Revised Draft Resettlement Action Plan Sanehwal Pilkhani Section of Proposed Eastern Dedicated Freight Corridor Dedicated Freigh

Revised Draft Resettlement Action Plan Sanehwal Pilkhani Section of Proposed Eastern Dedicated Freight Corridor Dedicated Freigh

REVISED DRAFT RESETTLEMENT ACTION PLAN SANEHWAL PILKHANI SECTION OF PROPOSED EASTERN DEDICATED FREIGHT CORRIDOR DEDICATED FREIGHT CORRIDOR CORPORATION OF INDIA LIMITED January 2015 Resettlement Action Plan of Sanehwal-Pilkhani Section of EDFC January, 2015 INDEX ABBREVIATIONS EXECUTIVE SUMMARY ............................................................................................................ 3 E.1 THE PROJECT ...................................................................................................................................................... 3 R&R POLICY AND ENTITLEMENT FRAMEWORK .............................................................................................. 4 LAND ACQUISITION AND RESETTLEMENT IMPACTS ...................................................................................... 5 MEASURES TAKEN TO MINIMISE RESETTLEMENT IMPACTS ........................................................................ 5 KEY SOCIO-ECONOMIC FINDINGS ................................................................................................................................... 5 CONSULTATIONS ..................................................................................................................................................... 6 IMPLEMENTATION PLAN ....................................................................................................................................... 6 CHAPTER – 1: INTRODUCTION ............................................................................................ 11 PROJECT BACKGROUND .............................................................................................................................................. 11 THIS RAP REPORT HAS BEEN PREPARED FOR SANEHWAL-PILKHANI SECTION WHICH IS 175.00 KMS. THE TOTAL LENGTH OF APL-3 IS 447 KMS WHICH ALSO INCLUDES KHURJA-DADRI SECTION. THIS RAP FOR PILKHANI- KHURJA KHURJA-DADRI SECTION IS BEING PREPARED SEPARATELY. ........................................................... 11 BRIEF DESCRIPTION OF PROJECT ............................................................................................................................. 11 SOCIAL IMPACT ASSESSMENT ............................................................................................................................ 13 ALTERNATIVES TO MINIMISE IMPACTS ........................................................................................................... 14 SUMMARY OF IMPACTS ........................................................................................................................................ 14 * S/M/L - SMALL FARMERS/MARGINAL FARMERS/LANDLESS FARMERS. ................................................................... 15 RESETTLEMENT ACTION PLAN .................................................................................................................................... 15 CHAPTER - 2: BASE LINE SOCIO-ECONOMIC STATUS OF PROJECT AFFECTED PEOPLE ......................................................................................................... 17 GENERAL ................................................................................................................................................................. 17 THE PROJECT AREA ............................................................................................................................................... 17 *THIS RAP REPORT HAS BEEN PREPARED FOR SANEHWAL-PILKHANI SECTION WHICH IS 175.00 KMS. TOTAL LENGTH OF APL-3 IS 447 KMS WHICH ALSO INCLUDES KHURJA-DADRI SECTION. ..................................................... 17 FINDINGS OF THE CENSUS AND BASELINE SURVEY ..................................................................................................... 17 PROJECT IMPACTS ....................................................................................................................................................... 17 SOCIO-ECONOMIC ANALYSIS OF THE PAFS AND PAPS ................................................................................................ 19 IMPORTANT FINDINGS AND CONCLUSIONS OF THE PROJECT ARE: ................................................................................ 21 CHAPTER - 3: LEGAL FRAMEWORK..................................................................................... 25 APPLICABLE LAWS ...................................................................................................................................................... 25 RAILWAYS (AMENDMENT) ACT, 2008 ......................................................................................................................... 25 NATIONAL REHABILITATION AND RESETTLEMENT POLICY (NRRP-2007) .................................................................. 26 3.7 RIGHT TO TRANSPARENCY AND FAIR COMPENSATION IN LAND ACQUSITION AND RESETTLEMENT AND REHABILITATION ACT, 2013 AND RTFCLARR ORDINANCE, 2014 ............. 27 WORLD BANK GUIDELINES FOR INVOLUNTARY RESETTLEMENT ................................................................................ 29 DISABILITIES (EQUAL OPPORTUNITIES, PROTECTION OF RIGHTS AND FULL PARTICIPATION) ACT, 1995 ....................... 30 RESETTLEMENT POLICY FOR DFC PROJECT AND ENTITLEMENT MATRIX ................................................................... 30 ELIGIBILITY FOR COMPENSATION/ASSISTANCE / REHABILITATION ............................................................................. 31 ENTITLEMENT MATRIX ............................................................................................................................................... 33 CHAPTER – 4: STAKEHOLDER’S CONSULTATIONS ........................................................... 58 INTRODUCTION ...................................................................................................................................................... 58 CONSULTATION DURING SOCIO-ECONOMIC SURVEY STAGE................................................................................ 58 ACTION PLAN .......................................................................................................................................................... 61 CHAPTER – 5: SCOPE OF LAND ACQUISITION AND COMPENSATION PAYMENT PROCESS ...................................................................................................... 63 LAND ACQUISITION PROCESS IN EDFC PROJECT ........................................................................................................ 63 EXTENT OF LAND ACQUISITION .................................................................................................................................. 64 APPOINTMENT OF ARBITRATOR ........................................................................................................................ 64 CHAPTER – 6: INSTITUTIONAL AND IMPLEMENTATION ARRANGEMENT....................... 47 I | 1 Resettlement Action Plan of Sanehwal-Pilkhani Section of EDFC January, 2015 R&R INSTITUTIONAL ARRANGEMENT AT THE HEADQUARTER LEVEL ................................................................... 47 R&R INSTITUTIONS AT THE FIELD LEVEL ................................................................................................................... 49 ADMINISTRATIVE ROLES, RESPONSIBILITIES & FINANCIAL POWERS ............................................................................ 51 MONITORING AND EVALUATION ................................................................................................................................. 53 GRIEVANCE REDRESS MECHANISM .............................................................................................................................. 55 COMPLAINT HANDLING SYSTEM IN DFC FIELD LEVEL AND CORPORATE LEVEL ........................................................ 57 INCOME RESTORATION ................................................................................................................................................ 57 COORDINATION WITH CIVIL WORK AND CERTIFICATION............................................................................................. 66 COST ESTIMATE .......................................................................................................................................................... 66 IMPLEMENTATION BUDGET ................................................................................................................................ 68 SUMMARY OF COMPENSATION FOR LAND LOSS AND R&R ASSISTANCE................................................ 68 LIST OF TABLES Table E 1: Key Impacts in Sanehwal Pilkhani Section..................................................................... 4 Table 1.1: Project Area: Salient Feature ........................................................................................ 14 Table 2.1: Project Area: Salient Features ....................................................................................... 17 Table 2.2: Project Area: Loss of Land ........................................................................................... 18 Table 2.3: Parcel of Plot Affected of each PAFs ............................................................................ 18 Table 2.4 Assessment of Impact on Structures ............................................................................. 18 Table 2.5: Identification of Small and marginal farmers ................................................................ 19

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    128 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us