MGH Clinical and Campus Services Building Project-Notification Form

MGH Clinical and Campus Services Building Project-Notification Form

Institutional Master Plan Notification Form Project Notification Form 2019 IMP PROJECTS Submitted to: Boston Planning & Development Agency One City Hall Square Boston, MA 02201 Submitted by: Massachusetts General Hospital 55 Fruit Street Boston, MA 02114 Prepared by: Epsilon Associates, Inc. 3 Mill & Main Place, Suite 250 Maynard, MA 01754 In Association with: NBBJ Leggat McCall Properties Goulston & Storrs VHB February 20, 2019 Institutional Master Plan Notification Form Project Notification Form 2019 IMP PROJECTS Submitted to: Boston Planning & Development Agency One City Hall Square Boston, MA 02201 Submitted by: Massachusetts General Hospital 55 Fruit Street Boston, MA 02114 Prepared by: Epsilon Associates, Inc. 3 Mill & Main Place, Suite 250 Maynard, MA 01754 In Association with: NBBJ Leggat McCall Properties Goulston & Storrs VHB February 20, 2019 Table of Contents Table of Contents 1.0 INTRODUCTION AND GENERAL INFORMATION 1-1 1.1 Introduction 1-1 1.2 Mission and Objectives 1-5 1.2.1 Mission & Guiding Principles 1-5 1.2.2 Mission in Practice 1-6 1.3 Community Benefits 1-8 1.4 Job Training and Education 1-16 1.5 Employment 1-18 1.6 Economic Benefits 1-18 1.7 Facilities 1-19 1.7.1 Properties Owned in Boston 1-19 1.7.2 Properties Leased in Boston 1-25 1.8 Project Team 1-27 2.0 PROPOSED IMP PROJECTS 2-1 2.1 Program Need 2-1 2.1.1 Clinical Building 2-1 2.1.1.1 Clinical Space Needs 2-2 2.1.1.2 Operational Improvements 2-3 2.1.2 Campus Services Building 2-4 2.2 Project Sites 2-4 2.3 Proposed IMP Projects 2-7 2.3.1 Clinical Building 2-7 2.3.1.1 Campus Connections 2-11 2.3.2 Campus Services Building 2-14 2.3.3 Schedule 2-15 2.3.4 Public Benefits 2-15 2.4 Campus Improvement Projects 2-15 2.5 Campus Maintenance 2-17 2.6 Potential Future Projects 2-17 2.7 Campus Expansion 2-17 2.8 Zoning 2-17 2.8.1 Existing Zoning 2-17 2.8.1.1 Existing MGH IMP 2-17 2.8.1.2 Nashua Street Facilities 2-20 2.8.1.3 Charles River Plaza 2-21 5043/MGH/IMPNF-PNF i Table of Contents Epsilon Associates, Inc. Table of Contents (Continued) 2.8.1.4 Charlestown Navy Yard 2-22 2.8.2 Future Zoning 2-23 2.8.2.1 Main Campus 2-23 2.8.2.2 Nashua Street Facilities 2-24 2.3.2.3 Charlestown Navy Yard and Charles River Plaza 2-24 2.9 Anticipated Permits and Approvals 2-25 2.10 Legal Information 2-26 2.10.1 Legal Judgments Adverse to the Proposed Projects 2-26 2.10.2 History of Tax Arrears on Property 2-26 2.10.3 Site Control / Public Easements 2-26 2.11 Public Participation 2-27 3.0 ASSESSMENT OF DEVELOPMENT REVIEW COMPONENTS 3-1 3.1 Transportation 3-1 3.1.1 Introduction 3-1 3.1.2 Existing Transportation Conditions 3-1 3.1.2.1 Pedestrian Facilities 3-1 3.1.2.2 Bicycle Accommodations 3-4 3.1.2.3 Transit 3-11 3.1.2.4 Roadway Network 3-16 3.1.2.5 Loading/Service 3-20 3.1.2.6 Ambulances 3-24 3.1.2.7 Taxicabs 3-24 3.1.2.8 Transportation Network Companies (TNCs) 3-24 3.1.2.9 Parking 3-28 3.1.2.10 Transportation Demand Management 3-33 3.1.3 Trip Generation 3-35 3.1.3.1 Unadjusted Trip Generation 3-36 3.1.3.2 Person Trip Generation 3-37 3.1.3.3 Mode Shares 3-38 3.3.3.4 Adjusted Trip Generation 3-39 3.1.4 North Station Area Mobility Action Plan 3-39 3.2 Wind 3-40 3.3 Shadow 3-40 3.4 Daylight 3-40 3.5 Solar Glare 3-40 3.6 Air Quality 3-40 3.7 Noise 3-41 3.8 Stormwater/Water Quality 3-42 3.9 Solid and Hazardous Waste 3-42 5043/MGH/IMPNF-PNF ii Table of Contents Epsilon Associates, Inc. Table of Contents (Continued) 3.9.1 Hazardous Waste 3-42 3.9.2 Operational Solid and Hazardous Wastes 3-42 3.10 Geotechnical and Groundwater Impacts 3-42 3.11 Flood Zones and Wetlands 3-43 3.12 Construction Impacts 3-43 3.13 Rodent Control 3-44 3.14 Wildlife Habitat 3-44 3.15 Tidelands 3-44 3.16 Sustainability 3-44 3.16.1 Clinical Building 3-47 3.16.2 Campus Services Building 3-54 3.17 Climate Change Preparedness 3-58 3.17.1 2019 IMP Projects 3-58 3.17.2 MGH’s Boston Properties 3-60 3.18 Urban Design 3-63 3.18.1 Land Use 3-63 3.18.2 Scale and Massing 3-64 3.18.3 Circulation 3-64 3.18.4 Open Space and View Corridors Analysis 3-69 3.19 Historic and Archaeological Resources 3-69 3.19.1 Historic Resources in the