RESUME KRISHNA PADA DAS BALLY, HOWRAH. CONTACT: (MOBILE) +91 9073329408 E-mail: [email protected] PERSONAL PROFILE: Presently associated with Simplex Infrastructures Limited as a Dy.Manager (QS) at Kolkata and looking after Overseas Tendering as well as QS and Billing of ongoing projects as and when required for overseas operation. Previously I had worked as a Billing Engineer (Dy, Manager) at Jharsuguda for NCC Limited in a Township Project Under Odisha Power Generation Corporation. Prior to this assignment I worked in the tender department in Qatar for six years under Simplex Infrastructures Limited. Apart from this I had worked successfully around 10 yrs. in different reputed construction companies in various types and magnitude of construction projects India. OBJECTIVE : To work with integrity and Seeking a challenging and dynamic career in a company where I can enhance my knowledge and explore my skills for the company’s best. PROFICIENCY IN DESK WORK COMPRISES OF: • Preparation of Bids/offers both Commercial & Technical along with Compliance • Coordination of Projects • Total Cost Estimation of the project before execution. • Vendor Negotiation and Finalization. • Billings – Client & Sub-Contractor • Planning & Scheduling for project • Estimation of quantity, Preparing of BBS. • Periodical indent generation and Stores Reconciliation. TOTAL EXPERIENCE : 21 YEARS CURRENT COMPANY : SIMPLEX INFRASTRUCTURES LIMITED CURRENT LOCATION : KOLKATA NOTICE PERIOD : ONE MONTH NATIVE PLACE : BALLY, HOWRAH. REASON FOR CHANGE : FOR BETTER OPPORTUNITY. EDUCATIONAL QULIFICATION: GENERAL :- a) Passed Madhyamik Pariksha in 1st Div. 64% In the year 1992 b) Passed H.S. Examination in 2nd Div. (57.3%) In the year 1994 PROFESSIONAL:- Passed Diploma in Civil Engineering in the year of 1998 Under West Bengal State Council of Technical Education. with 72.7% Marks Passed B. Tech (CIVIL) in the year of 2019 under Maulana Abul Kalam Azad University of Technology , with Grade Point 7.37 Page 1 of 8 OTHERS: - Successfully Completed the online certification course of Concrete Tecnology from National Programme for Technology Enhanced Learning (NPTEL) under IT Delhi COMPUTER SKILLS: Experience in working in computer environment with a detail knowledge of using MS Office software. Experience in working with ‘Primavera P6 planning package Experience of using Auto CAD software Experience of using ERP software PROFESSIONAL SKILL: • Tendering, Billing, Planning, Estimation, Quantity Surveying, Site Execution. PROJECT EXPOSURES: Sept, 2015 – Till date • Designation : Dy. Manager (QS) • Company : M/S Simplex Infrastructures Limited. • Job Location : Regional Office, Kolkata • Job Profile : Tendering, QS and Billing related work as required • Responsibilities in brief : Preparation of Commercial & Technical proposal for overseas tender submission. To Study the tender documents, drawings, specifications and understand the tender requirements. Sending Clarification to Client to clarify the Discrepancies of drawing and BOQ if any. To submit techno-commercial bid within the time frame. Sending Enquiry to the approved vendors to get the price of special Items. Receiving the Prepared Proposal from Dubai tender cell, verifying the same and submitting the Report to the higher management with Comments. Reviewing the progress of ongoing overseas projects and submission the report to the Overseas Director with Comments. Finding out the Provisional Variation item, preparation of cost variation and submission to the client. June, 2014 – August, 2015 • Designation : Dy. Manager (QS) • Company : M/S NCC Limited • Job Location : IB Thermal Power Plant, Banhar Pali Jharsuguda, Odisha. Page 2 of 8 • Project : New Construction and renovation in existing Township at IB Thermal Power Station (1st Phase) at Bhanharpali (Jharsuguda) in the State of Odisha • Scope of Work : Construction and Renovation of Different type of apartment, Auditorium, Indoor Sports Complex, Guest House, School, Library, Filling Station, Club House, Road network, External Water Supply System, External Sewerage System External Electrification, Wifi, AC, Lift, Fire Protection System, Solar power system etc. • Main Client : Odisha Power Generation Corporation Limited (OPGCL) • Responsibilities in brief : Preparation of RA Bill and checking with Client Reconciliation of Materials Attending Weekly & Monthly Progress review Meeting Coordinating with the juniors and distributing the job responsibilities as follows : a) Sending DPR (Internal & External) b) PR(Purchase Requisition) raising for material procurement for project c) PRW (Piece Rate Work) Bill in ERP System d) Preparation of BBS e) Quantity Work out from Drawing f) Preparation of weekly progress Report g) Preparation of monthly progress Report (Internal and