SUPPORTING REPORT C Water Quality

SUPPORTING REPORT C Water Quality

SUPPORTING REPORT C Water Quality The Study on Integrated Water Management Final Report in the Republic of Bulgaria Supporting Report C Table of Contents Table of Contents ............................................................................................................. i List of Tables ................................................................................................................... ii List of Figures ................................................................................................................. iii List of Annexes ............................................................................................................... iv C WATER QUALITY ........................................................................................... C-1 C.1 General ............................................................................................................... C-1 C.2 Current Conditions of Water Quality ................................................................. C-1 C.2.1 Existing Water Quality Monitoring Networks ...................................... C-1 C.2.2 Water Quality Conditions ..................................................................... C-3 C.3 Current Conditions of Water Quality ................................................................. C-7 C.3.1 Existing Urban and Municipal wastewater Treatment Plants ............... C-7 C.3.2 National Program for Constructing WWTPs ........................................ C-7 C.4 Water Quality Management Plan ....................................................................... C-8 C.4.1 Objectives of the Water Quality Management Plan .............................. C-8 C.4.2 Study Approach ..................................................................................... C-8 C.4.3 Methods of Estimating the Pollution Loads.......................................... C-9 C.4.4 Present Pollution Loads with Pollution Mechanism and Near Future Pollution Loads ................................................................................... C-13 C.4.5 Structural Measures of the Programme of Measures .......................... C-16 C.4.6 Non-Structural Measures of the Programme of Measures .................. C-21 JICA CTI Engineering International Co., Ltd. i Final Report The Study on Integrated Water Management Supporting Report C in the Republic of Bulgaria List of Tables Table C.2.1 Results of the Supplemental Water Quality Survey by JICA - Physico-chemical Parameters and Bacteria ........................................ C-29 Table C.2.2 Results of the Supplemental Water Quality Survey by JICA - Hydro-biological Survey with The Most Dominant Species .............. C-30 Table C.3.1 Existing Municipal Wastewater Treatment Plants in Bulgaria ........... C-31 Table C.3.2 Status of the Construction of New WWTPs ....................................... C-33 Table C.4.1 Major Industries in EABD: Directly Discharging Wastewater into the Rivers or Water Bodies ....................................................................... C-34 Table C.4.2 Major Industries in WABD: Directly Discharging Wastewater into the Rivers or Water Bodies ....................................................................... C-36 Table C.4.3 Major Livestock Farms with their Pollution Loads in EABD ............ C-38 Table C.4.4 Major Livestock Farms with their Pollution Loads in WABD ........... C-40 Table C.4.5 Estimated Pollution Loads by NAM Catchments for EABD under the Present Condition ................................................................................ C-41 Table C.4.6 EABD Summary of Possible Reduction % of BOD Load from Towns/Settlements .............................................................................. C-43 Table C.4.7 WABD Summary of Possible Reduction % of BOD Load from Towns/Settlements .............................................................................. C-44 Table C.4.8 Estimated Quantity of Newly Treated Sewage and Reduction of Wastewater Loss for the High Priority Towns in EABD and WABD C-45 Table C.4.9 Estimated Construction Cost for the Proposed Wastewater Treatment Plants and Sewerage Improvements for the High Priority Towns in EABD and WABD .............................................................................. C-47 Table C.4.10 Estimated Operation and Maintenance Cost for the Proposed WWTPs and Sewer Improvements ..................................................... C-48 List of Figures Figure C.2.1 Location of Physico-Chemical Monitoring Station ........................... C-51 Figure C.2.2 Location of Biological Monitoring Station ......................................... C-52 Figure C.2.3 Normal Maximum Range of BOD5 ................................................... C-53 Figure C.2.4 