M271 Motorway and A33 (Redbridge

M271 Motorway and A33 (Redbridge

M271 MOTORWAY AND A33 (REDBRIDGE ROUNDABOUT) TEMPORARY TRAFFIC RESTRICTIONS Notice is hereby given that Highways England Company Limited has made an Order on the M271 Motorway and A33 in the County of Hampshire and the Unitary Authority of the City of Southampton, under Sections 14(1) (a) and 14(5)(b) of the Road Traffic Regulation Act 1984 because works are proposed to be executed on the road. The effect of the Order is, in phases, to:- 1. authorise the overnight closure and 24-hour weekend closure of – (a) both carriageways of the M271 between Junction 1 (Nursling Interchange) and Redbridge Roundabout (A33/A35), and all slip roads leading to and from this length; (b) Redbridge Roundabout (M271/A33/A35); (c) the slip roads leading to and from the A33 at Redbridge Roundabout (M271/A33/A35); (d) all side roads at junction with Redbridge Roundabout (M271/A33/A35) and the slip roads described in 1. (c) above; (e) any bus stop adjacent to the slip roads described in 1. (c) above; (f) the bus lane adjacent to the A33 westbound off slip between its junction with Old Redbridge Road and Redbridge Roundabout; and (g) the footpaths, pedestrian crossings, footbridges and subways adjacent to 1. (b), (c), and (d) above. 2. impose a 24-hour 50mph speed limit and overtaking ban on – (a) the M271 southbound between M27 Junction 3 and Redbridge Roundabout (M271/A33/A35); and (b) the M271 northbound between Redbridge Roundabout (M271/A33/A35) and Junction 1 (Nursling Interchange). 3. impose a 24-hour 30mph speed limit on the roundabout and slip roads described in 1. (b) and (c) above. 4. impose a 24-hour width restriction of 3.25 metres in lanes 1 and 2 in the lengths of carriageway and roundabout described in 1. (a) and (b) above. 5. impose a 24-hour width restriction of 3.0 metres on the slip roads described in 1. (c) above. These measures are in the interests of road safety while contractors undertake carriageway works, footpath works, footbridge works, subway maintenance, electrical works and all associated works. It is expected that the work will last for approximately 6 months starting on or after Wednesday 1st May 2019. The overnight closures will take place between 21:00 and 05:00 (maximum period). The Order will come into force on 29th April 2019 and have a maximum duration of six months (subject to completion of works, the Order may be extended). Traffic affected by the closures will be diverted using the A33, A35, A3057 and Brownhill Way. The diversion route will vary depending on direction of travel. Pedestrian diversion routes will be available, including temporary pedestrian crossings. The temporary speed limit, narrow lanes, overtaking ban, closures and diversion routes will be clearly indicated by traffic signs when they are in operation during the works period. J Downham, an Official of Highways England Co Ltd. Ref: HE/SE/2018/M271/70 Highways England Company Limited, (Company No. 9346363). Registered Office: Bridge House, Walnut Tree Close, Guildford, Surrey, GU1 4LZ. A company registered in England and Wales. For enquiries, please contact the Customer Contact Centre on 0300 123 5000 or [email protected]. http://www.highways.gov.uk.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us