Project Site 3-69 3.19.2 Historic Resources in the Project Vicinity 3-73 3.19.3 Archaeological Resources Within the Project Site 3-74 3.19.4 Consistency with Historic Reviews 3-74 3.19.4.1 Boston Landmarks Commission 3-74 3.19.4.2 Massachusetts Historical Commission 3-74 3.20 Infrastructure 3-76 3.20.1 Sanitary Sewer 3-76 3.20.1.1 Existing System Conditions 3-76 3.20.1.2 Future Wastewater Generation and System Modifications 3-77 3.20.2 Domestic and Fire Protection Water 3-77 3.20.2.1 Existing System Conditions 3-77 3.20.2.2 Future Water Demand and System Modifications 3-78 3.20.3 Storm Drainage 3-78 3.20.3.1 Existing System Conditions 3-78 3.20.3.2 Future Storm Drainage Flows 3-79 3.20.3.3 Consistency with Massachusetts Stormwater Management Standards 3-79 3.20.4 Energy Systems 3-81 3.20.4.1 Existing Electrical System Conditions 3-81 5043/MGH/IMPNF-PNF iii Table of Contents Epsilon Associates, Inc. Table of Contents (Continued) 3.20.4.2 Future Electrical Requirements 3-82 3.20.4.3 Existing Chilled Water System Conditions 3-82 3.20.4.4 Future Chilled Water Requirements 3-82 3.20.4.5 Existing Natural Gas System Conditions 3-82 3.20.4.6 Future Natural Gas Requirements 3-82 3.20.4.7 Existing Steam System Conditions 3-82 3.20.4.8 Future Steam Requirements 3-82 3.20.4.9 Existing Telecommunications System Conditions 3-82 3.20.4.10 Future Telecommunications System Connections 3-82 4.0 COORDINATION WITH OTHER GOVERNMENT AGENCIES 4-1 4.1 Architectural Access Board Requirements 4-1 4.2 Massachusetts Environmental Policy Act (MEPA) 4-1 4.3 Massachusetts Historical Commission 4-1 4.4 Article 85 4-1 List of Appendices Appendix A Climate Change Questionnaires Appendix B Accessibility Checklists List of Figures Figure 1-1 MGH Boston Campuses 1-3 Figure 1-2 Project Sites 1-4 Figure 1-3 Owned and Leased Buildings in Downtown Boston 1-20 Figure 1-4 Owned and Leased Buildings in Charlestown 1-21 Figure 2-1 Project Sites 2-5 Figure 2-2 Massing Model of Projects 2-9 Figure 2-3 Clinical Building Conceptual Massing 2-10 Figure 2-4 Context and Pedestrian Areas 2-12 Figure 2-5 Proposed Connectors 2-13 Figure 2-6 Existing and Future Campus Areas 2-18 Figure 3-1 Main Campus Major Pedestrian Circulation Routes 3-3 Figure 3-2 Charlestown Navy Yard Campus Major Pedestrian Circulation Routes 3-6 5043/MGH/IMPNF-PNF iv Table of Contents Epsilon Associates, Inc. List of Figures (Continued) Figure 3-3 Nashua Street Area Major Pedestrian Circulation Routes 3-7 Figure 3-4 Main Campus Bicycle Parking 3-8 Figure 3-5 Charlestown Navy Yard Campus Bicycle Parking Supply 3-9 Figure 3-6 Nashua Street Area Bicycle Parking Supply 3-10 Figure 3-7 Existing Public Transit 3-12 Figure 3-8 Existing Partners Shuttle Bus Routes 3-17 Figure 3-9 Main Campus Vehicular Circulation 3-18 Figure 3-10 Charlestown Navy Yard Vehicular Circulation 3-19 Figure 3-11 Nashua Street Area Vehicular Circulation 3-21 Figure 3-12 Main Campus Loading/Service Areas 3-25 Figure 3-13 Charlestown Navy Yard Campus Loading/Service Areas 3-26 Figure 3-14 Nashua Street Loading/Service Areas 3-27 Figure 3-15 Existing Parking Supply serving the Downtown Campus (September 2017) 3-29 Figure 3-16 Existing Parking Supply serving the Charlestown Navy Yard Campus (September 2017) 3-32 Figure 3-17 Proposed Open Spaces 3-49 Figure 3-18 Land Use 3-65 Figure 3-19 Existing and Proposed Projects’ Building Heights 3-66 Figure 3-20 Massing Context 3-67 Figure 3-21 Pedestrian and Vehicular Circulation 3-68 Figure 3-22 Area Green Network 3-70 Figure 3-23 View Corridors 3-71 Figure 3-24 Historic Resources 3-75 List of Tables Table 1-1 Employee Statistics (2017) 1-18 Table 1-2 Owned Land in Boston 1-19 Table 1-3 Owned Buildings and Uses 1-22 Table 1-4 Leased Space 1-25 Table 2-1 Buildings to be Demolished 2-7 Table 2-2 Project Program 2-7 Table 2-3 Preliminary List of Anticipated Permits and Approvals 2-25 Table 3-1 Existing Partners Shuttle Service Routes and Ridership Supporting MGH, Fall 2018 3-14 Table 3-2 MGH Loading Areas 3-23 Table 3-3 Existing MGH Main Campus Parking Inventory 3-30 5043/MGH/IMPNF-PNF v Table of Contents Epsilon Associates, Inc.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    187 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us