Planning Proof of Evidence: Exhibits Paul Ellingham Ref: CEN/P8.3/PLA

Planning Proof of Evidence: Exhibits Paul Ellingham Ref: CEN/P8.3/PLA

CEN/P8.3/PLA Planning Proof of Evidence: Exhibits Paul Ellingham Ref: CEN/P8.3/PLA Exhibit 1 2005 Deemed Planning Consent (Reference TWA/03/APP/04) Ref: CEN/P8.3/PLA Exhibit 2 2005 Planning Conditions Ref: CEN/P8.3/PLA Exhibit 3 Centenary Square Extension Decision Notice Planning and Regeneration PO Box 28, Birmingham B1 1TU Discharge Of Condition – Decision Document Your Ref: Mr P Ellingham Application Number: 2013/09125/PA Date: Thursday 8th May 2014 Please quote this number whenever you contact us about this application. For more information please Alliance Planning contact: 3rd Floor 54 Hagley Road Edgbaston 0121 303 1115 Birmingham B16 8PE Email us at: [email protected] Dear Sir / Madam Site: Part of Midland Metro, Birmingham City Centre, Extension Route, Birmingham Proposal: Application to determine the details for conditions 2, 3, 4, 6, 8, 9 and 12 (all in part except condition 9) attached to planning approval TWA/03/APP/04 in relation to the phase of Metro between New Street Station and Centenary Square only. I am writing to tell you that the Council has made a decision on the above and the application has been approved on 08 May 2014 subject to any details shown below. The information received on the 10th December 2013, 3rd April 2014 & 2nd May 2014 in connection with conditions 2, 3, 4, 6, 8, 9 and 12 of the Midland Metro (Birmingham City Centre Extension, etc) Order 2005 dated 1 July 2005, and associated deemed planning consent TWA/03/APP/04, is acceptable and the details below are hereby approved. This decision is in relation to the area identified in drawing number MMD-300207- CS08-DRA-0000-0021 Revision P1 and in respect of the details explicitly referred to below only, concerning the delivery of the section of the Metro infrastructure between New Street Station and Centenary Square. 2 - Design and External Appearance - For the Victoria Square tram stop, permanent boundary treatment and poles and brackets required to support the overhead line system. All as shown in drawings: MMD-300207-CS08-DRA-0000-0031 Revision P1, MMD-300207-CS08-DRA-0000-0090 Revision P1, 1193- 001, 1193-002, 1193-003, 1193-004, 1193-005, 1193-006, 1193-007, 1193-008, OX4500-20-GA-107 Revision I, OX4500-20-GA-108 Revision I, OX4500-20-GA-110 Revision K, OX4500-20-GA-111 Revision K, OX4500- 20-GA-112 Revision E, OX4500-20-407 Revision D, OX4500-20-411 Revision C, OX4500-20-413 Revision C, OX4500-20-416 Revision D, OX4500-20-428 Revision C, OX4500-20-429 Revision C, OX4500-20-430, MMD-300207-CS08-DRA-0000-0092 Revision P2 and MMD-300207-CS08-DRA-0000-0080 Revision P1. 3 - Materials - For the Victoria Square tram stop, permanent boundary treatment and poles and brackets required to support the overhead line system. All as shown in drawings: MMD-300207-CS08-DRA-0000-0031 Revision P1, MMD-300207-CS08-DRA-0000-0090 Revision P1, 1193- 001, 1193-002, 1193-003, 1193-004, 1193-005, 1193-006, 1193-007, 1193-008, OX4500-20-GA-107 Revision I OX4500-20-GA-108 Revision I, OX4500-20-GA-110 Revision K, OX4500-20-GA-111 Revision K, OX4500- 20-GA-112 Revision E, OX4500-20-407 Revision D, OX4500-20-411 Revision C, OX4500-20-413 Revision C, OX4500-20-416 Revision D, OX4500-20-428 Revision C, OX4500-20-429 Revision C, OX4500-20-430, MMD-300207-CS08-DRA-0000-0092 Revision P2 and MMD-300207-CS08-DRA-0000-0080 Revision P1. 4 - Landscaping - All hard and soft landscaping as shown in drawings: Page 1 of 3 PL Minor Amendment Decision Letter Planning and Regeneration PO Box 28, Birmingham B1 1TU OX4500-20-GA-107 Revision I, OX4500-20-GA-108 Revision I, OX4500-20-GA-110 Revision K, OX4500-20- GA-111 Revision K, OX4500-20-GA-114 Revision G, OX4500-20-GA-115 Revision D, OX4500-20-400 Revision C, OX4500-20-401 Revision E, OX4500-20-402 Revision F, OX4500-20-403 Revision C, OX4500- 20-404 Revision E, OX4500-20-405 Revision D, OX4500-20-406 Revision C, OX4500-20-408 Revision D, OX4500-20-409 Revision D, OX4500-20-414 Revision C, OX4500-20-419 Revision D, OX4500-20-420 Revision D, OX4500-20-421 Revision E, OX4500-20-422 Revision E, OX4500-20-423 Revision D, OX4500- 20-424 Revision F, OX4500-20-425 Revision D, OX4500-20-426 Revision D, OX4500-20-427 Revision D, OX4500-20-428 Revision C, MMD-300207-CS08-DRA-0000-0101 Rev P1, MMD-300207-CS08-DRA-0000- 0102 Rev P1, MMD-300207-CS08-DRA-0000-0106 Rev P1 and the Howl Associates Heritage Impact Assessment November 2013 Revision B. 6 - Code of Construction Practice (Part 1 only) as detailed in: Part 1 of the Code of Construction Practice as outlined in the Centro document entitled 'Code of Construction Practice Part 1 December 2013 Final Version'. 