The Philippine PPP Program

The Philippine PPP Program

The Philippine PPP Program 2011 CAPACITY PROJECT POLICY PROJECT PDMF BUILDING AWARDED INITIATIVES MILESTONES INITIATIVES 1 Project Reviewed Established the Daang Hari- Trained 54 Awarded: RA 7718 PDMF ; SLEX Link Road National Daang Hari- (BOT Law) PDMF Board Project/MCX Agencies, SLEX Link and its IRR approved awarded to Ayala 19 Regional Line Road Project/ 10 projects for Corporation. It is Agencies, Muntinlupa- PDMF the first PPP 127 LGUs and Cavite support project awarded 10 GOCCs Expressway under the (MCX) Aquino Administration (December 22, 2011) 3 2012 CAPACITY PROJECT POLICY PDMF PROJECT MILESTONES BUILDING AWARDED INITIATIVES INITIATIVES 1 Project • Revised IRR of the Amended 15 PDMF • Rolled-out eight (8) projects 6 Major Training Awarded: BOT Law (October 2012) applications (December 2012): Events PPP for School approved • NAIA Expressway Phase II Infrastructure • Issued Executive Order 78 or • PPP for School Infrastructure 245 Training Phase I the Alternative Dispute Phase I (PSIP I) Project Participants (PSIP I) Project Resolution (ADR) • LRT Line 1 Cavite Extension Mechanism(July 4, 2012) and O&M • Modernization of the • Single Borrower’s limit Philippine Orthopedic Center extended to 3 years (BSP • Rehabilitaion, Operation and Circular No. 700, series of Maintenance of the Angat 2010,) Hydroelectric Powerplant Auxiliary Turbines 4 & 5 • PPP for School Infrastructure Phase II (PSIP II) Project • Automatic Fare Collection System • MCIA New Passenger Terminal Building 4 2013 CAPACITY PROJECT POLICY PROJECT PDMF BUILDING AWARDED INITIATIVES MILESTONES INITIATIVES 3 Projects Awarded : Issuance of 22 PDMF 48 projects in the 1,476 NAIA Expressway Executive projects pipeline participants Phase II Project, the Order 136; approved trained PPP for School established PSIP Phase II on PPPs Infrastructure Phase II the PPP Contract Signing (PSIP II) Project, and Governing the Modernization of Board Groundbreaking the Philippine of PSIP I Orthopedic Center construction Project 5 2014 CAPACITY PROJECT POLICY PROJECT PDMF BUILDING AWARDED INITIATIVES MILESTONES INITIATIVES 3 Projects Awarded: 7 policy circulars 33 PDMF Creation of the Capacitating 716 Automated Fare issued approved Technical elected Collection System projects Working Group to officials and staff (AFCS), Mactan-Cebu Issuance of the fast-track from International Template PPP Expansion the appraisal of 93 LGUs Airport (MCIA) Code for LGUs of PPP projects Passenger Terminal the PDMF Building & the LRT PPP Act was Panel of Designation of the Providing training Line 1 - Cavite submitted to Consulting PPP to 300 Extension the House of Firms Center as the ICC- IAs (1,272 Operation & Representatives CC individuals) Maintenance and Senate Secretariat for all PPP projects Submitted 6 policy drafts to PPPGB Drafted the IRR for EO 78 6 2015 CAPACITY POLICY PROJECT AWARDED PROJECT MILESTONES BUILDING INITIATIVES INITIATIVES 4 Projects Awarded: 6 Policy Circulars • Opening of the Daang Hari 49 Capacity Building Southwest Integrated issued SLEX-Link Road Project Activities Transport System, by the PPPGB (Muntilupa-Cavite Cavite-Laguna Expressway Project) 194 Capacitated Expressway (CALAx) • Completion of classrooms Institutions Projects, South under PSIP I Integrated Transport • Full System Acceptanceof 1388 Trained SystemProject, AFCS project Participants Bulacan Bulk • Groundbreaking of the Water Supply Project) Mactan-Cebu International Airport (MCIA) passenger Terminal with President Aquino • 14 projects under procurement • 39 projects in the pipeline (excluding awarded projects) 7 8 What they say about the Program The Philippines moves up to join the developed group of countries in this study (it was classified as an emerging country in “the 2011 study). By finishing in seventh position, it is among those which have Best Central Government improved the most. It recorded the most PPP Promoter improved regulatory and institutional Partnerships Awards 2014 frameworks and is one of the leading countries in the study for improved investment climate and financial facilities. Asia-Pacific Grantor of the Year ” IJGlobal Awards 2014 PH: Most-improved in Asia- Pacific for PPP Readiness PPP Agency of the Year INFRASCOPE 2014 The ASSET Triple A Asia Infrastructure Awards 9 PPPs are hard, there is no doubt about that. Bidding for PPP actually cost a lot of money. The Philippine government has awarded over 10 PPP projects and have another 14 in the pipeline, that’s a magnificent achievement. Show me any other ASEAN neighbor who has done that. There is none. So the Philippines in the region is viewed as sort of best in class in traversing their PPP agenda and this current government is very supportive of that and will continue to be. Mr. Anthony Weymouth Minister-Counsellor and Senior Trade Commissioner Australian Embassy in the Philippines Philippine Star, January 26, 2016 Thank You! 8th Floor One Cyberpod Centris, EDSA Cor. Quezon Ave. Quezon City Trunkline: 709 4146 www.ppp.gov.ph www.facebook.com/PPPCenter.Philippines https://twitter.com/PPP_Ph.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    13 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us