Neilston) (Temporary Restriction to Use of Road) Order 2021

Neilston) (Temporary Restriction to Use of Road) Order 2021

The East Renfrewshire Council (Uplawmoor Road, Neilston) (Temporary Restriction to Use of Road) Order 2021 On the 16th April 2021 East Renfrewshire Council made the above named Order under Section 14 of the Road Traffic Regulation Act 1984, as amended by the Road Traffic (Temporary Restrictions) Act 1991, in terms of which use of a section of the following road, by the undernoted classes of vehicle will be prohibited within the stated period of time. (Note that the order will be in effect only when indicated by the display of appropriate signs in accordance with the Traffic Signs Regulations and General Directions 2016). Effects of the Restrictions: TEMPORARY ROAD CLOSURE Roads affected: UPLAWMOOR ROAD, NEILSTON – BETWEEN GLEN DOLL ROAD AND DOUBLE HEDGES ROAD (INCLUDING ORR TERRACE, MOLENDINAR TERRACE, MAKEKING TERRACE & BRIG O’LEA TERRACE AT THEIR JUNCTIONS WITH MAIN STREET, NEILSTON) Reason for the Restrictions: TO FACILITATE THE SAFE INSTALLATION OF A NEW WATER MAIN RENEWAL (SCOTTISH WATER) ON OR NEAR THIS ROAD Proposed Duration of Works: MONDAY 17 MAY UNTIL SUNDAY 4 JULY 2021. (TO BE CARRIED OUT IN 4 PHASES) Max Duration of Restrictions: THE RESTRICTIONS AUTHORISED BY THIS ORDER REMAIN VALID FOR A MAXIMUM PERIOD OF 18 MONTHS FROM THE DATE THE ORDER WAS MADE, AS PRESCRIBED BY LEGISLATION. Classes of Vehicle Prohibited: ALL - EXCEPT VEHICLES ASSOCIATED WITH THE WORKS AND EMERGENCY VEHICLES ATTENDING AN INCIDENT. ACCESS TO PROPERTIES WITHIN THE EXTENTS OF THE CLOSURE MAY BE PERMITTED BY THE CONTRACTOR ON SITE WHEN IT IS POSSIBLE TO DO SO IN CONJUNCTION WITH THE WORKS GOING ON AT THE TIME. PEDESTRIAN ACCESS WILL BE MAINTAINED AT ALL TIMES. Alternative Routes: UPLAWMOOR ROAD – GLEN DOLL ROAD – GLEN SHEE AVENUE – KINGSTON ROAD – STATION ROAD – MAIN STREET – UPLAWMOOR ROAD AND VICE-VERSA NEILSTON ERC Licence No. (c) Crown Copyright. 100023382 2021 Approved: Key: J Corrie ROAD CLOSURES DATES OF CLOSURE Roads and Transportation Controller PHASE 1 17 MAY – 30 MAY 2021 Enquiries To: PHASE 2 31 MAY – 13 JUNE 2021 [email protected] PHASE 3 14 JUNE – 23 JUNE 2021 PHASE 4 24 JUNE – 4 JULY 2021 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us