8 - Means of Access - Details of siting, design and layout of new or altered permanent means of highway access to be used by vehicular traffic All as shown in drawings: - MMD-300207-CS08-DRA-0000-0022 Revision P1, OX4500-20-GA-117 Revision D, MMD-300207-CS08-DRA-0000-0061 Revision P1, MMD-300207-CS08-DRA-0000-0062 Revision P2, MMD-300207-CS08-DRA-0000-0063 Revision P2, MMD-300207-CS08-DRA-0000-0064 Revision P1, MMD- 300207-CS08-DRA-0000-0065 Revision P1, HW/11.01 Revision D, HW/11.02 Revision D, HW/11.03 Revision D, HW/11.04 Revision D, HW/11.50 Revision D, HW/11.51 Revision E, HW/11.52 Revision D, HW/11.54 Revision D and HW/11.57 Revision D. 9 - Location of the Iron Man Sculpture as shown on drawings: OX4500-20-GA-107 Revision I, OX4500-20-GA-108 Revision I, OX4500-20-GA-110 Revision K, OX4500-20- GA-111 Revision K and OX4500-20-426 Revision D. 12 - Ecology Surveys and Mitigation - as detailed in: Mott MacDonald report entitled 'Midland Metro BCCE - Extension to Centenary Square' reference MMD- 300207-CS08-DOC-0000-0004 Revision A dated 20th November 2013. Development shall proceed in accordance with the details provided and agreed. Please note that should you require confirmation that the scheme has been implemented in accordance with the approved details and that the conditions can be cleared in full, a further application should be made following the completion of the development. If you require any additional information the Case Officer for this application is Nicholas Jackson, you can email directly on:[email protected] or telephone us on the number shown above. Yours faithfully Waheed Nazir, Director of Planning and Regeneration Page 2 of 3 PL Minor Amendment Decision Letter Planning and Regeneration PO Box 28, Birmingham B1 1TU In reaching this decision Birmingham City Council have made the decision in a positive way to foster the delivery of sustainable development, working proactively with applicants to secure developments that improve the economic, social and environmental conditions of the area. The decision has been taken having regard to the impact of the development, and in particular to the policies and proposals in the adopted Development Plan, and to all relevant material considerations, including the National Planning Policy Framework, the City Council's draft Birmingham Development Plan and Supplementary Planning Documents/Guidance. The City Council have worked in a seamless and timely manner to undertake the necessary liaison and negotiation with the applicant, third parties and statutory consultees (at the application and pre-application stages) to look for solutions which seek only high quality sustainable development. Page 3 of 3 PL Minor Amendment Decision Letter Ref: CEN/P8.3/PLA Exhibit 4 Paradise Circus Redevelopment Committee Report Committee Date: 20/12/2012 Application Number: 2012/05116/PA Accepted: 25/07/2012 Application Type: Outline Target Date: 24/10/2012 Ward: Ladywood Land at and bounded by Paradise Circus Queensway and surroundings including Chamberlain Square, Parade and Paradise Street, Birmingham, B3 3HJ Outline planning application (all matters reserved save for access) for demolition of all buildings on the site (save for the Joseph Chamberlain Memorial) and commercial led mixed use redevelopment of up to 170,012 square metres gross internal floorspace, comprising offices (Use Class B1a), retail and leisure units (Use Classes A1/A2/A3/A4/A5/D1/D2), concert hall (D2), energy centre (Sui Generis), together with a hotel of up to 250 bedrooms (Use Class C1), car parking, highways works (to include the closure of eastern arm of Paradise Circus gyratory), public realm improvements and associated works including alterations to public rights of way. Applicant: Argent Group Plc C/O Agent Agent: Drivers Jonas Deloitte Four Brindley Place, Birmingham, B1 2HZ Recommendation Approve Subject To A Section 106 Legal Agreement 1. Proposal 1.1. This is an outline application with all matters reserved other than access. It includes the comprehensive redevelopment of the whole of the site, with the demolition of all buildings including the Central Library, Congreve House (including the bridge link to the Council House extension), BCU Conservatoire (including Adrian Boult Hall), Fletchers Walk shopping arcade, Paradise Forum, 77 Paradise Circus (office), Copthorne Hotel and Yardbird Jazz Club. The site covers some 7.04 hectares. 1.2. The proposal is for a maximum of 170,012 sq m of new floor space (excluding the hotel and car park), to provide; offices, ancillary retail and leisure, a new music school auditorium for Adrian Boult, and a replacement Copthorne hotel of upto 250 bedrooms. The scheme would provide significant new office floorspace with complementary retail and food and drink uses.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    91 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us