Annual Report of the Charles River Basin Commission

Annual Report of the Charles River Basin Commission

Digitized by the Internet Archive in 2010 with funding from Boston Library Consortium Member Libraries http://www.archive.org/details/annualreportofch71909yerx Public Document No. 71 SEVENTH ANNUAL REPORT Charles Eiver Basin Commission. December 1, 1909. BOSTON: WEIGHT & POTTEE PEINTING CO., STATE PEINTEES, 18 Post Office Square. 1910. Approved by The State Board of Publication. CONTENTS. PAGE Realization of a Popular Demand, . 1 Early Completion of the Work Predicted, 2 Land Improvements Progressing Favorably, 2 I. Cost of the Work, 3 II. Apportionment of the Cost, . 3 III. The Effects of the Charles River Dam upon the Land Bordering on the Basin, IV. The Effects of the Dam upon the River and Its Uses Passenger Traffic on the Basin in Summer, . 10 Organization and Administration, . 10 (a) The Commission, Officers and Employees, 10 (6) Offices and Buildings, 11 VI. The Dam, . 11 VII. The Locks and Sluices, 12 VIII. The Lock-gate Houses, 13 IX. The Stable and Boat-house, 13 X. Open Shelter on the Dam, 13 XI. The Fens Gate-house, . 13 XII. How the Lock and Drawbridge are Operated, 14 XIII. Rules for the Use of the Lock, 15 XIV. The Boston Embankment, 15 XV. The Craigie Temporary Bridge, 16 XVI. The Marginal Conduits, 17 XVII. Dredging and Pile-driving at the Wharves on Broad and Lechmere Canals, ...... 17 XVIII. Dredging to Watertown and to the Newton Shore, 18 XIX. Elimination of Malarial Mosquitoes, 18 XX. The Construction and Leasing of Conduits for Wires 19 XXI. Legislation in 1909, 19 XXII. Legislation Recommended, 19 XXIII. Litigation, . 21 XXIV. Important Records, 21 XXV. Contracts, 22 XXVI. Hearings, Meetings and Conferences, 22 XXVII. Reports Issued by the Commission, 22 XXVIII. Statement of Expenditures and Receipts, 22 Report of the Chief Engineer, 28 Organization, 28 Dam and Lock, 33 Lock-gate Houses, 34 Lock-gates, 35 Roadway, 36 Drawbridge, 37 Operation of Lock and Drawbridge, 37 IV CONTENTS. Report of the Chief Engineer — Concluded Dam and Lock — Concluded. PAGE Heating Plant, 38 Sluices, 39 Earth Filling, . 40 Retaining Walls, 40 Surfacing the Park Area, . 41 Conduits for Electric Wires, 41 Fences, .... 42 Stable and Boat-house, 42 Miscellaneous, 43 Temporary Bridge, 43 Boston Marginal Conduit, 44 Submerged Outlets, 44 Fens Gate-house, 44 Three-inch Pump at Fens Gate-house 45 Boston Embankment, 46 Surfacing the Embankment, 46 Fence along the Embankment, 47 Cambridge Marginal Conduit, 47 Dredging in the Basin, . 48 Broad and Lechmere Canals, 49 Elimination of Mosquitoes, 49 Breaking Ice in the Basin, 49 Plans for Land Takings, 50 Upland Flow of the Charles River, 50 Traffic Through Draw of Craigie Bridge and of Temporary Bridge 54 Miscellaneous Engineering Work, 54 Contracts, .... 55 Appendix A — Chapter 465 of the Acts of the Year 1903, Chapter 107 of the Resolves of the Year 1904, Chapter 65 of the Acts of the Year 1905, . Chapter 158 of the Acts of the Year 1906, Chapter 368 of the Acts of the Year 1906, Chapter 402 of the Acts of the Year 1906, Chapter 404 of the Acts of the Year 1907, Chapter 445 of the Acts of the Year 1908, Chapter 633 of the Acts of the Year 1908, Chapter 175 of the Acts of the Year 1909, Chapter 286 of the Acts of the Year 1909, Chapter 524 of the Acts of the Year 1909, Appendix B — Specimen of the Distribution Voucher Used by the Commis sion, ....... Appendix C — Contracts made and pending during the Year ending Nov. 30 1909, ILLUSTRATIONS. Dam — Outlet of Sluices. Two Gates Wide Open, 6 ft. Head, . Frontispiece. Dam — View from Tower of Lower Lock-gate House, Showing Roadway Construction, ........... 12 12 Dam — Harbor Wall, Complete Except Coping, . .... Dam — Basin End of Sluices, ........ 40 CONTENTS. PAGE Dam — View from Tower of Lower Lock-gate House, 40 Dam — Constructing Harbor Wall, 40 Lock — Rest Pier at Upper End, . 12 Lock — Lower Gate-house, 12 Lock — Upper Gate-house, 34 Drawbridge — Operating Machinery, 36 Dredging Basin — Below Galen Street, Watertown, Looking Down-stream 8 Dredging Basin — Above Galen Street, Watertown, Looking Up-stream, 48 Dredging Basin — Filling above Watertown Arsenal, 48 Old River Wall near Berkeley Street, ...... 