Geotechnical and Groundwater Site Characterization on the UMTRA Project

Geotechnical and Groundwater Site Characterization on the UMTRA Project

Missouri University of Science and Technology Scholars' Mine International Conference on Case Histories in (1988) - Second International Conference on Geotechnical Engineering Case Histories in Geotechnical Engineering 01 Jun 1988, 1:00 pm - 5:00 pm Geotechnical and Groundwater Site Characterization on the UMTRA Project J. A. Caldwell Technical Assistance Contractor, Albuquerque, New Mexico R. A. Rager Technical Assistance Contractor, Albuquerque, New Mexico L. Coons Technical Assistance Contractor, Albuquerque, New Mexico Follow this and additional works at: https://scholarsmine.mst.edu/icchge Part of the Geotechnical Engineering Commons Recommended Citation Caldwell, J. A.; Rager, R. A.; and Coons, L., "Geotechnical and Groundwater Site Characterization on the UMTRA Project" (1988). International Conference on Case Histories in Geotechnical Engineering. 10. https://scholarsmine.mst.edu/icchge/2icchge/2icchge-session1/10 This work is licensed under a Creative Commons Attribution-Noncommercial-No Derivative Works 4.0 License. This Article - Conference proceedings is brought to you for free and open access by Scholars' Mine. It has been accepted for inclusion in International Conference on Case Histories in Geotechnical Engineering by an authorized administrator of Scholars' Mine. This work is protected by U. S. Copyright Law. Unauthorized use including reproduction for redistribution requires the permission of the copyright holder. For more information, please contact [email protected]. Proceedings: Second International Conference on Case Histories in Geotechnical Engineering, June 1-5, 1988, St. Louis, Mo., Paper No. 1.09 Geotechnical and Groundwater Site Characterization on the UMTRA Project J.A. Caldwell L. Coons Technical Assistance Contractor, Albuquerque, New Mexico Technical Assistance Contractor, Albuquerque, New Mexico R.E. Rager Technical Assistance Contractor, Albuquerque, New Mexico SYNOPSIS: Recl_amation of 2~ in~ctive uranium '!!ill tailngs piles involves remedial work to stabilize the piles for 1000 years. S1te character12at1on of geotechn1cal and groundwater conditions at each site is undertaken prior to remedi a 1 act ion design. This paper describes the approach to UMTRA Project site characterization. A case hi story, Green River, is described. Details of site characterization costs for most sites are provided. INTRODUCTION The Uranium Mill Tailings Remedial Action (UMTRA) Project involves the construction of The EPA standards require, among other things, remedial action to stabilize and reclaim 24 that the remedial action be effective for at inactive uranium mill tailings piles in 10 least 1000 years, to the extent practical, and states. An important part of the planning and at least for 200 years. Remedial action must be design of remedial action is site designed and constructed to prevent dispersal characterization. This paper describes the of the tailings and other contaminated UMTRA Project site characterization program. materials, and must prevent inadvertent use of Details of site characterization at the Green tailings by man. Remedial actions should not River, Utah, site are discussed in order to rely for their efficacy on maintenance provide a complete overview and a specific case although in practice, maintenance and ' history of UMTRA Project approaches and surveillance programs are planned at all sites. methods, as well as the end product. To date, construction is complete at: Site characterization work at UMTRA Project Canonsburg, Pen~sylvania; Shiprock, New Mexico; sites, discussed in this paper, includes the and Salt Lake C1ty, Utah. Construction work is following: geological investigations; field in progress at: Durango, Colorado; Mexican drilling and test pitting; collection of Hat, Utah; and Lakeview, Oregon. site tailings, soil, rock, and surface-water and characterization is complete, or significantly groundwater samples; laboratory testing of advanced at the remaining sites, with the tailings, soils, rocks, and water; and the exceptions of Gun~ison and Naturita, Colorado, compilation of site characterization reports where alternate s1te selection studies are in describing the site stratigraphy, groundwater progress. In terms of Federal legislation the regime, and the properties of the in-place and Project is scheduled to be complete by 1993. construction materials. Site characterization work performed at UMTRA Project sites, but not THE TECHNICAL APPROACH DOCUMENT AND CONTRACTUAL discussed in this paper, includes: PROCEDURES archaeological surveys; plant and animal surveys; radiological and other waste Technical Approach characterization work; and climatological and surface-water characterization. The technical approach to site characterization at UMTRA Project