Greenpoint Avenue Bridge Improvements Bicycle Safety Enhancements

Greenpoint Avenue Bridge Improvements Bicycle Safety Enhancements

Greenpoint Avenue Bridge Improvements Bicycle Safety Enhancements 2015 New York City Department of Transportation Presented to Brooklyn CB 1 on March 17, 2015 Background • March 2010 DOT proposed safety changes over bridge as part of bridge component rehabilitation, which included • buffered bike lanes • implementation was delayed due to construction and utility work • Existing Greenpoint Ave bike lanes end at Kingsland Ave on Brooklyn side • No connection over Newtown Creek • DOT has received numerous requests for bike facilities on the bridge over the years • Complaints about speeding • Assembly Member Joseph Lentol & Council Member Jimmy Van Bramer requested improvements 2 Project Map Project Route 2015 Project Routes Existing On-Street Bicycle Facility Bicycle Path Potential Route QN CB 2 CB 1 Existing eastbound bicycle lane ends at Kingsland Ave 3 Existing Conditions Limited Visibility Due To Curvature & Elevation Change Two Travel Lanes Queens Bound Two Travel Lanes Brooklyn Bound Median Between Review Av and Kingsland St 4 14-Hour Bicycle Volumes Project Route 2015 Project Routes Existing On-Street Bicycle Facility Bicycle Path Potential Route Bike Count Location June 2014 Weekday: 606 Weekend: 577 QN CB 2 CB 1 June 2014 Weekday: 473 Weekend: 465 *Count conducted 6/17/2014 & 6/21/2014 7am-9pm 5 Existing Conditions Bicycle Riders Stop and Dismount Walk Bike Sidewalk Riding Sidewalk Conflicts 6 Existing Conditions – Brooklyn Side At Kingsland Ave Bridge Approach from Kingsland Ave, Brooklyn 7 Proposed Design – Brooklyn Side At Kingsland Ave Brooklyn Bound Queens Bound Existing Brooklyn Bound Queens Bound Proposed 8 Proposed Design – Mid-Bridge Span Brooklyn Bound Queens Bound Existing Brooklyn Bound Queens Bound Proposed 9 Existing Conditions – Queens Side At Review Ave Bridge Approach from Review Av & Van Dam St, Queens 10 Proposed Design – Queens Side At Review Ave Queens Bound Brooklyn Bound Existing Queens Bound Brooklyn Bound Proposed 11 Draft Design With Peak-Hour Vehicle Volumes Brooklyn Side Draft Design 03.17.2015 750/900 N 850/850 Peak Hour Greenpoint Ave Bridge Vehicle Volumes: Queens AM/PM Side Nov 2014 12 Example of Proposed Design th 39 St Bridge, Queens 13 Summary of Proposal • Bridge Span • Two travel lanes for Queens bound traffic • One travel lane for Brooklyn bound traffic • 6’ curbside bike lanes in both directions with 4’ buffer • Approaches • Two travel lanes in each direction • 6’ curbside bike lanes in both directions • Establishes a connection between the bicycle network in Brooklyn to the expanding network in Queens • Improves bicycle circulation throughout the community and to major employment centers • Improves safety for cyclists by designating space for riding & addressing sight line issues on the bridge • Increases awareness of the presence of cyclists 14 Thank Questions? Yo u For questions contact Queens Borough Commissioner’s Office: (212) 839-2510 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    15 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us