Torrent Power Limited - Distribution Surat

Torrent Power Limited - Distribution Surat

GUJARAT ELECTRICITY REGULATORY COMMISSION Tariff Order Truing up for FY 2018-19 and Determination of Tariff for FY 2020-21 For Torrent Power Limited - Distribution Surat Case No. 1845 of 2019 31st March, 2020 6thFloor, GIFT ONE, Road 5C, GIFT CITY Gandhinagar-382335 (Gujarat), INDIA Phone: +91-79-23602000 Fax: +91-79-23602054/55 E-mail: [email protected] : Website www.gercin.org GUJARAT ELECTRICITY REGULATORY COMMISSION (GERC) GANDHINAGAR Tariff Order Truing up for FY 2018-19 and Determination of Tariff for FY 2020-21 For Torrent Power Limited - Distribution Surat Case No. 1845 of 2019 31st March, 2020 Torrent Power Limited – Distribution (Surat) Truing up for FY 2018-19 and Determination of Tariff for FY 2020-21 TABLE OF CONTENTS 1 Background and Brief History ..................................................................................... 1 1.1 Background ........................................................................................................... 1 1.2 Torrent Power Limited (TPL) ................................................................................. 2 1.3 Commission’s order for approval of True-up for FY 2015-16 and approval of Multi- Year ARR from FY 2016-17 to FY 2020-21 ........................................................... 2 1.4 Commission’s Order for approval of True-up of FY 2016-17 and Determination of tariff for FY 2018-19 ............................................................................................... 3 1.5 Commission’s Order for approval of True-up of FY 2017-18, Mid-Term Review of FY 2019-20 & FY 2020-21 and Determination of tariff for FY 2019-20 ........................ 3 1.6 Background of the present petition ........................................................................ 3 1.7 Registration of the Current Petition and the Public Hearing Process ..................... 4 1.8 Contents of this Order ........................................................................................... 6 1.9 Approach of this Order .......................................................................................... 6 2 Summary of TPL-D (S)’s Petition ................................................................................ 8 2.1 Introduction............................................................................................................ 8 2.2 Actuals for FY 2018-19 submitted by TPL-D (S) .................................................... 8 2.3 Sharing of gains and losses for FY 2018-19 .......................................................... 8 2.4 Summary of ARR, Revenue at Existing Tariff and Proposed Revenue Gap for FY 2018-19 ................................................................................................................. 9 2.5 ARR, Revenue at Existing Tariff, Revenue Gap and Tariff Proposal for FY 2020- 21 ........................................................................................................................ 10 2.6 TPL-D (S)’s Prayer to the Commission ................................................................ 10 3 Brief outline of Objections raised, Response from TPL-D (S) and the Commission’s View ............................................................................................................................ 12 3.1 Stakeholder’s suggestions / objections, Petitioner’s response and the Commission’s view ..................................................................................................................... 12 4 Truing up for FY 2018-19 ........................................................................................... 31 4.1 Introduction.......................................................................................................... 31 4.2 Energy Sales to the Consumers .......................................................................... 31 4.3 Distribution Losses .............................................................................................. 33 4.4 Energy Requirement ............................................................................................ 33 4.5 Energy Availability ............................................................................................... 34 Gujarat Electricity Regulatory Commission Page v March 2020 Torrent Power Limited – Distribution (Surat) Truing up for FY 2016-17 and Determination of Tariff for FY 2018-19 4.6 Power Purchase Cost .......................................................................................... 38 4.7 Fixed Charges ..................................................................................................... 43 5 Determination of Tariff for FY 2020-21 ...................................................................... 77 5.1 Gap/(Surplus) for FY 2020-21.............................................................................. 77 6 Compliance of Directives .......................................................................................... 83 6.1 Earlier Directives ................................................................................................. 83 6.2 Fresh Directives .................................................................................................. 84 7 Fuel and Power Purchase Price Adjustment ............................................................ 86 7.1 Fuel Price and Power Purchase Price Adjustment ............................................... 86 7.2 Formula ............................................................................................................... 86 8 Wheeling Charges and Cross Subsidy Surcharge .................................................. 88 8.1 Wheeling Charges ............................................................................................... 88 8.2 Cross Subsidy Surcharge .................................................................................... 93 8.3 Additional Surcharge ........................................................................................... 95 9 Tariff Philosophy and Tariff Proposals ..................................................................... 96 9.1 Introduction.......................................................................................................... 96 9.2 Proposal of TPL for increase in Retail Tariffs for TPL-D (S) for FY 2020-21 ........ 96 9.3 Commission’s Ruling on Retail Tariffs for TPL-D (S) for FY 2020-21 ................... 97 COMMISSION’S ORDER ................................................................................................... 99 ANNEXURE: TARIFF SCHEDULE ................................................................................... 101 Gujarat Electricity Regulatory Commission Page vi March 2020 Torrent Power Limited – Distribution (Surat) Truing up for FY 2016-17 and Determination of Tariff for FY 2018-19 LIST OF TABLES Table 1.1: List of Newspapers in which Public Notice was published by the Petitioner .......... 4 Table 1.2: List of Newspapers in which Public Notice for Hearing was published by the Commission .......................................................................................................................... 4 Table 1.3: List of Stakeholders who commented on petition filed by TPL-D (S) ..................... 5 Table 2.1: Actuals Claimed by TPL-D (S) for FY 2018-19 ..................................................... 8 Table 2.2: Summary of Sharing of Gains and Losses for TPL-D (S) for FY 2018-19 ............. 8 Table 2.3: True-up ARR claimed by TPL-D (S) for FY 2018-19 ............................................. 9 Table 2.4: Revenue Gap/ (Surplus) for TPL-D (S) for FY 2018-19 ........................................ 9 Table 2.5 Revenue Gap/(Surplus) of TPL-D (S) for FY 2020-21 ......................................... 10 Table 2.6: Cumulative Revenue (Gap)/Surplus for determination of Tariff of TPL-D (S) for FY 2020-21............................................................................................................................... 10 Table 4.1: Energy Sales for FY 2018-19 for TPL-D (S) ....................................................... 31 Table 4.2: Distribution Losses for FY 2018-19 as submitted by TPL-D (S) .......................... 33 Table 4.3: Energy Requirement for FY 2018-19 for TPL-D (S) ............................................ 34 Table 4.4: Energy Availability (Net) for FY 2018-19 for Ahmedabad & Surat ....................... 35 Table 4.5: RPPO submitted by TPL for FY 2018-19 ............................................................ 35 Table 4.6: UI/Wind Set-off reconciliation submitted by the Petitioner for FY 2018-19 .......... 37 Table 4.7: Approved Energy Availability (Net) for FY 2018-19 for TPL-D (A) and TPL-D (S) 37 Table 4.8: Power Purchase Cost projected by TPL for Ahmedabad and Surat area for FY 2018-19............................................................................................................................... 38 Table 4.9: Break-up of purchase from RE sources for FY 2018-19 ..................................... 41 Table 4.10: Approved Power Purchase Cost for TPL-D (A) and TPL-D (S) for FY 2018-19. 41 Table 4.11: Gain due to reduction in energy requirement for FY 2018-19 claimed by TPL-D (S) ....................................................................................................................................... 42 Table 4.12: Approved gains due to reduction in Distribution Losses for FY 2018-19 ........... 43 Table 4.13: O&M expenses claimed by TPL- D(S) for FY 2018-19

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    130 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us