Limerick Northern Distributor Road Draft Constraints Study: Volume 1

Limerick Northern Distributor Road Draft Constraints Study: Volume 1

Limerick Northern Distributor Road Constraints Study Volume 1 - Main Text Draft Work In Progress - January 2011 Roughan & O‟Donovan Clare County Council Consulting Engineers Limerick Northern Distributor Road Clare County Council Limerick Northern Distributor Road Constraints Study Draft – Work In Progress Document No: ................. CSR/001 Made: ................................ Andrew Warwick/Lewis Feely Checked ........................... Michael Conroy Approved ......................... Richard Power Ref: 10.194.10 – Constraints Study Draft - January 2011 (W.I.P) Page i Roughan & O‟Donovan Clare County Council Consulting Engineers Limerick Northern Distributor Road Clare County Council Limerick Northern Distributor Road Constraints Study Table of Contents 1.0 INTRODUCTION ........................................................................................................ 1 1.1 Need for the Scheme .............................................................................................. 1 1.2 Strategic and Local Policy Context .......................................................................... 3 1.2.1 The National Spatial Strategy (NSS) ................................................................ 3 1.2.2 The National Development Plan, 2007 – 2013 ................................................. 3 1.2.3 Regional Planning Guidelines 2010-2022 ........................................................ 4 1.2.4 County and Local Development Plans ............................................................. 4 1.2.5 Plans and Programmes of the National Roads Authority (NRA) ....................... 5 1.3 Scheme Development ............................................................................................. 5 1.4 Format of the Constraints Study .............................................................................. 6 1.5 Difficulties Encountered ........................................................................................... 6 2.0 DEVELOPMENT OF THE STUDY AREA .................................................................. 7 2.1 Introduction ............................................................................................................. 7 2.2 Defining the Study Area ........................................................................................... 7 2.2.1 Land Use Constraints ...................................................................................... 7 2.2.2 Ecological Constraints ..................................................................................... 8 2.2.3 Engineering ..................................................................................................... 8 2.2.4 Archaeology ..................................................................................................... 9 2.2.5 Purpose of the Scheme ................................................................................. 10 3.0 PUBLIC CONSULTATION ....................................................................................... 11 3.1 Details of Publicity Information .............................................................................. 11 3.3.1 Briefing .......................................................................................................... 11 3.3.2 Newspaper Advertisements ........................................................................... 11 3.3.3 Radio Advertisements .................................................................................... 11 3.3.4 Web Advertisements ...................................................................................... 11 3.3.5 Publicity Information Leaflets ......................................................................... 11 3.4 Responses to the Publicity Information .................................................................. 12 3.4.1 Public Submissions ........................................................................................ 12 4.0 ENGINEERING AND TOPOGRAPHY ..................................................................... 14 4.1 Geographical Description ...................................................................................... 14 4.2 Flooding and Drainage .......................................................................................... 15 4.3 Existing & Future Road Network ............................................................................ 16 4.3.1 Existing Road Network ................................................................................... 16 4.3.2 Future Road Network ..................................................................................... 17 4.3.3 Railways ........................................................................................................ 17 4.4 Watercourse Crossings ......................................................................................... 18 4.4.1 River Shannon Crossings .............................................................................. 18 4.4.2 Headrace Canal Crossing .............................................................................. 19 4.4.3 Tailrace Canal Crossing ................................................................................. 20 4.4.4 River Blackwater Crossing ............................................................................. 21 4.4.5 Errina Canal Crossing .................................................................................... 21 4.5 Existing Services ................................................................................................... 22 Ref: 10.194.10 – Constraints Study Draft - January 2011 (W.I.P) Page ii Roughan & O‟Donovan Clare County Council Consulting Engineers Limerick Northern Distributor Road 5.0 TRAFFIC AND ROAD ACCIDENTS ........................................................................ 23 5.1 Introduction ........................................................................................................... 23 5.2 Existing Traffic Data and Reports .......................................................................... 23 5.2.1 Proposed Coonagh to Knockalisheen Distributor Road .................................. 23 5.2.2 Mid West Strategic Model .............................................................................. 23 5.3 Traffic Accidents .................................................................................................... 24 6.0 GEOLOGY, HYDROLOGY & HYDROGEOLOGY ................................................... 25 6.1 Soils and Geology ................................................................................................. 25 6.1.1 Introduction .................................................................................................... 25 6.1.2 Methodology .................................................................................................. 25 6.1.3 Sources of Information ................................................................................... 25 6.1.4 Geomorphology ............................................................................................. 25 6.1.5 Solid Geology ................................................................................................ 25 6.1.6 Subsoil and Soil Deposits .............................................................................. 27 6.1.7 Economic Geology ......................................................................................... 30 6.1.8 Geological Heritage ....................................................................................... 31 6.1.9 Landslides ..................................................................................................... 31 6.1.10 Inventory Geological Constraints ................................................................... 31 6.1.11 Sources of information & References ............................................................. 31 6.2 Hydrology .............................................................................................................. 32 6.2.1 Introduction .................................................................................................... 32 6.2.2 Methodology .................................................................................................. 32 6.2.3 Existing Hydrological Regime ........................................................................ 32 6.2.4 Surface Water Features & Flooding ............................................................... 33 6.2.5 Tidal Constraints ............................................................................................ 34 6.2.6 Ardnacrusha Power Station ........................................................................... 34 6.2.7 Catchments ................................................................................................... 35 6.3 Hydrogeology ........................................................................................................ 36 6.3.1 Introduction .................................................................................................... 36 6.3.2 Methodology .................................................................................................. 36 6.3.3 Aquifer Types and Classification .................................................................... 36 6.3.4 Aquifer Vulnerability ....................................................................................... 37 6.3.5 Groundwater Resources ...............................................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    111 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us