NOBERT MATARUTSE TECHNICAL DIRECTOR ESKOM UGANDA LIMITED UGANDA Who We Are?

NOBERT MATARUTSE TECHNICAL DIRECTOR ESKOM UGANDA LIMITED UGANDA Who We Are?

NOBERT MATARUTSE TECHNICAL DIRECTOR ESKOM UGANDA LIMITED UGANDA Who we are? • Eskom Uganda Limited is a whole owned subsidiary of Eskom Enterprises South Africa. • Took over the operations of the complex on 1st April, 2003. • Concessioned to operate and maintain Nalubaale and Kiira Hydro Power stations for 20 years under four contracts Electricity Generation line BUSINESS ENABLERS FOUR AGREEMENTS Concession & Assignment Water Mgt/ BUSINESSAgreement VALUE CHAIN Generation Capacity (UEGCL) Power Dispatch Support Agreement UETCL (DWD) (PPA, Licence) Sales/Tariffs Water Abstraction Operations & Maintenance Licence Permit (ERA) Hydropower Electricity Generation Business Generation Licence (ERA) Additional Agreements • Support Agreement • Heads of Agreement until 30th June 2011 Aerial Overview Lake Victoria Source of the Nile Railway Bridge Kampala -Jinja Highway Sluice gate Nalubaale Power Station Canal Spillway on Kiira Power Stati Eskom Uganda Limited (EUL) Nalubaale Power House Kiira Power Station Introduction and background • Prior to year 2001 Uganda had a vertically integrated power utility, Uganda Electricity Board, responsible for power generation, transmission and distribution of electricity. No regulatory framework was in place • Uganda Electricity Generation Company Limited was born out of the de-regulation of the electricity industry in Uganda Introduction Cont’d • De-regulation was motivated by among other reasons, the need to improve service delivery, increasing electrification rate and as a way of increasing accountability and the desire to provide a fertile environment for investment in this critical industry. Introduction Cont’d • Prior to de-regulation power industry was characterised by frequent power blackouts, trips and dwindling plant capacity and high operating costs. Nalubaale and Kiira Power Stations • Installed Capacity Nalubaale 10 X 18MW= 180MW-Vertical Shaft Kaplan Units • Ist unit commissioned in 1954. All units uprated and refurbished in between 1992- 1998-Uprated from 15MW to 18MW each • Installed Capacity Kiira 5 X 40MW= 200MW- Vertical Shaft Propeller Units • Total Installed Capacity For Complex= 380MW • Peak Generation currently 217MW due to hydrological Constraints Nalubaale and Kiira Power Stations Nalubaale PS Kiira PS Rated 18.9 20.8 Head (m) Specific 19.8 18.02 water consumpti on factor (m3/kWh) Previous Planning Philosophy • Uganda Electricity Generation Company Limited (UEGCL) being a parastatal was not bound by any Power Purchase Agreement. • UEGCL had a time based planning philosophy • UEGCL declared installed capacity and were paid based on same. • UEGCL’s planning was based on OEM’s recommendations provided soon after rehabilitation Previous Planning Philosophy • UEGCL were in charge of the complex for slightly more than 2 years during which time they used a job card system for managing routines and defects Eskom’s Planning Methodology • Time and condition based • Microsoft access based deviation management system was established • Deviation management system which is still in place is like a manual (s.c.a.d.a) system • Plant history developed by the creation of the centralised documentation center. Eskom’s Planning Methodology • Plant history so developed was key as it enabled proper trending of critical plant parameters and performance of plant. • Plant history was also utilised to kick start plant intervention programs with a view to stimulate continuous improvement. • 10 year Technical Plan and Life of Plant Plans developed. • System Engineering and modification programs established Maintenance Philosophy • 36 monthly cycle-maintenance outage- 30days • 18 monthly cycle-detailed inspection- 15days feeds into 36 Monthly cycle maintenance • 6 monthly cycle-1day routine • Using condition monitoring schemes installed, maintenance outages are effected before breakdowns Maintenance Planning and Implementation • Outage management procedure in place • Pre and post outage planning meetings • KKS plant break down system used for physical assets identification. • Work packages-for standardisation-doing things right first time. • Annual plan submitted to system operator 120 days before the following year. • Annual plan takes into account outage scheduling Power Generation Performance Indicators • The following were and are still being measured on a monthly basis in order to guide plant performance and ensure service delivery; Power Generation Performance Indicators • Plant Availability • Plant Reliability • Unplanned Automatic Grid Separations • Planned Outage Rate • Forced Outage Rate (including Mode change failures) • Plant Load Factor • Plant Efficiency Plant Availability Benchmarks Availa Company Country bility Mighty River New Power Zealand 92.4% New Meridian Energy Zealand 94.0% British Columbia Hydro Canada 96.4% Eskom Uganda Ltd Uganda 96.0% Intervention measures employed to achieve performance • replacement of dc systems • modification of protection schemes • modification of governing systems • installation of vibration monitoring equipment • installation of partial discharge scheme • transformer replacement • circuit breaker replacement • surge arrestors replacement Intervention measures employed to achieve performance • System engineering including in-depth incident investigations. • Standardisation of maintenance tasks and procedures • Enforcement of statutory maintenance • Training and development including exposure programs KGRTC & Eskom SA • Performance management. EUL’S Contribution to the Economy • Capital investment in projects to date amounting to USD 10Million • Technological Transfer • Revenue to the Government, ranked among the first 100 on the National Tax Payers list. • Employment – Current Total Manpower = 115, with only 3 expatriates. • Training opportunity – graduate trainees & artisan/ operator trainees • Reduction in Government expenditure. • CSR programs – HIV/AIDS, tree planting Challenges---Nalubaale Power Station • Alkaline Silicate Reaction (ASR) • Age related failures • Unknown condition of underwater structures • Hybrid Technology (Old and new technology in co-existence) • Alignment problems caused by ASR • Water hyacinth • Obsolescence Business Challenge • Change management from a parastatal setting to a private sector setting whilst embedding Eskom practices. Challenges---Kiira Power Station • Hybrid Technology from different OEMs • Premature failures e.g lifting equipment • Rotor Earth faults caused by under design of cable by a ‘reputable’ contractor • User unfriendly designs which unnecessarily elongate outages • Vibrations on 2 out of 5 units • Water hyacinth Problems caused by Water Hyacinths Universal Problems • Poor hydrology • System instability Performance Outlook • Conjunctive operation with downstream power plants. • Commissioning of an integrated computerised maintenance management system that relates to functional areas of the business. • Increased plant optimisation Performance Outlook • Improvement in manpower utilisation • Increased cost effectiveness • Further improvement in service delivery • Focus on quality assurance • Increased focus on risk management The End • Thank You • [email protected] • Website http://www.eskom.co.ug.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    39 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us