ‘Without’ Project Scenario ..................................................................................................................................................................... 20 Table 3: Field Survey and Investigation ....................................................................................................... 24 Table 4: Minor Bridges in Section 2 and Section 3 .................................................................................. 28 Table 5: Proposed Road Safety Measures .................................................................................................... 31 Table 6: Applicable Acts, Rules and Regulation ....................................................................................... 34 Table 7: Environmental Clearance/ NOC/Permission for the Contractor ....................................... 39 Table 8: National Drinking Water Quality Standards and WHO Guidelines ................................... 43 Table 9: International Treaties/ Conventions/ Declarations on Environment ............................. 44 Table 10: Ambient Air and Noise Quality Sampling Locations ............................................................ 49 Table 11: Ambient Air Quality Monitoring Results .................................................................................. 49 Table 12: Ambient Noise Level Monitoring Results ................................................................................. 50 Table 13: Surface water bodies along sections 2 and 3 ........................................................................ 51 Table 14: Water Quality Sampling Locations ............................................................................................. 52 Table 15: Surface Water Quality Results ..................................................................................................... 53 Table 16: Groundwater Quality Results ....................................................................................................... 54 Table 17: Forest Cover in Project Districts (units in Sq.km) .............................................................. 55 Table 18: Details of the Tree Species in the Project Area .................................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    234 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us