46 Boston Embankment — Looking Down-stream from Charlesgate West, 14 Boston Embankment — Looking Up-stream from Cambridge Bridge, 46 ®t)e OlommomDealtt) oi iltaBsactjusette. SEVENTH REPORT OF THE CHARLES RIVER BASIN COMMISSION. To His Excellency the Governor and the Honorable Council of the Commonwealth of Massachusetts. The Charles River Basin Commission has the honor to make the following report of its proceedings for the fiscal year ending Eov. 30, 1909. As required by law, the Commission filed, on Jan. 5, 1910, the statement printed herewith of its expenditures and receipts, together with an abstract of its doings. This will be the last report of the Commission for a full year. An additional and final statement will be made of the Com- mission's doings for the seven months of the current year ending June 30, 1910. As provided in the original Charles River Basin Act and in chapter 524 of the Acts of 1909, the care and control of the Charles River Basin will pass to the Metropolitan Park Com- mission on July 1, 1910, when this Commission will cease to exist. Realization of a Popular Demand. The location of the main Basin is in the region known as the Back Bay of Boston, but lest any one, because of this fact, erroneously assume that the water park which the Charles River Dam creates is merely a Back Bay improvement, the Commission deems it wise to give something more than a formal statement concerning the project. From residents of the Back Bay came practically the only opposition which was encoun- tered by the seven thousand petitioners who endorsed the proj- ect in 1901. Much good will be derived from this work by the 2 CHARLES RIVER BASIN COMMISSION. [Jan. people who reside on the shores of the Basin, although a few of them are still inclined to the contrary opinion ; but the chief benefit of the water park will accrue to the overcrowded popu- lation of the West End, the North End, the South End, Charles- town and East Cambridge. To those who are familiar with the conditions in these localities, the realization of this project, which had official endorsement as far back as the inaugural of Governor Andrew in 1861, will be most gratifying. The citizens of Watertown and Newton and those of Boston and Cambridge living near the river above the main Basin will also profit by the new conditions. As was stated in the brief for the petitioners before the Committee on Charles River Dam, nearly 500,000 people living in the valley of the Charles may expect to have their health and happiness measurably enhanced by the conversion of what had become a foul and unsightly tidal estuary into an unsurpassed water park, similar in plan to the Alster Basin at Hamburg, Germany, but vastly greater in size and in possibilities of future development. Moreover, owing to its central location, a large proportion of these people who dwell in the tenements of Boston may reach and enjoy this Basin, both in summer and in winter, without even the expenditure of a car fare. To no other metropolitan city in America has nature given the opportunity to develop such a beauty spot in its midst. Early Completion of the Work predicted. The Commission appears to have been safe in its prediction of last year, that the Dam and its appurtenances would be sub- stantially completed by July 1, 1910. During the twelve months from Dec. 1, 1908, to Nov. 30, 1909, the Commission was able to advance its work in all de- partments with great rapidity, owing to the facility given by the constant water level established by means of the shut-off dam. A sufficient force was employed to keep the work moving at the same time at many points along the river. Land Improvements progressing favorably. Although the Commission was able, as early as October, 1908, to establish the permanent level of the Basin, this gave the public only a part of what was needed for the enjoyment of the 1910.] PUBLIC DOCUMENT — No. 71. 3 water park. The offensive mud flats were done away with, but an attractive shore on the Boston side of the lower Basin was still lacking. During the past year the Commission was able to complete the greater part of its work on the Boston Embankment, which, already in use by thousands of pedestrians, seems destined to become the most popular promenade in the city. It virtually extends the Charlesbank Park from the new Cambridge Bridge to Charlesgate West, and will be described in detail later in this report. I. Cost of the Work. The Commission's total expenditures from the beginning of its work to the close of the fiscal year were $3,597,727.80, which is less than half a million dollars in excess of the cost of the last bridge and approaches between Boston and Cambridge. Con- sidering the fact that this water park, with its 17% miles of shore line, besides supplying an important link in the park systems of the Metropolitan District and of Boston and Cam- bridge, is so accessible to thousands of citizens who most need the parks, it seems that the results will fully justify the ex- penditure. II. Apportionment of the Cost. To aid the commission appointed by the Supreme Judicial Court, under authority of chapter 419 of the Acts of 1899, to apportion the expense of the Charles River Basin work among the cities and towns of the Metropolitan Park District, the Commission has from the beginning kept detailed accounts of all the expenditures chargeable to the various parts of the work.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    176 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us