Normal Maximum Range of COD ..................................................... C-54 Figure C.2.5 Normal Maximum Range of NH4-N .................................................. C-55 Figure C.2.6 Normal Maximum Range of NO3-N .................................................. C-56 Figure C.2.7 BOD 5 and COD in EABD ................................................................. C-57 Figure C.2.8 BOD5 and COD in WABD ................................................................. C-58 Figure C.2.9 Example of Trend Analysis for EABD ............................................... C-59 Figure C.2.10 Example of Trend Analysis for EABD ............................................... C-60 Figure C.2.11 Example of Trend Analysis for WABD .............................................. C-61 Figure C.2.12 Example of Trend Analysis for WABD .............................................. C-62 Figure C.2.13 Hydrobiological Water Quality ........................................................... C-63 Figure C.2.14 Location of Supplemental Water Quality Survey ............................... C-64 Figure C.2.15 Water Quality Class of Maximum Values of Heavy Metals in 2000 .. C-65 Figure C.2.16 Water Quality Class of Maximum Values of Heavy Metals in 2001 .. C-66 Figure C.2.17 Water Quality Class of Maximum Values of Heavy Metals in 2002 .. C-67 Figure C.2.18 Water Quality Class of Maximum Values of Heavy Metals in 2003 .. C-68 ii JICA CTI Engineering International Co., Ltd. The Study on Integrated Water Management Final Report in the Republic of Bulgaria Supporting Report C Figure C.2.19 Water Quality Class of Maximum Values of Heavy Metals in 2004 . C-69 Figure C.2.20 Water Quality Class of Maximum Values of Heavy Metals in 2005 . C-70 Figure C.2.21 Operative and Closed Mines in Bulgaria ........................................... C-71 Figure C.3.1 Wastewater Treatment Plants (WWTP) in the Republic of Bulgaria . C-72 Figure C.4.1 Study Flow on the Programme of Measures for Water Quality Management ....................................................................................... C-73 Figure C.4.2 Present BOD Load in EABD.............................................................. C-74 Figure C.4.3 Present BOD Load from Unit Area in EABD .................................... C-74 Figure C.4.4 Near Future BOD Load in EABD (with under-constructed and tendering WWTPs) ............................................................................. C-75 Figure C.4.5 Near Future BOD Load from Unit Area in EABD (with under-constructed and tendering WWTPs) ........................................ C-75 Figure C.4.6 Present TN Load in EABD ................................................................. C-76 Figure C.4.7 Near Future TN Load in EABD ......................................................... C-76 Figure C.4.8 Present TP Load in EABD.................................................................. C-77 Figure C.4.9 Near Future TP Load in EABD .......................................................... C-77 Figure C.4.10 Present BOD Loads in WABD .......................................................... C-78 Figure C.4.11 Present BOD Loads from Unit Area in WABD .................................. C-78 Figure C.4.12 Near Future BOD Loads in WABD with Under-constructed and Tendering WWTPs ............................................................................. C-79 Figure C.4.13 Near Future BOD Loads from Unit Area in WABD .......................... C-79 Figure C.4.14 Present TN Loads in WABD .............................................................. C-80 Figure C.4.15 Near Future TN Loads in WABD ....................................................... C-80 Figure C.4.16 Present TP Loads in WABD ............................................................... C-81 Figure C.4.17 Near Future TP Loads in WABD ........................................................ C-81 Figure C.4.18 EABD: Co-relation between Present Catchment BOD Load and River BOD Load ................................................................................ C-82 Figure C.4.19 WABD: Co-relation between Present Catchment BOD Load and River BOD Load ................................................................................ C-82 Figure C.4.20 Proposed High Priority Towns for Wastewater Treatment and Improvement of Sewerage Networks in EABD ................................. C-83 Figure C.4.21 Proposed High Priority Towns for Wastewater Treatment and Improvement of Sewerage Networks in EABD ................................. C-84 Figure C.4.22 Proposed High and Medium Priority Towns for Wastewater Treatment and Improvement of Sewerage Networks in EABD ......... C-85 Figure C.4.23 Proposed High and Medium Priority

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    78 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us