Toronto Subway System, ON

Toronto Subway System, ON

Canadian Geotechnical Society Canadian Geotechnical Achievements 2017 Toronto Subway System Geotechnical Investigation and Design of Tunnels Geographical location Key References Wong, JW. 1981. Geotechnical/ Toronto, Ontario geological aspects of the Toronto subway system. Toronto Transit Commission. When it began or was completed Walters, DL, Main, A, Palmer, S, Construction began in 1949 and continues today. Westland, J, and Bihendi, H. 2011. Managing subsurface risk for Toronto- York Spadina Subway extension project. Why a Canadian geotechnical achievement? 2011 Pan-Am and CGS Geotechnical Conference. Construction of the Toronto Transit Commission (TTC) subway system, the first in Canada, began in 1949 and currently consists Photograph and Map of four subway lines. In total there are currently approximately 68 km of subway tracks and 69 stations. Over one million trips are taken daily on the TTC during weekdays. The subway system has been expanded in several stages, from 1954, when the first line (the Yonge Line) was opened, to 2002, when the most recently completed line (the Sheppard Line) was opened. Currently the Toronto-York Spadina Subway Extension is under construction. The subway tunnels have been constructed using a number of different technologies over the years including: open cut excavation, open/closed shield tunneling under ambient air pressure and compressed air, hand mining and earth pressurized tunnel boring machines. The subway tunnels range in design from reinforced concrete box structures to approximately 6 m diameter precast concrete segmental liners or cast iron segmental liners. Looking east inside newly constructed TTC subway The tunnels have been advanced through various geological tunnel, 1968. (City of Toronto Archives) formations: from hard glacial tills to saturated alluvial sands and silts, and from glaciolacustrine clays to shale bedrock. Extensive geotechnical investigations and insitu and laboratory testing have been carried out to characterize these deposits, with hundreds of laboratory triaxial tests and over a thousand pressuremeter tests completed. Submitted by Andrew Drevininkas (Toronto Transit Commission and Chair of the CGS Southern Ontario Section) Current TTC Subway System Map. (Courtesy TTC). .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us