Gurgaon Limited from Sikanderpur to Sector-56

Gurgaon Limited from Sikanderpur to Sector-56

Detailed Project Report for the South Extension of Rapid MetroRail Gurgaon Limited from Sikanderpur to Sector-56. Updated Detailed Project Report (South Extension) Main Report March 2014 Detailed Project Report (South Extension) Main Report Halcrow Consulting India Pvt. Ltd. A CH2M Hill Company MARCH – 2013 Detailed Project Report for the South Extension of Rapid MetroRail Gurgaon Limited from Sikanderpur to Sector-56. Updated Detailed Project Report (South Extension) Main Report March – 2014 Halcrow Consulting India Pvt. Ltd. A CH2M Hill Company Halcrow Consulting India Private Limited A CH2M Hill Company B-1D, Sector – 10 Noida 201 301 Uttar Pradesh Tel +91 (120) 4682 500 / 4098 900 Fax +91 (120) 4682 534 w w w .halcrow .com Halcrow has prepared this report in accordance w ith the instructions of their client IL & FS Rail Ltd. for their sole and specific use. Any other persons w ho use any information contained herein do so at their ow n risk. © Halcrow Consulting India Private Limited 2014 A CH2M Hill Company Detailed Project Report for the South Extension of Rapid MetroRail Gurgaon Limited from Sikanderpur to Sector-56. Updated Detailed Project Report (South Extension) Main Report Contents Amendment Record This report has been issued and amended as follows: Issue Revision Description Date Prepared by Checked by Issued by Draft Detailed Sumana Ashok Rajesh 1 V0 14.12.12 Project Report Biswas Saxena Chaabra Detailed Sumana Ashok Rajesh 2 V1 31.12.12 Project Report Biswas Saxena Chaabra Detailed Sumana Ashok Rajesh 3 V2 06.12.13 Project Report Biswas Saxena Chaabra Detailed Archana Ajay Kumar Ashok 4 V3 06.03.14 Project Report Bhanga Sharma Saxena Detailed Archana Ajay Kumar Ashok 5 V4 14.03.14 Project Report Bhanga Sharma Saxena TABLE OF CONTENTS 1 INTRODUCTION .................................................................................................................9 1.1 GENERAL.................................................................................................................9 2 REORGANISATION AND RELOCATION OF STATIONS ................................................................11 2.1 SECTOR 42 CROSSING STATION DIRECTLY COMING OVER PROPOSED UNDERPASS: ...............11 2.2 CHANGING LOCATION OF SECTOR 42 CROSSING STATION AT A NEARBY LOCATION NOT FEASIBLE .................................................................................................................11 2.3 EXPECTED OBJECTIONS FROM NEARBY RESIDENTIAL LOCALITY .........................................11 3 PROJECT APPRECIATION .....................................................................................................12 3.1 INTRODUCTION ........................................................................................................12 3.2 PROJECT LOCATION ..................................................................................................12 3.3 SALIENT FEATURES ALONG THE PROJECT ROAD .............................................................15 4 TRAFFIC FORECAST ............................................................................................................16 4.1 INTRODUCTION ........................................................................................................16 4.2 GURGAON TRANSPORT SYSTEM ..................................................................................16 4.3 DATABASE DEVELOPMENT..........................................................................................19 4.4 RIDERSHIP ESTIMATION .............................................................................................21 4.5 PLANNING PARAMETERS ...........................................................................................22 4.6 FORECAST RIDERSHIP ................................................................................................24 4.7 SENSITIVITY ANALYSIS ...............................................................................................28 5 SYSTEM SELECTION ............................................................................................................30 5.1 SELECTION OF TECHNOLOGY.......................................................................................30 5.2 SELECTION OF GAUGE ...............................................................................................30 5.3 TRACK STRUCTURE ....................................................................................................31 5.4 ROLLING STOCK .......................................................................................................34 5.5 POWER SUPPLY ........................................................................................................35 5.6 SIGNALLING & TRAIN CONTROL SYSTEM .......................................................................36 5.7 TELECOMMUNICATION ..............................................................................................37 5.8 FARE COLLECTION SYSTEM .........................................................................................37 6 CIVIL ENGINEERING ............................................................................................................39 6.1 GENERAL.................................................................................................................39 6.2 GEOMETRIC DESIGN NORMS ......................................................................................39 6.3 DESCRIPTION OF PROJECT CORRIDOR...........................................................................41 6.4 TOPOGRAPHICAL SURVEY...........................................................................................43 6.5 TECHNICAL FEATURES ...............................................................................................43 6.6 RAIL LEVELS AND ALIGNMENT .....................................................................................47 6.7 SEQUENCE OF STATIONS ............................................................................................48 6.8 GEOTECHNICAL INVESTIGATIONS .................................................................................48 6.9 VIADUCT .................................................................................................................48 6.10 STATION PLANNING AND DESIGN ................................................................................51 6.11 STATION DESIGN PHILOSOPHY ....................................................................................52 6.12 STATION DESIGN CONSIDERATIONS .............................................................................53 6.13 TYPICAL ELEVATED STATION .......................................................................................59 6.14 UTILITIES .................................................................................................................61 6.15 LAND REQUIREMENT FOR PROJECT CORRIDOR ..............................................................64 7 ROLLING STOCK ................................................................................................................65 7.1 INTRODUCTION ........................................................................................................65 7.2 TRAIN CONFIGURATION & CAR DIMENSIONS .................................................................66 7.3 OPERATIONAL SPECIFICATIONS OF ROLLING STOCK ........................................................67 7.4 DESIGN CONSIDERATIONS ..........................................................................................68 7.5 TECHNOLOGY SELECTION ...........................................................................................69 7.6 COMPATIBILITY WITH EXISTING FLEET ..........................................................................75 8 POWER SUPPLY ARRANGEMENTS .........................................................................................77 8.1 INTRODUCTION ........................................................................................................77 8.2 CONSIDERATIONS FOR SELECTION OF TRACTION POWER.................................................77 8.3 TYPES OF TRACTION SYSTEMS .....................................................................................77 8.4 TRACTION SYSTEM FOR THE SOUTH EXTENSION .............................................................78 8.5 RELIABILITY OF POWER SUPPLY ...................................................................................79 8.6 POWER SUPPLY SYSTEM ............................................................................................79 8.7 POWER REQUIREMENT ..............................................................................................82 8.8 POWER SYSTEM DETAILS............................................................................................82 8.9 COMPATIBILITY WITH THE PHASE I SYSTEM ...................................................................88 9 SIGNALLING AND TELECOMMUNICATION ..............................................................................89 9.1 SIGNALLING .............................................................................................................89 9.2 COMMUNICATION ....................................................................................................92 9.3 AUTOMATIC FARE COLLECTION SYSTEM .......................................................................96 10 TRAIN OPERATION PLAN ....................................................................................................100 10.1 INTRODUCTION ........................................................................................................100

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    236 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us