External) h) Sending RFD (Request For Decision) to the Client for discrepancies of BOQ and Drawings if any. i) Preparation of monthly planning and review the progress in weekly basis. j) Collecting Drawing from client and maintain the register k) Maintain the Hindrance Register l) Maintain the Correspondence File Reviewing all the above responsibilities and advising the juniors for further proceeding. Reporting the top management with hindrances/ bottlenecks attached with project activities. August, 2008 – June, 2014 • Designation : Quantity Surveyor • Company : Simplex Infrastructures Ltd. • Job Location : Branch Office at Doha, State of Qatar • Department : Tender • Responsibilities in brief : Providing assistance to the Senior Estimator in completing cost estimates Preparation of Commercial & Technical proposal for tender submission. Study the tender documents, drawings, specifications and understand the tender requirements. Sending Clarification to Client to clarify the Discrepancies of drawing and BOQ if any. Taking out quantities from various drawings and comparing with the BOQ. Study & review tender documents & drawings. Preparing BOQ according to the Given Drawing. Page 3 of 8 Sending Enquiry to the approved vendors to get the price of special Items. Making Drawing by AutoCAD to obtain the details. Preparation of Man Power Histogram, Progress S-Curve, Organisation Chart for Technical Submission • March 2008 - August 2008 • Designation : Engineer • Company : M/S Kirloskar Constructions & Engineers Limited • Job Location : Site at NTPC Farakka, West Bengal, India. • Project : CW System and Offsite Area Civil Works Package at NTPC, Farakka. • Scope of Work : Construction of i) 500 dia 80 ton Capacity pile work ii) 600 dia 140 ton Capacity pile work iii) CW System of Pump House, iv) CW Fire water Tank. v) CW Channel, vi) WBM Road • Main Client : National Thermal Power Corporation , Farakka. • Responsibilities in brief : Responsible for progress of piling works and construction of CW Pump House, CW Channel, Road work including Culvert etc. Coordination with contractor for preparation and monitoring of Master construction program. Coordination with Sub-ordinate and sub Contractor to accelerate the progress of all construction activities. Preparation of Client and Contractors Bill. Reconciliation of Steel, cement and other materials used for construction and submit with every client Bill. September 2006 to March 2008 • Designation : Engineer • Company : P. K. G. Construction (P) Ltd. • Job Location : Site at Khardah, West Bengal, India. • Project : Piling & Civil Construction work including 60 m Height Chimney by Slip forms at Sinter Plant Project under Electrosteel Castings Limited, Khardah, West Bengal, India. • Scope of Work : i) 500 dia 32 m long pile work. ii) Sinter Shop iii) Proportioning Shop iv) 10 m Dia, 60 m height Concrete Chimney by Slip form Page 4 of 8 • Main Client : Electrosteel Castings Limited • Responsibilities in brief : Served as an In-Charge in Piling work, 60m Height Slip form Chimney, Proportioning Shop and Sinter Shop for the Project at the Courtyard in Khardah under West Bengal Electro Steel Castings Limited. Preparing Project Planning & Schedule in Excel format. Responsible for progress of construction works at site. Co-Ordination with Client (ECL) to achieve the target completion and handing over activity and attending meetings with high officials to monitor the completion of the job. Coordination with contractor to prepare and monitor the Master construction program. Preparing BBS Man and materials management with day by day progress in all respect to minimize loop holes in progress schedule. Preparation of Client Bill. Reconciliation of Steel and Cement and other materials used for construction and submit with every client Bill. Claim extra items and submitting necessary analysis for the same December 2005 to August 2006 • Designation : Assistant Engineer. • Company : P. K. G. Construction (P) Ltd. • Job Location : Site at Salt Lake, West Bengal, India. • Project : Construction of G+3 Storied Residential Cum Office Building at Salt Lake Kolkata. • Main Client : P. K. G. Construction (P) Ltd. • Responsibilities in brief : Complete Execution of G+3 Residential building including all finishing, sanitary, plumbing and landscaping work. Preparation of Sub contractors’ bill Preparation of BBS for construction. Reconciliation of Steel and Cement and other materials used for construction every month and send report to HO Management. November 2004 to December 2005 • Designation : Assistant Engineer. • Company : P. K. G. Construction (P) Ltd. • Job Location : Site at Belur, Howrah, West Bengal, India. • Project : Tension Leveller
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages8 Page
-
File Size-