Emakhazeni Local Municipality 15 Points for Nkangala District Municipality 10 Points for Mpumalanga Province 05 Points for Contractors Outside of Mpumalanga Province

Emakhazeni Local Municipality 15 Points for Nkangala District Municipality 10 Points for Mpumalanga Province 05 Points for Contractors Outside of Mpumalanga Province

EEmakhazeni LLocal MMunicipality 25 Scheepers Street Tel: 013-253-7600 Belfast, 1100 Fax: 013-253-2440/ P.O Box 17 013-253-1889 Belfast, 1100 E-mail: [email protected] Office of the Municipal Manager ADDENDUM Please be informed of the following changes for the projects below: NOTICE FOR BID NUMBER: ELM 18/07/10 REFURBISHMENT OF BELFAST WATER TREATMENT WORKS, UPGRADING OF BULK SUPPLY AND ELEVATED STEEL TANK IN EXTENTION 02. Briefing session will be held on the 26th of September 2018 in Siyathuthuka Community Hall next to Shoprite U Save at 09h00. The closing date has been extended from the 20th of September 2018 to the 05th of October 2018 at 11h00. NOTICE FOR BID NUMBER: ELM 18/07/03 PROVISION OF WATERBORNE SANITATION FOR SAKHELWE EXTENTION 02 PHASE 4 (130 STANDS); Briefing session will be held on the 26th of September 2018 at ELM offices in Dullstroom at 12h00 The closing date has been extended from the 20th of September 2018 to the 05th of October 2018 at 12h30 NOTICE FOR BID NUMBER: ELM 18/07/12 REFURBISHMENT OF WATER TRETMENT WORKS AND REPLACEMENT OF AC PIPELINES IN EMGWENYA PHASE 02. Briefing session will be held on the 26th of September 2018 at Nicholus Ndlovu Hall in Emgwenya (Waterval Boven) at 14h00. The closing date has been extended from the 20th of September 2018 to the 05th of October 2018 at 13h30 Functionality points for locality has been allocated as follows: 20 points for Emakhazeni Local Municipality 15 points for Nkangala District Municipality 10 points for Mpumalanga Province 05 points for contractors outside of Mpumalanga province The functionality points remains as follows: For ELM 18/07/10 – minimum requirement for functionality is 75%; For ELM 18/07/03 – minimum requirement for functionality is 60%; and For ELM 18/07/12 – minimum requirement for functionality is 60%. 1 Bidders must obtain a minimum functionality points as mentioned above in order to pass the first stage of evaluation (Functionality). All bidders who pass the functionality stage will be evaluated further on price and BBB – EE. We apologize for any inconvenience this might have caused. E K TSHABALALA MUNICIPAL MANAGER SIGNATURE:……………………………………….... 2 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us