Causes of Construction Delays in Different Buildings Typology in Portugal

Causes of Construction Delays in Different Buildings Typology in Portugal

ISSN: 2643-6876 DOI: 10.33552/CTCSE.2021.07.000655 Current Trends in Civil & Structural Engineering Research Article Copyright © All rights are reserved by António Brito Causes of Construction Delays in Different Buildings Typology in Portugal António Brito* Department of Civil Engineering, Campus Universitário de Santiago, 3810-193 Aveiro, Portugal *Corresponding author: António Brito, Department of Civil Engineering, Campus Received Date: March 12, 2021 Universitário de Santiago, 3810-193 Aveiro, Portugal. Published Date: April 08, 2021 Abstract The construction represents the sector with the higher impact in the world economy, representing 13.4 %. This sector, crucial to the socioeconomic stability of a country, has been several affected due to the successive construction delays in the design as well as execution phases. Additionally, in comparison with other sectors, the construction industries present lower receptivity in the development of new methodologies and technologies to ambient),increase the to identifycompetitiveness the delays as by well groups, as workers type and incomes category and to profits achieve increasing a deep understanding the attention andfrom recommendations the industry and toacademia. help companies This study and focusing owners the identification of the constructions processes, which leaves to their delays. Thus, three different buildings typology use were studied (in a real the length of deadline and to carry out its control. However, the issue with higher impact in the overall construction delay is related with the lack of ato detailed reduce theplanning risk of as delay well during as works the programs execution and phase. constraints Regarding study the findingsleading tothe a managementseveral issues domain in the execution scheduling phase work that is a couldsimple been way previously to predict paramountavoided. As ofa finalimportance. conclusion the critical path analysis system is the most used for project management in construction, however new softwares to optimise these programs in order to reduce the extension of deadlines, increase the competitiveness of the sector and consequently its profits is Introduction literature for the construction delays to occur [4-5]. Additionally, world’s economy, representing a total of 176 billion euros, in [3], therefore representing one of the main reasons identified in The construction sector has a significant influence on the 2017, for European International Contractors members [1]. The execution designs to be perfectly concluded [6-7]. The existence of 2008 economic crisis [2] highlighted the asymmetries between the shortage of qualified labor workmanship does not allow several errors and/or omissions in design phase often provides delays that large and small to medium- sized companies in the construction lead to prolonged interruptions in the work, as well [8], and the industry business fabric and led to profound changings within increasing competitiveness of the sector, related to the existence construction companies, thus determining a new paradigm in the of more construction companies than the actual market demand, sector. Small companies were forced to declare insolvency, and large corporations began to operate almost exclusively through subcontracting, as a strategy to reduce the cost structure as well is responsible for the diminishing of profits [9]. The awareness the construction delays is paramount for the business market, so and identification of which specific constraints are responsible for that construction corporations do remain competitive as well as to the business model in the construction industry resulted as the means of reducing fixed costs. The consequent adjustment in large corporations to become increasingly dependent on which it operates can change the motivation of the entities involved outsourced entities for the construction activities to be performed holding profit. The economic factors of the region or country in This work is licensed under Creative Commons Attribution 4.0 License CTCSE.MS.ID.000655. Page 1 of 14 Current Trends in Civil & Structural Engineering Volume 7-Issue 1 [10]. Kumar and Narayanan [11] in their research evaluated the respectively [34-35]. Finally, its evaluation has been performed different risk factors that affect the execution deadline in the construction sector by distributing a questionnaire survey. Thus, [36]. The starting point of this work starts within an internship at considering which factors influenced the extension of the deadline a risk management procedural index was evaluated that allows to Constructora San José SA [37] focusing on the reduction of delays obtain the percentage of risks as well as their respective rank in and to recover the execution times towards respecting the deadlines order of the weighted value. Regarding results the highest delays constraints responsible for the consequent delays. Thus, a novel established, allowed the identification and collection of the real approach has been developed to estimate the time delays through were observed in the management with 15% of risk, financial with case studies analysis, facing the real problems occur as well as 12%Several and finally studies environmental discussing the causes risk withof delays 10% haveof risk. been studied solutions, in real environment during the execution phase, in-situ. extensively in the literature. Focusing by category (non-extensive methodology focused on the reduction of delays in the construction contract risk, delay caused by the contractors, increase of the price In summary, the objective of this paper is to provide an effective list) the type of risk is following detailed: Financial risk including industry work, through providing effective solutions able to of the construction materials and the bank orders changing [12- predict the constraints and subsequently to mitigate their impact 15]. Management risk namely, poor, or improper planning and on execution times with a direct evaluation on the relationship communication, external and internal collaboration, design errors between tasks and sub-tasks. and ineffective teamwork [16-20]. Technical risk namely, lack of training, low wages, inadequate safety measures in the execution, Methodology physical obstructions, frequent changes in the design, poor quality of materials [21-24]. Legal and political assessment comprising, the most common delays referred in the literature. Grouping the The followed methodology begins with the identification of errors in the contract documents, legal terms and procedural landscape, improper documentation, lack of records, loss of present work. The implemented methodology to assess the causes identified delays into different categories is the first step of the construction sector [25-29]. Environmental impact, such as natural revenue by the state, undefined bureaucracy and corruption in the Stepof delays 1-Causes in constructions of delays is individed construction into five main steps: resources management, noise pollution, air pollution, health plans development, and ecosystems [30-32]. From the above selected construction delays. It starts with the building’s characterization, Case studies characterization and respective identification of the in terms of typology, location and execution deadlines. Then, the literature review, significant importance has been presented on the identification of the critical causes of delays in the construction on the delay of tasks or sub tasks over others has not widespread assessing the differences in the construction techniques and its sector. However, a sequential dependence as well as the influence critical activities of the three case studies have been identified, reporting. Thus, it is paramount of important to identify and to study the relationship between the critical tasks as well as identifying the Stepinfluence 2-Cases in the studies respective general construction characterization delays. relationship between the delays and for instance make predictions The constraints were categorized into different groups in on the impact in the subtasks. order to quantify the most critical delays considering the global construction deadline. For this case study, two buildings were construction processes responsible for time delays using as a case In the present research it has been identified several study real scale under construction at the time. Thus, it has been Largo Hotel”). detailed analysed the work that has been done in three different evaluated retrospective, and one was followed in real time (“The buildings with distinct constructive typologies, in order to better Step 3-Development of a new methodology understand the type of constraints associated with each typology Development of a new methodology to identify critical tasks in accordingly to [33]. Subsequently, once the constraints were Largo Hotel” construction. This procedure attempt to quantify risks the construction delays and evaluated them in the context of “The and constraint category respectively [34-35]. Finally, its evaluation identified, they were grouped and categorized by the time delay impact on the overall construction schedule. responsible for delays that occur within a specific task, as well as its extension of the construction deadline [36]. In the present research has been performed considering which factors influenced the Step 4-Criterion analysis and evaluation for time delays in real scale case studies. Furthermore, it has been The successful implementation of this methodology was

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    14 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us