Environmental Impact Assessment Report Summary Initial Environmental Examination Project Number: 40682 March 2009 People’s Republic of China: Integrated Renewable Biomass Energy Development Project – Heilongjiang Province Prepared by: Heilongjiang Provincial Environmental Protection Research Institute For: Heilongjiang Provincial Rural Energy Office This report has been submitted to ADB by Heilongjiang Provincial Rural Energy Office and is made publicly available in accordance with ADB’s public communications policy (2011). It does not necessarily reflect the views of ADB. Summary of Non-core subproject IEE 1. Name of project : Large Biogas Engineering ADB-Loaned Project of Zhaozhou County Jin Li Shen Sheng Live Pig Breeding Co., Ltd. 2. Location of project ): Shuanghe Village, Shuangfa Township, Zhaozhou County, Daqing, Heilongjiang. 3. Evaluation unit : Heilongjiang Provincial Environmental Protection Research Institute 4. Project investment, US$ Exchange rate(1:6.9) Total investment cost, US$ : 726,300 ADB loan amount, US$ :362,318 配 Counterpart fund, US$ :363,982 5. Construction content : (1) location, type and scale of farm, and the amount of waste The pig farm has 10,000 pigs, the annual discharging volume of excrement is 7,300t, the land occupation area is 52,000 square meters,Raw materials for biogas project, therefore, there is a reliable supply. (2) type of biogas plant, equipment used Biogas production unit: 1 CSTR reactor, 1000 m3; 1 ABR reactor, 400 m3; Biogas storage unit: 1 dry biogas cabinet, 450 m3; Combined production unit of heat and power: one 75kW biogas generator and one set of surplus-heat recovery unit; Biogas conveying and distribution unit: one set of biogas conveying and distribution material. (3) amount of biogas generated, uses of biogas, uses of slurry and sludge (1) The annual output of biogas is 341,300 m3,which is mainly used for generating power ; (2)The annual output of biogas slurry is 26,280t, which is mainly used for peripheral farmland. (4) construction and operational period Construction period:2010-2011 Runtime:20 years 6. Major environmental impacts The project production and living waste water had no influence on surface water 7. Environmental management plan and staff to implement the plan Environmental management plan : control the production of solid waste, emissions, noise Staff to implement the plan: The Project Manager 4, 2 are responsible for solid waste, 1 is responsible for emissions, 1 is responsible for noise 8. Date of consultation 2008.5 9. IEE approval date and agency (attach a photocopy of the approval letter) IEE approval date:2009.3.3 Agency:Heilongjiang Provincial Environmental Protection Office Summary of Non-core subproject IEE 1. Name of project: Large Biogas Engineering ADB-Loaned Project of Huachuan County Fenglin Animal husbandry Co., Ltd. 2. Location of project: Simajia village, Simajia country, Huachuan county, Heilongjiang province. 3. Evaluation unit: Heilongjiang Provincial Environmental Protection Research Institute 4. Project investment, US$ Exchange rate(1:6.9) Total investment cost, US$ :625,163.38 ADB loan amount, US$:362,300.00 Counterpart fund, US$ :262,863.38 5. Construction content ): (1) location, type and scale of farm, and the amount of waste The pig farm has 10,000 pigs, the annual discharging volume of excrement is 7,300t,,Raw materials for biogas project, therefore, there is a reliable supply. (2) type of biogas plant, equipment used Biogas production unit: 1 HCPF reactor, 600 m3; 1 ABR reactor, 400 m3; Biogas storage unit: 1 dry biogas cabinet, 450 m3; Combined production unit of heat and power: two 80kW biogas generator and one set of surplus-heat recovery unit; Biogas conveying and distribution unit: one set of biogas conveying and distribution material. (3) amount of biogas generated, uses of biogas, uses of slurry and sludge (1) The annual output of biogas is 328,500 m3,which is mainly used for generating power ; (2)The annual output of biogas slurry is 25,185t, which is mainly used for peripheral farmland. (4) construction and operational period Construction period:2010-2011 Runtime:20 years 6. Major environmental impacts The project production and living waste water had no influence on surface water 7. Environmental management plan and staff to implement the plan Environmental management plan : control the production of solid waste, emissions, noise Staff to implement the plan: The Project Manager 4, 2 are responsible for solid waste, 1 is responsible for emissions, 1 is responsible for noise 8. IEE approval date and agency (attach a photocopy of the approval letter IEE approval date:2009.3.3 Agency:Heilongjiang Provincial Environmental Protection Office Summary of Non-core subproject IEE 1.Name of project: Large Biogas Engineering ADB-Loaned Project of Heilongjiang province HengYang Cow Breeding Shares Co., Ltd. 2.Location of project: East part of Nanhuan road, Nehe city, Heilongjiang province. 