sites is described in a THE UMTRA PROJECT Technical Approach Document (TAD). The TAD which was compiled in close discussion with'the The UMTRA Project is managed by the u.s. EPA, NRC, and affected states and tribes, sets Department of Energy (DOE) in terms of the the out in detail the methods and approaches Uranium Mill Tailings Remedial Control Act emplo¥e~ to c~aracterize the following aspects (UMTRCA) of 1983. Site characterization, of ta1l1ngs p1les and new disposal sites: design, and construction are performed by geology; groundwater; site and regional contractors to the DOE. seismicity; subsurface soils and rocks and their geotechnical and hydrogeochemical In terms of UMTRCA, the u.s. Environmental properties; tailings and their geotechnical and Protection Agency (EPA) sets the standards for radiological properties; and the geotechnical the remedial action. The Nuclear and radon attenuation properties of potential u.s. construction materials (soils and rocks that Regulatory Commission (NRC) and affected states will be used to construct and cover the and tribes review and concur in the design of reshaped or relocated tailings pile and the remedial action works. associated contaminated materials). A later section of this paper discusses some of the technical approaches in detail. Second International Conference on Case Histories in Geotechnical Engineering 25 Missouri University of Science and Technology http://ICCHGE1984-2013.mst.edu Detailed site characterization procedures are Field Technical Representative (FTR) , is documented in the Standard Operating Procedures empowered to: monitor the contractor; observe of the various contractors to the DOE on the that proper work is performed; confirm that UMTRA Project. required operating procedures are observed; and request that specific work (e.g., in-situ testing) be done at appropriate times. The FTR is not empowered to control or direct the Performance of Site Characterization Work subcontractor's work. The FTR keeps a daily diary that is used as the basis for agreeing to The UMTRA Project is managed from the DOE and paying bills submitted by the Albuquerque Operations Office in Albuquerque, subcontractor. New Mexico. The Technical Assistance Contractor (TAC) is located with the DOE. The TAC is contracted to the DOE to provide, among other services: site characterization work; GEOTECHNICAL SITE CHARACTERIZATION - TECHNICAL conceptual designs; and the compilation of APPROACH Environmental Impact Statements/Environmental Assessments (EIS/EAs) and Remedial Action Plans Geotechnical site characterization includes (RAPs). TAC staff perform geological site geologic, geomorphic, subsurface characterization work as well as planning, investigations, and seismic studies. control, interpretation, and compilation of field programs and their results for Geologic site characterization of UMTRA Project geotechnical and groundwater characterization sites is an integral part of the overall design work. effort. This characterization consists of a summary of the regional geologic setting, local Due to the fact that the 24 sites are scattered site geology, regional and local structures, across a wide geographic area, TAC Quaternary geology of the site region, and the subcontractors are employed to perform site local distribution of surficial units. The in­ characterization work. This work involves depth geologic studies are presented in the drilling, geotechnical sampling, and in-situ Site Characterization Report section of the testing (i.e., with a piezocone). Laboratory Remedial Action Plan (RAP) • testing of soils, rocks, and water is done in commercial facilities subcontracted to the TAC. The purpose of the geomorphic hazard assessment is to identify the geomorphic processes that Because of the technical expertise required, affect the site, to estimate the probability of groundwater sampling is done by a team of TAC their occurrence, and to evaluate the possible staff who travel from site to site with magnitude of their effects during the life of specially-equipped vehicles. the reclamation. The general approach used to accomplish these goals involves three steps: (1) identify past geomorphic processes and estimate their rates from the geomorphic and Scopes Of Work stratigraphic records (post-glacial time, roughly 10,000 years); (2) identify present When subcontract work is required at a site, geomorphic processes and estimate their rates the usual procedure is for the TAC to call for from historic records and field observations bids from qualified subcontractors. The number (typically less than 80 years); and (3) predict of bidders varies significantly depending on future geomorphic processes and rates. the site location and the nature of the work required. Once bids have been issued,

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    11 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us