Elite Portico Arch Inst 8/7/11 10:49 Page 1

Elite Portico Arch Inst 8/7/11 10:49 Page 1

Elite Portico Arch Inst 8/7/11 10:49 Page 1 ELITE ALL PRODUCTS ARE MEASURED TO THE HIGHEST AND WIDEST POINT AND ALL SIZES ARE APPROXIMATE PLEASE SEE OVERLEAF FOR ASSEMBLY INSTRUCTIONS PORTICO PLAN ARCH 2.1m 1.3m to 1.9m Width of opening can be adjusted to suit your needs. 1.126m 2.43m ELITE PORTICO ARCH (ELITEPORTE) E T R O P E T I GRANGE FENCING LIMITED L E : Halesfield 21, Telford TF7 4PA e d Tel: 01952 588088 Fax: 01952 581522 o C Email: [email protected] Web: www.grangefen.co.uk e g OUT OF HOURS MESSAGE SERVICE: 01952 588088 n a r JULY 2011 ISSUE 2 G Elite Portico Arch Inst 8/7/11 10:49 Page 2 ELITE PORTICO ARCH ASSEMBLY INSTRUCTIONS PARTS SUPPLIED Ref. Description Qty. A SIDE 2 SECTION 1x HARDWARE PACK: B CURVED 2 BEAM x 4 x 50 14 C ROOF 7 RAFTER y 4 x 60 8 TOOLS REQUIRED (not supplied) POZIDRIVE SCREWDRIVER - ELECTRIC DRILL BEFORE YOU START SITE PREPARATION • Check the pack/s and make sure that you have Excavate a 300mm square hole all of the parts listed above. If not, contact (approx) for each post to a depth your retailer who will be able to help you. of at least 300mm. (Fig.A right) • When you are ready to start, make sure you We would recommend that you m m use MetCrete, fast set post 0 have the right tools to hand, plenty of space 0 and a clean, dry area for assembly. fixing concrete to fix your posts. 3 • It is advisable for two people to carry out Easy to use, it sets in just the work. 10 minutes. Fig A. ASSEMBLY 1. Begin with the roof assembly. 5. Repeat for the 2nd side section. 2. Mark off seven points along the length of each 6. Ensure the of the curved beams where the rafters will be arch is fitted (see Fig.1). It is recommended that the equally centre is marked first and the other points spaced, measured from it. level and vertical C 1 (see Fig.3) = 7. Fill in the B holes using = MetCrete x = or other preferred Fig 1. filling. B Ensure the arch = 3. Fix the rafters to the curved hasn’t beams using screws (x) from moved the topside of the rafters y B during y into the curved beam. infill. 4. Lower one of the side sections into the Fig 3. prepared holes. Fix the roof assembly to the side section using A screws ( y) through the AFTERCARE post into the roof assembly. Use two To ensure longevity of your structure it is screws at each point recommended that it is treated with a wood (see Fig.2). Fig 2. preservative on a yearly basis..

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us