3.Evaluation unit: Heilongjiang Provincial Environmental Protection Research Institute 4.Project investment, US$ Exchange rate(1:6.9) Total investment cost, US$:536,606.61 ADB loan amount, US$:362,300.00 Counterpart fund, US$:174,306.61 美元 5.Construction content: (1) location, type and scale of farm, and the amount of waste The main material is waste water of slaughter factory, the amount is 500t/d,there is a reliable supply (2) type of biogas plant, equipment used Biogas production unit: 1UASB reactor, 1500 m3; Biogas storage unit: 1 dry biogas cabinet, 200 m3; (3) amount of biogas generated, uses of biogas, uses of slurry and sludge (1) The annual output of biogas is 182,500 m3,which is mainly used for supplying gas for heating; (2)The annual output of biogas slurry is 36,500t, which is mainly used for peripheral farmland. (4) construction and operational period Construction period:2010-2011 Runtime:20 years 6. Major environmental impacts The project production and living waste water had no influence on surface water 7. Environmental management plan and staff to implement the plan Environmental management plan : control the production of solid waste, emissions, noise Staff to implement the plan: The Project Manager 4, 2 are responsible for solid waste, 1 is responsible for emissions, 1 is responsible for noise 8. IEE approval date and agency (attach a photocopy of the approval letter) IEE approval date:2009.3.3 Agency:Heilongjiang Provincial Environmental Protection Office Summary of Non-core subproject IEE 1. Name of project : Large Biogas Engineering ADB-Loaned Project of Heilongjiang ZhuangDa Biogas Co., Ltd. 2. Location of project: Zhuangda village, Zhaozhou town, Heilongjiang province. (3) Evaluation unit: Heilongjiang Provincial Environmental Protection Research Institute 4. Project investment, US$ Exchange rate(1:6.9) Total investment cost, US$ : 725,392.33 ADB loan amount, US$ :362,300.00 Counterpart fund, US$ :363,092.33 5. Construction content : (1) location, type and scale of farm, and the amount of waste The pig farm has 1,000 cows, the annual discharging volume of excrement is 7,300t, Raw materials for biogas project, therefore, there is a reliable supply. (2) type of biogas plant, equipment used Biogas production unit: 1 CSTR reactor, 1000 m3; Biogas storage unit: 1 dry biogas cabinet, 500 m3; Combined production unit of heat and power: three 75kW biogas generator and one set of surplus-heat recovery unit; 10. amount of biogas generated, uses of biogas, uses of slurry and sludge (1) The annual output of biogas is 365,000 m3,which is mainly used for generating power ; (2)The annual output of biogas slurry is 14,600t, which is mainly used for peripheral greenhouse. (4) construction and operational period Construction period:2010-2011 Runtime:20 years 6. Major environmental impacts The project production and living waste water had no influence on surface water 7. Environmental management plan and staff to implement the plan Environmental management plan : control the production of solid waste, emissions, noise Staff to implement the plan: The Project Manager 4, 2 are responsible for solid waste, 1 is responsible for emissions, 1 is responsible for noise 8. IEE approval date and agency (attach a photocopy of the approval letter) IEE approval date:2009.3.3 Agency:Heilongjiang Provincial Environmental Protection Office Summary of Non-core subproject IEE 1. Name of project Large Biogas Engineering ADB-Loaned Project of Huachuan County Hualong Animal husbandry Co., Ltd. 2. Location of project: Hengtoushan town, Huachuan county, Heilongjiang province. 3.鉴 Evaluation unit Heilongjiang Provincial Environmental Protection Research Institute 4. Project investment, US$ Exchange rate(1:6.9) Total investment cost, US$ : 436,373.89 ADB loan amount, US$ :217,300.00 Counterpart fund, US$ :219,073.89 美元 5. Construction content ): (1) location, type and scale of farm, and the amount of waste The pig farm has 10,000 pigs, the annual discharging volume of excrement is 7,300t,,Raw materials for biogas project, therefore, there is a reliable supply. (2) type of biogas plant, equipment used Biogas production unit: 1 HCPF reactor, 400 m3; 1 ABR reactor, 400 m3; Biogas storage unit: 1 dry biogas cabinet, 200 m3; Combined production unit of heat and power: two 40kW biogas generator and one set of surplus-heat recovery unit; Biogas conveying and distribution unit: one set of biogas conveying and distribution material. (3) amount of biogas generated, uses of biogas, uses of slurry and sludge (1) The annual output of biogas is 164,300 m3,which is mainly used for generating power ; (2)The annual output of biogas slurry is 11,680t, which is mainly used for peripheral farmland. (4) construction and operational period Construction period:2010-2011 Runtime:20 years 6. Major environmental impacts The project production and living waste water had no influence on surface water 7. Environmental management plan and staff to implement the plan Environmental management plan : control the production of solid waste, emissions, noise Staff to implement the plan: The Project Manager 4, 2 are responsible for solid waste, 1 is responsible for emissions, 1 is responsible for noise 8.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages17 Page
-
File Size-