Rail Developmental Works 1

Rail Developmental Works 1

Green Initiatives 1. Revival of water bodies is completed. 2. LED lighting is provided at all Railway stations over Eluru Parliamentary Constituency. u 189-Nuzvid Passenger Train Services Eluru Parliamentary Constituency Details of New Trains/Provision of Stoppage/Extension/Capacity Enhancement provided for Existing Trains in Eluru Parliamentary Constituency Jurisdiction. Shri Narendra Modi Hon’ble Prime Minister New Train Introduced 1. Tr.No.22841/22842 Santragachi – Chennai – Santragachi Express Provision of Stoppage at Eluru RAIL DEVELOPMENTAL WORKS 1. Tr.No.12784/12783 Secunderabad–Visakhapatnam–Secunderabad AC Weekly Express Eluru Parliamentary Constituency Jurisdiction 2. Tr.No.22708/22707 Tirupati–Visakhapatnam–Tirupati Double Decker Tri‐Weekly Express 3. Tr.No.22801/22802 Visakhapatnam–Chennai Central–Visakhapatnam Weekly Express 4. Tr.No.18112/18111 Yesvantpur –Tatanagar Weekly Express 5. Tr.No.22837/22838 Hatia–Ernakulam Humsafar Weekly Express South Central Railway 6. Tr.No.22877/22878 Howrah‐Ernakulam Anthyodaya Weekly Express serving the entire state of 7. Tr.No.22833/ 22834 Bhubaneswar–Krishnarajapuram–Bhubaneswar Weekly Humsafar Express Telangana, major portion 8. Tr.No.12841/12842 Chennai Central–Howrah–Chennai Central Coromandal Express of Andhra Pradesh and considerable portion of Extension of Train Services SOUTH CENTRAL Karnataka, Maharastra 1. Tr.No.17401/17402/17403/17404 Machilipatnam/Narsapur – Tirupati up to Dharmavaram with new Tr. No.17245/17246/17247/17248 states and small parts RAILWAY 2. Tr.No.12775/12776 Kakinada Town–Secunderabad up to Lingampalli of Tamilnadu and 3. Tr.No.12737/12738 Kakinada Port–Secunderabad up to Lingampalli Madhya Pradesh. 4. Tr.No.17243/17244 Rayagada–Vijayawada up to Guntur Eluru Parliamentary 5. Tr.No.17487/17488 Visakhapatnam–Tirupati up to Kadapa Constituency falls under 6. Tr.No.12805/12806 Visakhapatnam–Secunderabad up to Lingampalli Andhra Pradesh State. Entire Railway network of this constituency is being served by South Central Railway. ASSEMBLY SEGMENTS Capacity Enhancement 1. Proposed improvements to surface and 2. Provision of Intermediate Block Signal loading area with concrete surface at Eluru between Pulla – Chebrolu at a cost of `1.92 a n d D w a r a p u d i b e t w e e n G u d u r – crore is completed visakahapatnam with an estimated cost of `1.94 crore Unguturu Road Over / Under Bridges Denduluru Eluru With a view to strengthen safety at Level Crossing gates and to avoid untoward incidents and also to provide seamless journey to road traffic, the following Road under /over Bridges (RuB/RoB) are Polavaram constructed / proposed for construction under Eluru Parliamentary constituency. Chintalapudi Road Over Bridge 3. Proposed for construction of ROB in lieu of LC No.364 between Pulla–Chebrol with an estimated 1. ROB in lieu of LC No.334‐E between Vijayawada– cost of `44.30 crore. Nuzvid Rajahmundry. Sanctioned Cost of `28.46 crore and is completed and commissioned. 4. Construction of RoB between Denduluru – Bhimadolu Stations is under progress. Kaikalur 2. ROB in lieu of LC No.343 between Vatlur–Powerpet stations. Sanctioned Cost of `35.09 crore and is 5. Proposed for 4 lane RoB between Kaikaluru – completed and commissioned. Pallevada Stations. RAIL DEVELOPMENTAL WORKS Passenger Amenities Eluru Parliamentary Constituency Jurisdiction Provision of Passenger Amenities and Station Amenity Amount Status Mandavalli Toilets `1 Lakh Constructed facilities, and its improvements at Kaldhari Toilets `1 Lakh Constructed Railway Stations is one of the most Pallevada Toilets `1 Lakh Constructed Infrastructural Development important aspect of Railway Services. Khaldhari Circulating Area `30 Lakh Developed New Railway Line works Eluru Signages ` 1 crore Proposed New Railway line works from Bhadrachalam‐Kovvur for distance 10 Stations Wi‐Fi `15 Lakh Completed of 151 Kms is proposed at an anticipated cost of `823 crore Eluru 19 CCTVs `0.34 Cr Installed Doubling & Electrification works Eluru 2 Lifts ` 1 Cr Provided Doubling & Electrification works of Vijayawada‐Gudivada‐ Eluru 2 WVMs ‐‐‐ Installed Bhimavaram‐Narasapur, Gudivada‐Machilipatnam & Eluru CIB & TIB ` 1.64 Cr In Progress Bhimavaram‐Nidadavolu for distance of 221 Kms, at an Eluru 1 ATVM `4.5 Lakh Installed anticipated cost of ` 1429 crore is in progress Kaikaluru ATVM Installed Powerpet ATVM Installed Third Railway Line works Eluru CoTVM `4.5 Lakh Installed Third line works of Duvvada‐Vijayawada section for distance of 335 Kms is proposed at an anticipated cost of `3873 Eluru Improved crore. Illumination Provided Eluru Toilets `0.20 crore Constructed Chebrol Toilets `0.21 crore In Progress Vatlur Toilets `0.11 crore In Progress Kaikavaram Station Building `0.05 crore In Progress Chebrol Station Building `0.05 crore In Progress Ungutur Station Building `0.05 crore In Progress Badampudi Station Building `0.05 crore In Progress Bhimadolu Construction/ Chebrol Extension of `2.88 crore Proposed Platform.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us